testing plan 中文意思是什麼

testing plan 解釋
測試計劃
  • testing : 測試系統
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. Plan, yanbian animal and husbandry bureau organized the training course at antu county of yanbian prefecture during sept. 6 - 15, 2006. the training was mainly on animal disease prevention and control on diagnosis and testing capacity, as well as the way of using and safe keeping vaccine

    按照中加動物健康北京項目辦的計劃,並得到該項目的資金支持,延邊州牧業管理局於2006年9月6日至15日,在安圖縣舉辦了一次「
  2. Incept mis sever, pantoschool software, kpi software and finish testing, plan to use it in september in 2006

    接收了重慶市教委派發的mis系統服務器和鵬達校園網軟體、 kpi軟體,安裝調試完畢,計劃2006年秋季正式在校園內投入使用。
  3. Based on the spaceflight technology innovation program of “ research on the testing method of reliability - - - - research on the fault diagnostic expert system and neural network ” and the pre - research defense projects of “ research on longevous service and high reliability of satellites ” of the national tenth - five - year plan, taking attitude control system of a satellite as object, the theories and the applications of the neural networks and expert system in the fault diagnosis are studied in this dissertation

    本文以航天技術創新基金項目「可靠性試驗方法研究? ?故障診斷的專家系統神經網路技術研究」和國家武器裝備「十五」預研項目「衛星長壽命高可靠性技術」為背景,以衛星姿態控制系統為研究對象,在理論和實踐兩個方面對神經網路和專家系統相結合的故障診斷技術及其在衛星中的應用進行了研究。
  4. Project agreed by the then g in c on march 11, 1997 as a pilot scheme for testing the linked project concept. revised master layout plan approved with conditions by the ctpur under the delegated authority of the tpb on september 9, 2004

    總城市規劃師市區更新於二零零四年九月九日行使城市規劃委員會授予的權力,在有附帶條件下核準經修訂的總綱發展藍圖。
  5. A plan of design for test based of boundary scan testing is introduced for this signal processing system

    接著,提出了該信號處理系統基於邊界掃描的可測性設計方案。
  6. We are hereby to declare that we will follow the certification rules and procedures of cccf and make payment for the fees arising from the application, testing, site audit and other services ; understand and accept the evaluation activity plan put forward by cccf ; cccf will not bear any legal responsibility which should be borne by the factory or salesman granted with the conformity certificate

    我們聲明我們將遵守公安部消防產品合格評定中心的認證規則和程序,支付認證所需的申請、檢驗、工廠審查及其它有關的費用,理解並接受公安部消防產品合格評定中心提出的評價活動計劃;公安部消防產品合格評定中心將不承擔獲得認證產品的製造廠或銷售商應承擔的任何法律責任。
  7. Developers should plan for between 30 % and 70 % of a projects effort to be expended on verification and validation activities, including software testing

    開發者應該計劃把一個項目中的30 %到70 %的精力用於"驗證"和"校驗" ,包括軟體測試
  8. Ntfp development and forestry model testing will be included in a village forests management plan

    非木製森林製品的開發和林業模式的試驗將包括在鄉村森林管理計劃中。
  9. And the fuzzy control technology has been studied that reduce the stator terminal voltage to achieve higher power factor through testing power factor and using certain rules. the asynchronous motor intelligence operating control system plan design has been completed. simulation design and simulation experiment of the system has been carried on, and the simulation result indicated this intelligence control system has achieved the anticipated effect

    在分析電機功率因數角的變化規律及功率因數角對晶閘管輸出電壓的影響的基礎上,提出了異步電動機在輕載或空載運行時通過檢測功率因數並經過一定規則降低定子端電壓來達到提高功率因數目的的模糊控制方法,完成了異步電動機節能運行控制系統的軟硬體設計,並進行了系統的模擬研究與實驗研究。
  10. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙帶對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  11. In this article, based on theory of the rcm technology and exception - tree, the equipment - management programmer and the faulty category in dlpec ( dalian petro - chemistry corporation ) are discussed in details, and the equipment - management patterns for the enterprise are brought forward. for all kinds of equipments, some measurements on the maintaining and governing are established ; moreover, the system function mode structure is also schemed out, which responses the working situation of equipment in the enterprise in detail and is composed of equipment technology document - management, equipment document - management, equipment integrating - management, equipment maintaining - plan management, equipment stat. analysis management, integrating - query system etc ; at the same time, the whole system codes are devised, which include equipment category code, engineering planning sort code, spare part sort code, testing report catalogue code of pressure vessel pile, equipment stat

    本文以大連石化公司的設備管理程序和設備種類為研究對象,應用rcm的技術和故障樹原理,提出了具體的適合於該企業的設備管理模式;針對各種不同類型的設備,制訂出相應的維修管理對策;並運用信息系統分析與設計方法,設計出了比較詳細的、能真實反應企業設備工作狀態的系統功能模型結構,包括:設備技術文檔管理、設備檔案管理、設備綜合管理、設備維修計劃管理、設備統計分析管理、綜合查詢系統等;同時,設計出了比較完整的系統代碼,主要包括:設備類別編碼、工程計劃分類編碼、備品備件類別編碼、壓力容器管道檢驗報告目錄編碼、設備統計類別編碼等;另外,對數據庫設計、輸入輸出設計、系統的實施與測試等提出了比較具體的方案。
  12. From the moon - vehicle in apollo plan to nowaday " spirit " and " opportunity ", which are mars vehicle made by nasa, and from battlefield patrol robot to pipeline testing robot and intelligent service robot, those all powerfully show that intelligent mobile robot is progressing with human being together

    從阿波羅登月計劃中的月球車到美國最近推出的nasa火星探測機器人,從西方各國正在加緊研製的戰場巡邏機器人、偵察車到新近研製的管道清洗檢測機器人和智能服務機器人,都有力地顯示出智能移動機器人正在與人類共同發展和進步。
  13. Combining economics, management, sociology and relative foreign researches, it presents organizing theory, principle and methodology in resettlement operation plan which were practiced in huai river project ( yancheng city ) with obvious effects. it also argues that resettlement management including funds management, contract management, project management and necessary procedures like compensation public notice, resettlement funds responsibilities, resettlement process & safety responsibilities, acceptance testing and resettlement evaluation have great importance in resettlement works of huai river project ( yancheng city )

    本論文的成果主要體現在:在借鑒國內外水庫移民研究成果的基礎上,運用經濟學、管理學、社會學的理論,對河道工程移民安置的理論和實踐及其移民的特點進行了深入的研究,提出了河道工程移民安置實施規劃的編制理論、原則及方法,並將成果直接運用於淮河入海水道工程(鹽城段)移民安置實施規劃中,規劃成果直接運用於生產實踐,取得了明顯的效果。
  14. Secondly, a ship undocking process environmental forces testing plan is made by using the orthogonal design theory. measuring the environmental forces with different wind, wave and current combination from 0 ? to 90 ? and analyzing and processing the data are finished by using the analysis of variance method. comparing the experimental results with the results calculated using the ocimf method, the reliability of using the ocimf method is testified

    二、利用正交設計方法,制定了船舶出塢過程環境載荷測量方案,完成了船舶在出塢過程中從90到0過程中在不同風、浪、流組合下的環境外力測試和分析處理,利用級差分析方法,重點分析了風、浪、流以及方向對船舶出塢的影響程度大小,並把試驗結果和ocimf方法計算結果作了比較分析,驗證了ocimf方法計算結果的可靠性。
  15. Be responsible for recommending / implementing the most efficient overall testing strategy as required by product cycling plan, including test capability plan proposal, equipment purchase, outside test location selection etc

    負責根據公司產品周期計劃建議/執行最有效的整體測試戰略,包括能力規劃建議、設備購買,測試地點選定等。
  16. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  17. Finally, the experimental results obtained at three types of laser which was used as the pump source were presented, the experimental results were analyzed and some factors which effect the testing precision and rate of the pbd technique were discussed. in the end of the paper, the lab work was summarized and the future plan was viewed

    最後給出了應用三種不同的激光器作為泵浦源而得到的實驗結果,對這些實驗結果作了對比分析,並對一些影響光熱偏轉法測量精度和速度的因素作了討論和總結,並提出了今後的發展思路。
  18. Testing plan guides by using sql server profiler

    使用sql server事件探查器測試計劃指南
  19. Compile testing plan, update it and keep it correct

    編制試驗計劃,及時更新,確保其正確性。
  20. Software testing plan

    軟體測試計劃
分享友人