the dispersion period 中文意思是什麼

the dispersion period 解釋
流散時期
  • the : 〈代表用法〉…那樣的東西,…那種東西。1 〈用單數普通名詞代表它的一類時(所謂代表的單數)〉 (a) 〈...
  • dispersion : n 1 分散,散開;散布,傳播;離散。2 【物理學】彌散,色散;【化學】分散作用;被分散物;分散相,分...
  • period : n 1 時代;期;時期;期間;階段。2 〈the period〉現代,當代。3 周期;【地質學;地理學】紀。4 終結...
  1. Using the variational method, analytical conditions for stationary pulse propagation in dense period fibers with strong dispersion management are deduced. the expression of initial soliton peak power is given. by employing the obtained formulas, the soliton evolution semi - analytically in various dispersion maps can be investigated. effects of the third order dispersion are also studied in this paper. the results show that imperfect dispersion slope compensation can cause pulse central position shift and even serious degradation of soliton shape

    利用變分方法,推導出了在強色散管理的密集周期光纖中脈沖穩態傳輸的解析條件,並給出了初始脈沖峰值功率的表達式.運用這些公式,對各種色散管理系統中孤子的演化進行了半解析的考察.三階色散也被考慮在內.結果表明:不完善的色散斜率補償將導致脈沖中心位置的偏移甚至嚴重的孤子形狀劣化
  2. A source routing framework is proposed to route traffic flows proactively over multiple paths, which tries to optimize routes for long - lived flows based on dispersity routing ; based on mathematical analysis, our approach disperses incoming traffic flows onto multiple paths according to path qualities. long - lived flows are detected and migrated to the shortest path if their qos could be guaranteed there. suggesting non - disjoint path set, four types of dispersion policies are analyzed, and flow classification policy which relates flow trigger with link state update period is investigated

    提出一種以業務量內在特性為基礎的前攝式多路路由演算法:以對業務量的內在特性分析為基礎,該方法在多路發送數據流的同時檢測非最短路徑上的長流,而後在保證服務質量的前提下將長流遷移到最短路徑上傳輸;前攝式多路路由使用以路徑質量評價為基礎的業務流分佈方法有效提高網路吞吐量,通過周期性的路徑質量評價適應時變網路狀況;模擬實驗表明,該方法可以有效提高「盡力而為」方式下的網路服務質量和資源利用率;浙江大學博士學位論文3
  3. Calculating adopts the way of finite unit spot parameter by using the character of dispersion. thus, it can get the similar answer of stress, stress strain and displacement. supervising uses strainmeters, non - stressmeters and tiltmeters, which are buried in the concrete wall to supervise the stress, tress strain, displacement during period of working and makes the forecast

    計算採用有限元法將混凝土防滲墻利用離散化變為有限單元節點參數,從而得到應力、應變、位移的近似解;監測採用應變計、無應力計及測斜儀現場埋設在砼墻體內對混凝土防滲墻在施工期及運行過程中進行監測其應力、應變、位移,從而作出預報。
分享友人