three-gorges project 中文意思是什麼

three-gorges project 解釋
三峽工程
  • three : n. 1. 三個人[東西]。2. 三歲,三時。3. 【板球】3字型。
  • gorges : 戈爾熱
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. The selection of neutral - point earthing ways of the hydrogenerator of left - bank power station in the three gorges project should be related to one - point earthing protection of the stator of its generator within one hundred percent framework

    三峽工程左岸電站水輪發電機中性點接地方式的選擇應和發電機100 %范圍定子一點接地保護相關聯。
  2. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程水輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:水輪機設計水頭的確定,負傾角葉片水輪機的應用,兩套水力設計,舍棄初期轉輪,蝸殼進行水壓試驗等。
  3. Brief description of the luffing cable - crane used for the construction of yangtze three gorges project

    三峽工程施工用擺塔式纜索起重機簡介
  4. Installation process of the miter gate of permanent navigation in the three gorges project continuation

    三峽永久船閘人字門安裝工藝措施簡述續二
  5. The high - lead bronze maintaining parts for the american imported facilities ( simons breaker and 23 stere excavator ) in the three gorges project all reached the life time of american high - lead bronze parts after being installed and run

    為三峽工程的美國進口設備(西蒙斯破碎機、 23立方米電鏟等)的高鉛青銅維修件,生產后已裝機運轉,均達到美國高鉛青銅件的使用壽命。
  6. In this paper, the key technology on the hydraulic water gate in the three gorges project is fully discussed, analyzed and tested

    論文對三峽樞紐工程中液壓啟閉機的關鍵技術進行了全面的論述、分析和試驗研究。
  7. Improvement of navigation in fluctuating backwater area during construction of three gorges project

    三峽工程施工期變動回水區航道整治
  8. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  9. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    化灌材料特性與理論指導下的灌漿工藝的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜工況工程處理對象成功處理,解決了三峽混凝土微細滲水裂縫防滲補強、三峽工程地質斷層泥化夾層加固以及江埡電站壩基溶蝕帶防滲等一系列工程技術難題,印證了該材料及技術的先進性。
  10. Design of demolition blasting of complicated structure of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰砼防滲墻復雜結構拆除爆破設計
  11. Blasting monitoring and safety control during the demolition blasting of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游圍堰混凝土防滲墻拆除爆破震動監測與安全控制
  12. Rock slope ; modes of rock mass structure ; mechanism of deformation and failure ; destabilization of slope ; the reservoir area of the three gorges project

    基巖斜坡巖體結構模式變形破壞機制斜坡失穩三峽庫區
  13. Due to the success in yantan project, the similar method are applied in three gorges project, the maximal potential vibration excitated by hydraulic disturbance of hydrogenerator set in three gorges hydropower house are estimated

    在此基礎上將本文方法應用於三峽工程,對三峽廠房在機組垂直動荷載作用下的最大可能振動作了計算預測。
  14. The construction of the three gorges project and its corresponding impact on the yangtze three gorges tourism layout leads to the structural conversion from line - shape to circle - shape, which functions as the basic condition and driving force for building the three gorges grand tourism circle

    摘要以三峽庫區?核心的大三峽旅遊圈具有文脈淵源關系和旅遊協作的基礎條件,三峽工程興建引發的三峽旅遊空間聚散效應,促使三峽旅遊由線型結構向圈層結構轉變。
  15. Research on key blocks in the surrounding rock mass of underground powerhouse, the three gorges project

    三峽工程地下廠房圍巖關鍵塊體研究
  16. The practice of the construction and management of three gorges project shows that its successful experience lies in treating correctly 10 relations well in the market economic operation, such as the relation of the project legal person responsibility system and the state macro - control, etc

    三峽工程建設管理的實踐說明,其成功的經驗在於注意處理好市場經濟運行中項目法人負責制與國家宏觀調控的關系等10個方面的關系。
  17. Abstract : the practice of the construction and management of three gorges project shows that its successful experience lies in treating correctly 10 relations well in the market economic operation, such as the relation of the project legal person responsibility system and the state macro - control, etc

    文摘:三峽工程建設管理的實踐說明,其成功的經驗在於注意處理好市場經濟運行中項目法人負責制與國家宏觀調控的關系等10個方面的關系。
  18. China three gorges project corporation ( ctgpc ) is in a important period of reorganization, and two communication departments belong to ctgpc incorporated at presently, thinking of many sides, must resolve them beginning with management. especially now, there are some failure on telephone management, such as redundancy of organization, iterative function, obsolete technique, lack of efficiency, wasteful workforce, large amount of workload and lack of accuracy so much and so on

    三峽公司正處于改制重組的關鍵時期,而原來三峽公司下屬的兩個通信部門剛剛合併,在許多方面都需要從管理入手加以解決,尤其是在目前的狀況下暴露出在電話管理方面的種種弊端,諸如機構重疊、電話管理部分功能重復、技術陳舊、工作效率低、人力資源浪費、工作量大且準確率得不到保證等問題日益突出。
  19. Climatic risk analysis of the three gorges project operation in dry season

    三峽工程建成后枯水期運行的氣候風險研究
  20. Analysis of slopes stability on bank of yangtze river in wanxian after stored water with the three gorges project

    三峽工程蓄水后萬縣江岸坡體穩定性分析
分享友人