  1. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用地震波法、鉆孔聲波法以及室內巖石力學試驗綜合評價水電站大壩趾板建基巖體工程質量是可行的,其成果可為大壩趾板建基巖體驗收提供依據。
  2. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  3. The cutoff wall near the dam axis, the consolidation grouting and the curtain grouting for the foundation, and the high pressure jet - grouted cutoff wall at the toe of the dam form a vertical anti - seepage system for the dam foundation

    大壩軸線附近的防滲墻、基巖固結和帷幕灌漿,以及上游壩腳處的高壓擺噴防滲墻,在壩基構成了垂直防滲體系。
  4. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  5. Experimental research on grouting soft rock foundation under toe slab of siping concrete faced rockfill dam

    寺坪面板堆石壩趾板軟巖基礎灌漿試驗研究
  6. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水庫大壩為目前在建的河床趾板建在深厚覆蓋層上國內首座百米級的混凝土面板堆石壩。
  7. The effect of complex groundsill and dam body ' s construction process can be considered conveniently when finite element method is used to analyze dam body ' s stress. but there is no design criterion correspondingly because of the stress concentration that is caused by load at dam heel and dam toe under elastic state. furthermore, its value is easily affected by mesh size

    有限元法分析拱壩壩體應力可以較方便地考慮復雜地基條件和壩體施工過程的影響,但是由於彈性狀態下拱壩壩踵、壩趾處受荷載后的應力集中現象,而且其數值受網格尺寸影響較大,因此至今無與之相應的設計準則。
  8. The influences of the properties of alluvium deposit, the properties of diaphragm wall concrete, the construction sequence of diaphragm walls, the distance between diaphragm walls and dam toe and the shape of diaphragm walls on the stress - deformation behaviors of diaphragm walls of concrete face rockfill dams were studied

    研究了覆蓋層特性、防滲墻混凝土特性、防滲墻施工順序、防滲墻與壩趾之間距離和防滲墻形狀對于面板堆石壩防滲墻應力變形性狀的影響。
  9. According to new idea on toe slab shape design suggested by kuke and in combination with the toe slab shape design of shuibuya concrete face rockfill dam, the " y " line positioning, the shape parameter determination of standard profile, the coordinate calculation related to toe slab shape are presented in this paper

    摘要根據庫克建議的趾板體型設計新思想,結合水布埡面板堆石壩趾板結構的具體設計,對趾板體型設計相關的" y "線的定位、標準剖面體型參數的確定、趾板坐標的計算等進行了闡述。