top load 中文意思是什麼

top load 解釋
尖峰負荷
  • top : n (opp bottom foot)1 頂,頂部,頂端。2 頭,頭頂;尖端;樹梢,樹頂;(事物的)上層部分。3 最高位...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. Aggrading streams heavily charged with bed load may fill their channels nearly to the top of the banks.

    帶有大量推移質的堆積河流可以把河槽淤高到幾乎與岸頂齊平。
  2. The regularities of pile - top reaction distribution, the carrying load ratio between pile and raft, the settlement and the imparity settlement of foundation in the frame - tube structure and the single wall are influenced by some factors such as the stiffness of the superstructure, the intensity of the soil under the piles, the length and radius of the piles, the distance between the piles, the thickness and the suspended width of the raft

    對豎向荷載作用下的空間筒中筒結構、樁筏基礎和地基進行了三維有限元分析。研究整體結構和單片墻結構在上部結構剛度、樁端土強度、樁長、樁徑、樁距、筏板厚度、筏板外挑寬度等影響因素變化時的樁頂反力分佈規律、樁筏荷載分擔比、樁基沉降和差異沉降規律。
  3. Abstract : the paper probed the analysis on the adding mode of perpendicular load in multistorey building structures, the bending moment of frame side beams and the top, the bending moment of secondary beams, the difference between the tie - beam, plane - frame analysis and the space analysis on the path of conduct force, ect. it can be used as a reference when probing these problems

    文摘:討論了在多項高層建築結構分析中垂直荷載加載模式的選擇,框架邊梁和次梁端部的彎矩計算,連梁問題和平面框架分析與空間分析在傳力路徑上的差別以及單片剪力墻平面外彎矩等問題,可供同類結構內力分析時參考
  4. Prospect dtzziii series weight - load controller sensor part adopt bridge - type strain piece sensor, and applies steady installation technology to insure sensors running steady and long - range. we provide multi - kinds of sensor installation method. sensor can be installed under the car bottom, on elevator rope hitch plate, on car top wheel and axle and car top beam to work together with controller

    前景dtzziii系列稱重控制儀的稱重傳感器部分採用橋式應變片傳感器,應用平穩安裝技術確保長期穩定運行稱重傳感器提供多種安裝方式,可以安裝于活轎底電梯的轎廂轎底電梯繩頭板處電梯轎頂輪軸處電梯轎頂橫樑上面等,與控制儀配合使用。
  5. Finding a feasible and efficient load balanced strategy for the ultra - scalable multi - plane multi - stage switch architecture is a top of nowadays research. the dissertation proposes a two - stage load balanced scheme for the ultra - scalable multi - plane multi - stage switch architecture based self - routing and non - blocking permutation benes network. the approach uses reasonable and efficient logical queueing strategy and schedule scheme in ingress traffic managers and switch planes to realize the two - stage load balancing of ip traffic which for different destination addresses

    本文提出一種適用於基於完全可重排無阻塞benes拓撲構建的多平面多路徑(多級)超大容量交換結構的兩級負載均衡策略,通過在輸入流量管理器和benes交換平面內部實施合理而高效的隊列組織調度方法,有效實現了基於不同目的地址的ip流量在兩個層次上的負載均衡,較好彌補了ciscocrs - 1系統在平面選擇和中間級選擇時所採用的簡單隨機或輪循方案的不足。
  6. At first, based on the results of in - situ load tests, the load - settle curves are acquired, and the effects of different reinforcement parameters are presented. these parameters include the linear density ratio ( ldr ) ; the location of the top layer of the geobelt measured from the bottom of the load plate ( u ) ; the different materials of geobelt ; the number of reinforcement layers ( n ) and the distance between the two layers of geobelt ( a h ). these results show that the bearing capacities of the reinforced composite foundation can be improved and the settlement can be reduced

    首先,通過現場載荷試驗,獲取了加筋墊層復合地基荷載-沉降曲線,從筋帶鋪設的密度、筋帶的首層間距、不同筋帶材料、加筋層數以及雙層筋帶的層間距等幾個方面分析了以上加筋參數對加筋復合地基承載力的影響,指出筋帶的存在提高了加筋復合地基的承載力,減小了沉降。
  7. Under the load of high basicity occur three circular crevices from top to bottom at the furnace hearth parallel to the furnace shell

    在高堿度負荷下,該高爐爐缸部位產生了平行於爐殼的至上而下的三條環裂。
  8. Problems occured in the anchoring of overhung tourist hall on top of the tv tower and tower drum due to construction mistakes. it was introduced in this paper that two non - binding prestressed girder beams are respectively set in corresponding locations as the anchor beam of overhung radial support beam of tourist hall, thus the integrity of the tower drum and transmission of the load were guaranteed

    由於施工失誤,作為電視塔頂的外懸游覽廳和塔筒間的錨固發生了問題,本文介紹了採用在相應位置設置兩根無粘結預應力大樑分別作為游覽廳屋面和樓面徑向懸挑支承梁的錨固梁,確保了它和塔筒的整體性和荷載的傳遞。
  9. Based on biot ' s theory, the basic equations and solution conditions were established for the consolidation problem of the composite foundation with single column considering soil - column interactions when load was applied on the top of column only or applied on the top of both column and soil, and the solution for deformations of soil and column were obtained in the forms of laplace and hankel transformation

    基於biot理論,分別對在樁頂受外荷載作用和樁土共同受外荷載作用的情況下考慮樁土相互作用的單樁復合地基固結問題建立了基本方程和求解條件,並在laplace變換域和hankel變換域內得到了土體和樁體的變形解答。
  10. Load : 0. 5 - 3t. jumbo bags are ideal packing for chemical, cement, grain, mineral, and other goods in the shape of powder, granular and lump. top : spout in, and bottom : spout out

    我公司在2004年產值已超2000千萬元統計局資料,我公司有著成熟的生產工藝,優越的產品質量,良好的服務質量。我們的產品銷往全國及海外
  11. The following conclusions are gained : ( 1 ) the located shear band prongs the ligament near the top crack tip and the structure may occur shear - mode fracture at the angle of 155 ? to crack when load is 87. 92mpa ; the mode of fracture of the flange joint structure is not possible to be void - mode ; ( 2 ) it is proved that loading and then unloading repeatedly can not increase the possibility of invalidation of the structure when the times of loading and unloading are not too more when load is operating pressure ; the structure is safe when the vessel is operating ; ( 3 ) in the fe model of the thesis, not considering the influence of water pressure test which is in the process of fabrication of vessel in fe results in larger deviation in analysi

    得出了以下結論:在8792mpa的載荷下筒體一封頭連接結構處的集中剪切帶貫穿韌帶,可能發生沿與原裂紋線成155 「角方向剪切型斷裂;筒體一封頭連接結構不可能發生韌窩型斷裂; ( 2 )在工作壓力下進行次數不多的反復加、卸載,結構不會破壞,也不會喪失安定性:結構在工作狀態下是安全的; m在本文的彈塑性有限元模擬計算中,對于裂紋尖端進行力學分析時,不考慮壓力容器製造過程中水壓試驗的影響,將導致計算結果出現較大的偏差; ( 4 )筒體完全屈服時的載荷為92石3mpa ,封頭完全屈服時載荷為86
  12. Meanwhile, arched roof is generally set on beam at the top of pillar. since column adaptor may has displacement ( specially horizontal displacement ), load - carrying capability of the structure will step down, and bending rigidity of the column also has emphatic influence on it

    同時,拱型屋蓋一般是通過邊梁支承在柱子上,由於柱頂產生位移(尤其是水平位移) ,支承在柱子上的拱型屋蓋的承載力較固定支座的拱型屋蓋有所降低。
  13. In order to predict high - strength bolts pretension and contact - friction in contact zone, status nonlinear in contact zone is adopted in fem model. the computation and analysis on the behavior of beam - to - column rigidity joints subjected to constant axial pressure on the top of column and cyclical load at tip of beam is carried out

    實體模型的建立,考慮了接觸區的狀態非線性,以模擬高強螺栓的預拉力、螺栓連接區的摩擦接觸,對承受軸力的樑柱剛性連接方式在循環荷載作用下的滯回性能進行了計算分析。
  14. Under the policies of " build roads with load, return the load by toll ", the express road in our country has developed rapidly. transportation mileage is the second top in the world

    在「貸款修路,收費還貸」政策的推動下,我國高速公路迅速發展,目前通車里程已躍居世界第二位。
  15. Secondly, the paper analyzed the behavior of isotropic and orthogonal anisotropic materials " cws on the basis of above theory and software. regularities of cws " deformation inner force and shared load and earth pressure in excavating stage and driving stage were gained. regularities influenced by material features top beam excavating depth sidewall depth properties of soil layers rear backing and location of load were also obtained, especially rules of display degree exerted by circular and vertical loads were also obtained

    通過分析,得到了形成階段及頂進階段圓形工作井的變位、結構內力、分載及土壓的分佈規律及材料性質、頂冠梁及圍檁、開挖深度、井壁插深、土層性質、后靠背、頂載作用位置等因素對結構受力性狀的影響規律,特別是得到了工作井在受力時結構環向與豎向承載作用發揮程度的規律。
  16. It is a top load bridge with a clear span of 288m, which is maximum one of the same structural system in asia. the main arch rib uses 8 steel tube of 920mm joined by web members and transverse truss to form a space truss. the soldier piles on the arch are made of bent frame to make the shape both artistic and novel

    梅溪河大橋為一凈跨達288米的上承式鋼管混凝土拱橋,是目前亞洲同類橋型中跨度最大的橋梁,其主拱肋採用8根920mm的鋼管,通過腹桿及平聯形成鋼管混凝土空間桁架,拱上立柱亦採用鋼管混凝土排架,造型新穎美觀。
  17. So how to transfer scientifically self - balanced test data into top load curve according to its actual working behavior, become the obstacle of its practical application. in accordance with actual forcing behavior and reaction mechanism between pile and soil, the article analyzes the relation between top part and bottom part, load transferring mechanism and difference with other loading way by ansys program. so the reliability of determine bearing capacity by self - balance method has been proved

    本文根據自平衡加載方式下樁身的實際受力狀況、樁土間的相互作用機理以及單樁破壞機理,建立了單樁的離散元模型,採用ansys通用分析軟體,選取合理的單元類型、材料特性等,數值分析了基樁在自平衡加載方式下上下樁段的相互關聯、荷載傳遞機理以及與其它加載方式的區別,論證了採用自平衡試樁法測定單樁極限承載力的可行性。
  18. From the practice view, sif investment has happened the historical stage, with the population aging, the great load of government expenditure, financial innovation and financial deepening, etc ; especially when the success of sif management reform characteristic of competition and privatization hi latin america, it reached at the top of the latter

    在實踐來看,社保基金投資是隨著人口老齡化、財政支出負擔加重、金融創新和金融深化等逐步登上歷史舞臺的,尤其是拉美國家以私有化、競爭性為特徵的社保基金改革的成功,更使之達到如日中天之境界。
  19. The contrast test between self - balance test and top load test has been done applying the research of the article, it shows that the transferred curves are well consistent with top load curves, so it can satisfy the engineering requirement and its accuracy can amount to about ninety percent

    結果表明:自平武漢理工大學碩士學位論文衡試樁法與傳統靜載試驗具有較好的一致性;採用本文的提出的數據轉換分析方法,轉換曲線與傳統靜載曲線吻合性較好,極限承載力的判定誤差在10 %左右,能夠滿足工程精度的要求。
  20. Based on above three methods of transferring self - balanced test data into top load data have been provided and relative computer program has been edited

    結合本文的研究成果,在實際工程中進行了自平衡試樁法與靜載試驗的對比試驗。
分享友人