tower section 中文意思是什麼

tower section 解釋
機膛
  • tower : n 塔,樓塔;城堡;碉堡;要害地;〈罕用語〉(負傷鳥的)筆直向上飛;〈美國〉鐵路信號所。 a bell tow...
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. By mail drop - in cheque in person or through representative at the foreign domestic helpers section of the immigration department at 6th floor, immigration tower, 7 gloucester road, wan chai, hong kong ; or in person or through representative at the six immigration branch offices at the following addresses

    親自或授權代表前往香港灣仔告士打道七號入境事務大樓六樓入境事務處外籍家庭傭工組繳交,或把支票寄往該處或放入該處的投遞箱內。
  2. With copies of supporting documents by post to the right of abode section of the immigration department address : 25 f immigration tower, 7 gloucester road, wan chai, hong kong

    ) ,連同證明文件的副本,以郵遞方式寄往入境事務處居留權組辦理。 (地址:香港灣仔告士打道七號入境事務大樓廿五樓)
  3. The completed rop145 together with copies of supporting documents should be sent by post to the right of abode section of the immigration department address : 25 f, immigration tower, 7 gloucester road, wan chai, hong kong

    (地址:香港灣仔告士打道七號入境事務大樓二十五樓)當你的子女的永久性居民身份證資格獲核實后,他們在香港的逗留條件(如有者) ,將會被注銷。
  4. You may send the application form direct to the nationality sub - section of the hksar immigration department address : 4th floor, immigration tower, 7 gloucester road, wan chai, hong kong together with bank draft for application fee and photocopies of supporting documents

    你亦可將填妥的申請書連同證明文件影印本及申請費用的銀行匯票郵寄到香港特別行政區入境事務處國籍分組(地址:香港灣仔告士打道七號入境事務大樓四樓) 。
  5. You may send the application form direct to the nationality sub - section of the hksar immigration department address : 4th floor, immigration tower, 7 gloucester road, wan chai, hong kong together with the bank draft for application fee and photocopies of supporting documents

    你亦可將填妥的申請書連同證明文件影印本及申請費用的銀行匯票郵寄到香港特別行政區入境事務處國籍分組(地址:香港灣仔告士打道七號入境事務大樓四樓) 。
  6. The panel pursuant to section 32 of the builders lifts and tower working platforms ( safety ) ordinance ( chapter 470 ), disciplinary tribunal panel is established of which the

    根據建築工地升降機及塔式工作平臺(安全)條例(第470章)第32條的規定,紀律審裁委員團是由環境運輸及工務局局長( "局長" )委任的
  7. British embassy cultural and education section 3 - 4 f landmark building tower 18 dong san huan bei lu beijing 100004

    地址:北京市東三環北路8號亮馬河大廈辦公樓1座4層
  8. That specialty is that high is greater than dimension of cross section. at present, tv tower, transmit electricity line tower tower used transmission signal of microwave navigation tower were build stampedely

    目前,電視塔、輸電線路塔、微波信號傳輸塔、導航塔等各種適應工程應用的塔架蜂擁而起,使得塔架結構的研究被提上日程。
  9. The results indicate that the position of sensitive plates is located at the section of middle or upper in tower but not near by feeding plate, and the smaller reflux ratio, the closer overhead of distillation tower. accurate calculation for flash is solved using matlab, and the result is correct and reasonable. complicated multi - components distillation and crude distillation are simulated using chemcad, and results are reasonable about profiles of flow for vapor and liquid as well as temperature in the tower

    數值分析的結果表明精餾塔靈敏板位置並不在進料板附近,而是位於精餾段的中上部,且迴流比愈小,愈靠近塔頂;利用matlab實現了蒸餾過程的嚴格計算,與參考值比較,結果正確、合理;藉助于chemcad進行常減壓塔的穩態模擬計算,得出了流量和溫度在塔內的分佈,經過理論分析,結果合理,可為實際生產提供參考。
  10. The curve of arch rib, rib section bending, splice of rib sections, seperator of tube, bracing plates, bracing system, meeting of arch, concrete pumping, hangers, tie - rods, the tower of the cable crane and the guy ropes, technical specifications of cfst arch bridge are discussed

    對鋼管混凝土拱橋的拱軸線選用、鋼管節段彎制、節段拼接、管內分隔倉、綴板設計、聯結繫系統、合龍設計及其細節、管內混凝土的泵送、吊桿、系桿、纜索吊機與扣索塔架、技術規范等12個問題進行了探討。
  11. A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented. many aspects of jinma bridge are researched and analyzed, such as the design method, configuration of the superstructure, section choice of the tower, design and construction methods of the deep - water bases, the stiffness of the cooperated rigid frames, strengthening way in the tower. it is concluded that this new structure is the economical, aesthetic and suitable project for the large - span situation

    主要內容和結論如下: 1 、提出了獨塔斜拉橋與兩側剛構相連接的新型協作體系斜拉橋結構形式,並對該橋的方案比選、設計思路、橋面系結構形式、塔柱截面設計、深水基礎的設計及施工方法、協作剛構的剛度選取、塔柱的直束加固等方面作了詳細地計算分析和比較。
  12. Thirdly, for the sake of convenience for calculating the section stiffness of prestressed concrete tower drum, this paper interprets the relationship between the stiffness dropping - coefficient of prestressed concrete tower drum cross and prestress degree. based on the cross stiffness coefficient under different prestress, a brief method for calculating the stiffness dropping - coefficient is presented in this paper

    第三,為了便於預應力混凝土塔筒截面剛度的計算,本文對塔筒截面剛度降低系數與截面預應力度的關系進行了研究,並根據不同預應力度下的截面剛度降低系數,歸納總結出一種簡單的剛度降低系數計算方法。
  13. Music office a p section, 25 f wanchai tower, 12 harbour rd, wanchai, hong kong

    香港灣仔港灣道12號灣仔政府大樓25樓音樂事務處總辦事處活動及推廣組
  14. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過索塔錨固區節段足尺模型試驗結果和有限元模擬分析比較,結合索塔受力的實際工況,對異型截面斜拉橋索塔錨固區節段最不利斷面在環向預應力與索力共同作用下塔壁的應力響應進行了研究。
  15. The benguela belize structure a tower the immersed section of which weighs over 40 000 tons and is located in an area of the sea that is 390 meters deep

    本格拉?貝里斯鉆油平臺海面以下部分重4萬噸,所在海區深390米。
  16. Bubble tower section

    泡罩塔區段
  17. Next to them, the men of tekoa repaired another section, from the great projecting tower to the wall of ophel

    27 [和合]其次是37提哥亞人又修一段,對著那凸出來的大樓,直到俄斐勒的墻。
  18. After him the tekoites repaired another section, opposite the great tower that projects out and to the wall of the ophel

    27其後是提哥亞人修造另一段,對著那凸出來的大樓,直到俄斐勒的墻。
  19. A section of electric road between lau sin street and yacht street will be closed to traffic, except vehicles heading for park tower

    (七)除往柏景臺外,介乎留仙街與帆船街之間的一段電氣道將會封閉。
  20. After complete demolition, excavation and reconstruction, the huinan eastern shopping mall will have an underground parking lot with 120 parking places, a base which is six levels high, and a tower section on top of the base which is 23 levels high including a level for building equipment, for a total height of 29 stories

    規劃重建后的「精品商廈」為一幢主體高24層的塔樓帶六層裙房的高層建築, 1 - 6樓每層建面3000 , 8 - 24層,每層建面1500 。
分享友人