train graph 中文意思是什麼

train graph 解釋
列車運行圖
  • train : vt 1 訓練;培養,養成;鍛煉(身體);【園藝】使向一定方向生長,整形,整枝 (up; over)。2 瞄準,...
  • graph : n. 1. 【數學】曲線圖;坐標圖,圖表。2. 統計曲線。vt. 用圖表表示,把…繪入圖表。n. 膠版。vt. 用膠版印刷。n. 【語言學】1. 詞的拼法。2. 表示音素的最小字母單位。
  1. A description was carried out on the complicated epicyclic gear train by adopting the functional schematic diagram and the knowledge of graph theory

    摘要採用功能示意圖和圖論知識對復雜周轉輪系進行描述。
  2. Finally, the thesis discusses some concrete techniques in drawing train graph, particularly focusing on the way of organizing data which are used to draw graphs

    接下來,論文還討論了列車運行圖的繪制實現,重點對繪圖數據初始化方法進行了分析設計。
  3. Train graph is the base of railway transportation management and the working plan of transportation department

    列車運行圖是鐵路列車運行組織的基礎,是鐵路運輸部門的工作計劃。
  4. Finally, this paper studies the problem of the selection of overtaking station and the proportion of train interval by computor simulation of train graph making on shanghai urban rail transit line

    並以上海某市域快速軌道交通線為例,通過計算機模擬鋪畫列車運行圖的方法,對開行快慢車后越行地點的選擇以及列車始發的均衡性問題進行了分析研究。
  5. Current train graph

    當時的運行圖
  6. The new train actual graph information management system can provide some new ways to analyse and manage the train actual running data, and greatly improve the work efficiency of the railway management of different railway departments, such as locomotive and dispatch department

    列車實績運行圖信息管理系統的建立,將為機務、調度等部門進行事後分析管理提供新的方法,較大地改善目前列車實績運行圖管理的落後現狀。
  7. Train graph and timetable are the working plan and foundation for train operation management

    列車運行圖和運營時刻表是城市軌道交通行車組織的工作計劃和基礎。
  8. This thesis is mainly concerned about how to design and realize a new information management system of actual train graph

    本論文就列車實績運行圖信息管理系統的設計和實現進行了研究。
  9. In order to make full use of these data in railway management department at all levels, it is essential to set up a new management information system of actual train graph

    為了使這部分列車實績運行數據在各級管理部門得到更有效的利用,非常有必要建立相應的列車實績運行圖信息管理系統。
  10. Since 1960 ' s, china has made many great achievements in the field of computer - made - base train graph. however, the information management of actual train graph is still in the lower level

    自20世紀60年代以來,我國在列車基本運行圖的計算機編制方面取得了許多成果,但是由於各種條件的限制,列車實績運行圖的信息化管理還停留在較低的水平。
  11. By means of fundamental circuit of the topologic graph, the equation of fundamental circuit was established and a motion analysis was carried out on the gear train

    通過拓撲圖中基本迴路建立基本迴路方程,對輪系進行運動分析。
分享友人