tuen mun-yuen long corridor 中文意思是什麼

tuen mun-yuen long corridor 解釋
屯門至元朗走廊
  • tuen : 蒂恩
  • mun : 曼恩
  • long : n 朗〈姓氏〉。vi 渴想,極想,渴望 (for 〈古語〉 after to do)。adj (longer longest )1 長,長的...
  • corridor : n 【建築】走廊;通路;【築城】覆道。 corridor carriage 〈英國〉有走廊的客車。 corridor train 通廊...
  1. Early in the next decade. development is spreading to the tuen mun - yuen long corridor

    區內發展正沿屯門至元朗走廊擴展。
  2. Civil engineering - land development - yuen long - tuen mun corridor : engineering works for new residential areas at hung shui kiu and san hing tsuen

    土木工程-土地發展-元朗至屯門走廊:洪水橋及新慶村的新住宅區工程
  3. New territories north development civil engineering - land development - yuen long - tuen mun corridor : engineering works for new residential areas at hung shui kiu and san hing tsuen

    新界北部發展土木工程-土地發展-元朗至屯門走廊:洪水橋及新慶村的新住宅區工程
  4. Route 2 - a direct link between kwun tong and east kowloon via the airport tunnel underneath the old kai tak airport runway. this route extends westward and runs on the western kowloon corridor linking west and north - west kowloon with tsuen wan and tuen mun in the west. the trunk road extends further north from tuen mun to yuen long via the yuen long highway

    二號干線-連接觀塘及九龍東部的幹道,途經舊機? ,然後向西伸延,經西九龍走廊,把西九龍和西北九龍與荃灣及屯門連接,並再由屯門經元朗公路向北伸展至元朗。
  5. Development has spread to the tuen mun - yuen long corridor. development in yuen long new town is being extended southward. infrastructure works for the southern extension area commenced at end - 2002 for completion by 2005

    元朗新市鎮的發展已向南伸延,有關的基礎建設工程,於二零零二年年底開始動工,計劃於二零零五年完成。
  6. New development nodes should be planned along strategic railway lines. the west rail will give opportunities along tuen mun - yuen long corridor - where most of the areas are flat land and are away from environmentally sensitive wetland conservation sites

    D - 46新發展樞紐應沿著策略性鐵路干線來規劃。屯門至元朗走廊沿線大部份都是平地,而且遠離具高度保育價值的天然濕地,西鐵將會為這地方帶來發展機會。
分享友人