tunnel area 中文意思是什麼

tunnel area 解釋
隧道區;隧道區域
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  1. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道防排水結構設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。
  2. Mining area tunnel arrangement in high gas coal seams

    高瓦斯煤層采區巷道布置
  3. Evaluation of the effect of collapse in top area of a double - arched tunnel on its the secondary lining

    雙連拱隧道洞頂坍方對二次襯砌穩定影響評價
  4. According to time of operation, the buses are divided as follows : numbers that start with " 2 " are morning and evening rush hour buses, numbers that start with 3 are night buses ; according to location, buses are divided as follows : puxi buses, pudong buses, buses that cross the river including tunnel and bridge lines, and suburban area buses [ 700s & 900s ] ; according to payment method, the buses are divided into : single - ticket rmb 1 ( lines of 13 kilometer or less from end to end ) and rmb 1. 5 ( lines of 13 kilometers or more from end to end ) ticket - sellerless buses ( most two digit city buses and three digits buses starting with " 1 ", " 2 ", " 7 " are of this kind ; no change will be made, but terminal stations and hubs will have rmb 1 and rmb 1. 5 ticket booklets for sale, 50 non - refundable tickets per booklet ), and also single ticket rmb 2 air - conditioned buses and scaled - price ticket special lines ( including specialty coach lines starting with " 5 ", pudong specialty lines starting with " 6 ", mid - size coaches that start with " 8 ", double - decker buses and air - conditioned coaches that start with " 9 ", as well as the ten air - conditioned tourism lines [ and airport buses ] )

    按運營時間分,有:日間公交車、 「 2 」字頭的早晚高峰車和「 3 」字頭的夜宵車;按地域范圍分,有浦西的、浦東的、過江的(含大橋、隧道線)和郊區線;按票務方式分,有單一票價1元(全程13公里以下的線路)或1 . 5元(全程超13公里的線路)的無人售票車(市內公交號碼為兩位數的或三位數中「 1 」字頭、 「 2 」字頭、 「 7 」字頭的線路絕大多數是無人售票車,自備零錢,不找零,公交終點站、各主要交通樞紐均有1元和1元5角兩種面值的公交預售票出售,每本50張,售出不退) ,還有單一票價2元的空調車和多級票價的專線車(有「 5 」字頭的大巴專線、 「 6 」字頭的浦東專線車、 「 8 」字頭的中巴專線和「 9 」字頭的雙層車或空調大巴,還有十條空調旅遊專線) 。
  5. The calculated result from an example shows that the stable sectional area reduces with the increase of working head, or the decrease of the tailrace tunnel length

    計算結果表明,尾水調壓室斷面面積隨水輪機工作水頭的增大或尾水洞長度的縮短而減小。
  6. The proposed leisure tunnel concept is to enhance the pedestrian linkage between tseung kwan o and the clear water bay beach area

    建議的消閑隧道概念是為了改善將軍澳與清水灣沙灘區之間的行人連接設施。
  7. The requirements for decking over part of the existing tunnel portal area of whc are provided in annex 4. 7 of volume two of ifp

    有關在西區海底隧道現有的部分隧道口區加建上蓋的規定,請參閱發展建議邀請書第二冊附件4
  8. Note : tunnel includes merging diverging area immediately outside tunnel

    注:隧道範圍包括管口兩端的交通匯聚及擴散區
  9. The dynamic characteristics of evaporation process for naphtha and crude oil were researched in three aspects of different wind speed, evaporation area and relative location of evaporation surface to ground in wind tunnel

    摘要從環境風速、蒸發面積和蒸發液池與地面相對位置3方面分別對石腦油和原油的蒸發動力學特性進行了風洞實驗研究。
  10. Construction scheme of tunnel passing through landslide area and fault zone

    穿越坍方區及斷層帶的隧洞檢修洞施工方案
  11. Transport department - tunnel area and expressway signals

    運輸署-隧道區信號燈
  12. Tunnel area and expressway signals

    隧道區信號燈
  13. The dissertation detailedly explains the engineering geology conditions of zhe gu mount tunnel area, and has researched the crustal stress development process and the regulation of distribution. according to mounts of site tracing investigations, author has researched the formation mechanism of wall rocks at zhe gu mount tunnel. on the base of engineer geology analysis, applying the modern support theory and construction conception of underground engineer, and combining with modern monitor technique and numerical simulation, has researched and discussed about support, forecast and information design - construct etc. three phase on large deformation " prevention

    本文詳細闡明了鷓鴣山隧道區工程地質條件,對隧道區地應力場演化過程及分佈規律進行了研究;基於大量的施工現場跟蹤調研,研究了鷓鴣山隧道圍巖大變形的形成機制;在工程地質分析的基礎上,運用地下工程現代支護理論和施工理念,結合現代監測技術和數值模擬方法,從大變形的支護、預測、信息化設計施工三個方面對大變形的防治進行了探討。
  14. Groundwater age determined with environmental tritium in qinling tunnel area

    利用環境氚定量確定秦嶺特長隧道地下水年齡
  15. You must not enter or walk in a tunnel area

    行人不得進入隧道區域。
  16. Traffic signs mark the beginning and end of the tunnel area

    區域的起點和終點,都有交通標志說明。
  17. You must not enter or use a tunnel area

    不準進入隧道區域內。
  18. Traffic signs mark the beginning and end of a tunnel area

    隧道區域的起點和終點,都有交通標志說明。
  19. 66. sign marking start of tunnel area

    66 .隧道區域開始
  20. 67. sign marking end of tunnel area

    67 .隧道區域終止
分享友人