tunnel bearing 中文意思是什麼

tunnel bearing 解釋
推力軸中間支撐軸承
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • bearing : n 1 忍耐,忍受。2 態度,舉止,風采,姿態。3 關系,影響,方面,聯系 (on; upon); 意義。4 〈常 pl ...
  1. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如果能使錦屏工程引水隧洞灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護結構以及排水措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。
  2. Pillow block or tunnel shaft bearing

    軸道軸承
  3. Tunnel shaft bearing

    中間軸軸承
  4. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧道拱部結構過于扁平,開挖后發生二次應力分佈,拱腳處的應力過大,要求有較大的地基承載力,拱腳開挖時必須採用光面爆破,保證圍巖的完整性和不受擾動,開挖后及時封閉,防止該處積水軟化圍巖。
  5. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容重、側壓力系數、垂直荷載高度或埋深、圍巖的彈性抗力系數、支護結構的彈性模量、混凝土容重、結構的厚度以及混凝土的抗扭與抗壓強度等與襯砌結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪峰山隧道模注混凝土襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均值和方差,並計算出了相應的襯砌結構可靠指標。
  6. With the increase of lateral pressure modulus, the magnitude of principal stress decreases and the direction of it is hardly changeable ; with the increase of the angle between the direction of the maximal horizontal principal stress on magnitude and the fault bearing, the magnitude of principal stress increase and its direction can hardly change ; with the increase of the elastic modulus of rocks, the magnitude of principal stress increases and the direction changes more ; with the increase of pr, the magnitude of principal stress decreases and the direction changes more ; with the increase of lateral pressure modulus, the principal stress at hance, the tress at topmost arch, bottom arch and principal stress at lateral arch decreases, with the increase of the depth of tunnel, the stress of surrounding rock also increases, and the poorer the quality of surrounding rock is, the little its principle stress is

    分析得出,隨著側壓力系數的增大,主應力量值減小,主應力方位難改變;隨著與斷層走向的夾角增大,主應力量值增大,應力方向難改變:隨著巖石的彈性模量的增大,主應力量值增大,方向變化越大;隨著泊松比的增大,主應力量值減小,方位變化越大。隨著側壓力系數的增大,頂、底拱處的各應力值增大,拱腰處的主應力減小,剪應力增大,側拱處的各主應力減小,同一側壓力系數的條件下圍巖質量越差,各應力值也越小;隨著洞室埋深的增加,圍巖壓力也增大,圍巖質量越差,其應力值也減小。
  7. With the construction of the west of our country developing at top speed and the need of construction of mountainous expressway, the tunnel engineering, especially the tunnels on the mountainous expressway, will be increased. if the design of support structures of the tunnel still adopts traditional design methods, it will be difficult to give full considerations for the reasonability in economy of the sections of the support structures and for the reliability of bearing capacity and stability of the support structures

    隨著我國西部建設的高速發展和山區高速公路建設的需要,隧道工程特別是山區高速公路隧道工程將會日益增多,隧道支護結構的設計若仍採用傳統的隧道支護結構設計方法將難以充分兼顧支護結構斷面經濟上的合理性和支護結構承載力與穩定性的可靠性,往往安全系數偏大,不能達到「最優設計」的目的。
  8. Considering that the characteristics of our country ' s highway tunnels are always of long spans, tabular and of various geometry, by means of thorough analysis of the different problems existed in the design of support structures of the tunnels at present, this paper pays special attention to the two key problems, optimization method of form selection of structural section of the tunnel as well as the stability and bearing capacity of the support structures, in the design of the long and large tunnel on high - class highway, introduces the simplified complex - form optimum method in the structure optimization theory, discusses the optimum design model of lining section of highway tunnel with satisfying demands in building clearance, ventilation and load conditions, puts forward an optimization method of form selection of three different kinds of lining sectional forms ( i. e. single - center circle, three - center tabular circle and three - center sharp circle ), establishes a complete set of systematic optimum design the ory and method of long and large tunnel on high - class highway, develops the corresponding computer software used on the planned xuefeng mountain highway tunnel on shaoyang to huaihua expressway in hunan province for optimization of form selections of the structural sections, and obtains a series of relatively reasonable structural design parameters

    本文針對我國公路隧道多為大跨度、扁平、幾何形狀呈多樣化的特點,通過深入分析目前隧道支護結構設計中存在的各種問題,抓住高等級公路長大隧道設計中隧道結構斷面的優化選型及隧道支護結構的穩定性與承載能力兩個核心問題,引入結構優化理論中的簡易復合形優化方法,深入探討了滿足建築限界、通風條件、受力狀態約束等條件下公路隧道襯砌斷面優化設計模型,提出了三種襯砌斷面形狀(單心圓、坦三心圓和尖三心圓)的優化選型方法,建立起一套完善的高等級公路長大隧道的系統優化設計理論與方法,並開發出相應的計算機程序,用於擬建的上海至瑞麗國道主幹線湖南省邵陽至懷化高速公路雪峰山長大高速公路隧道的結構斷面優化選型,得出了一系列較為合理的支護結構設計參數。
  9. This text handles a tunnel for draining off water in huangjiawangarbage ground, in yichangcities is for the example, intro - ducedthe support techniqueofthe anchored bar, thesprayed concrete associated withthereinforcement matwhich is used in theengineeringconstruction, and pass to monitor, express the support technique can develop to the maximum bearing, and become the passive support becomean active support, so the the support technique guarantees the stabilizationof the tunnel and the normal proceeding of theconstruction with theengineering

    摘要以宜昌市黃家灣垃圾處理場排洪洞為例,介紹了錨噴網支護技術在淺埋軟弱圍巖隧洞施工中的應用,並通過監測,表明錨噴網支護能最大限度地發揮圍巖的自承能力、變被動支護為主動支護,從而保證隧洞圍巖的穩定和工程施工正常進行。
  10. As an important bearing structure, the middle wall in the multi arch tunnel, often dominates the success and safety of a project

    中隔墻作為連拱隧道的中樞結構和重要承載構件,其受力及位移情況往往對工程成敗和安全起著決定性作用。
  11. In addition, the paper introduces the seismic design of open top floor, the design of steel cover, the test of static bearing capacity of pile and the test of wind tunnel experiment

    此外,本文還介紹了空曠頂層的抗震設計:鋼結構屋蓋的結構設計;介紹了樁基靜載試驗和風洞試驗的概況及其試驗成果。
  12. Facing on karst groundwater in the process of yuanliangshan tunnel construction, we have collected the samples of the regional karst water and the pressure - bearing karst water, and have calculated d value with analyzing 6 d, 6 18o, t value

    針對圓梁山隧道施工建設過程中面臨的巖溶地下水問題,我們採集了區域巖溶水和巖溶承壓水的樣品,對水樣做了d 、 ~ ( 18 ) o和t值測定,並計算出d值。
分享友人