tunnel form construction 中文意思是什麼

tunnel form construction 解釋
隧道模施工
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • form : n 1 形態;形狀;樣子,外貌;【哲學】形式 (opp content)。2 人影,物影。3 格式;表格紙 (= 〈美...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山隧道位於渝懷線引入段重慶市沙坪壩區團結村至井口村之間,隧道穿越近南北向的觀音峽背斜,地貌上表現為脊、槽相間,觀音峽背斜由侏羅系新田溝組至三疊系下統碎屑巖和碳酸鹽巖組成,歌樂山頂大部分出露可溶巖地層,地表巖溶發育,有大量泉水和暗河出口,並修建有多個中小型水庫、大量池塘和水井。
  2. According to the comparison of many alternatives, the repair scheme of the releasing tunnel adopted the alternative of installing temporary sealing gate to form dry land construction conditions so that the repair scheme has been completed smoothly

    泄空洞修復工程,經多種方案比較,最終優選水下安裝臨時封水閘門,形成旱地施工條件,完成了檢修工程。
  3. The construction of the multiple - arch tunnel is deeply related to the form of center partition, the tunnel ' s section and excavation method etc. the change regularities of stress field caused by excavation are studied by 4 multiple - arch unlined tunnel model tests. the difference in lining for various multiple - arch sections is analyzed and the mechanics characteristics of center partition is discussed. then, a reasonable construction method for multiple - arch tunnel and a better section are put forward

    通過4個連拱模型試驗,研究了連拱毛洞開挖引起的應力場變化規律,對不同的連拱斷面的襯砌受力差異進行了深入的分析,同時對中隔墻的受力特點也作了探討,提出了合理的連拱隧道構築方法及優化斷面圖。
  4. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    本文採取理論分析與試驗比較相結合的方法,首先對黃河公伯峽水電站右岸導流洞改建為永久式內消能泄洪洞的四個較大設計方案進行了水力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了豎井旋流內消能的推薦方案與水平旋流內消能的推薦方案。
分享友人