tunnel height 中文意思是什麼

tunnel height 解釋
風洞高度
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • height : n 1 高,高度;身高;海拔。2 〈常 pl 〉高地,山丘。3 高貴,卓越。4 絕頂,頂點;【聖經】天。5 〈罕...
  1. A recommend value of appropriate roadbed height is put forward according to the sand dune type and the highway grade, make investigation to the sand harm and other problems of built highways in desert areas gathering the related materials of present day highways, and then make comprehensive and systematic statistics to related data and racious factors which affect the roadbed height ; analy the suitable roadbed height for the windblown sand drift passes through smoothly according to the open country windblown sand field test ; test and verify the outcome according to indoor wind tunnel test ; finally a appropriate recommend roadbed height value will be put forward for different grade highways in different areas, which is according to the analysis of roadbed stability the roadbed height economic analysis and different use requirement to different grade highways

    收集現有沙漠公路的有關資料,對全國已建沙漠公路進行沙害及其他病害調查,對相關數據和影響沙漠公路路基高度的各種因素進行綜合系統地統計分析;通過野外風沙流場測定,分析適宜風沙流順利通過的路基高度;通過室內風洞試驗進行驗證;結合路基穩定性分析、路基高度的經濟性分析,考慮不同等級公路的使用要求,最終提出不同地區不同等級沙漠公路路基填土高度的合理高度建議值。
  2. The research test of this discussion as follows : making investigation and research to overseas related materials ; make investigation to built highways in desert areas, dozens of routes and nearly 100 road sections have been surveyed, among them two highways have been taken as the chief investigation objects, they are " 210 national highways - first grade highways from bao tou to dong sheng " and " the section of nei meng a la shan meng s307 from shang de to meng gen " ; the relationship between windblown sand drift and the roadred height wind tunnel test ; make investigation to the tested road sections and subengineerings then make statistics and study according to the test outcome ; the stability analysis of different roadbed height ; the analysis of roadbed economy

    本課題的研究工作包括:對國外相關資料的調研分析;對已建沙漠地區公路進行調查、觀測了十余條線路,近百段路段,以『 210國道包頭至東勝一級公路』 、 『內蒙阿拉善盟s307尚德至孟根段』為主要調查對象;風沙流路基高度的關系、風洞試驗;對調查路段及依託工程調查、觀測結果統計研究;不同高度下路基穩定性分析;路基經濟性分析;按照沙丘類型及公路等級提出路基合理高度推薦值。
  3. The main purpose of this discussion is to det ermine the appropriate roadbed earthfill height according to the degree of sandburry, windblown sand drift test, wind tunnel test, windbed stability, road economy and traffic accident analysis. the appropriate roadbed earthfill height is one of vital factors in preventing highways from the harm of sand

    本課題研究的主要目的是沙漠公路在地理地貌、植被地質、沙源、風速強度等因素的影響下對公路形成的沙埋和風蝕危害,結合公路沙埋、風沙流實驗、風洞實驗、路基穩定性、道路經濟性、交通事故分析,確定路基的合理填土高度。
  4. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容重、側壓力系數、垂直荷載高度或埋深、圍巖的彈性抗力系數、支護結構的彈性模量、混凝土容重、結構的厚度以及混凝土的抗扭與抗壓強度等與襯砌結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪峰山隧道模注混凝土襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均值和方差,並計算出了相應的襯砌結構可靠指標。
  5. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  6. Force measurement in a low speed wind tunnel was conducted to investigate the effects of the height of a distant canard wing on the longitudinal aerodynamic characteristics of a forward - swept configuration

    摘要基於前掠翼鴨式前翼布局的風洞測力實驗,分析了距離主機翼較遠的鴨翼相對于主機翼的高度對布局縱向氣動性能的影響。
  7. The results show that in a rectangular tunnel with bigger dimension of the width, field strength of horizontal polarization mode is markedly higher than that of vertical polarization mode, influence of the height change on the field strength is stronger than that of the width change, and the difference of influences decreases with the increasing of frequency and transverse dimension

    結果表明:在寬度尺寸大於高度尺寸的矩形巷道中,水平極化模式的場強明顯高於垂直極化模式,高度尺寸的變化對場強的影響比寬度尺寸的變化要大,這種影響差異隨頻率的增高和截面尺寸的增大而變小。
  8. Considering the above reason, this paper, by the action - reaction model in the design theory of underground structure, and by fem, establishes an analysis frame based on the characteristics of the cavern - pile method. the influences of tunnel span, height, overburden depth, and excavation sequence on the cavern - pile method are discussed by a careful interpretation of the modeling result. in addition, a comparison of surface settlement and engineering quantity of the cavern - pile method with those of the binocular excavation method, bench cut method and cd method are made in the paper

    本研究主要是依據目前地下結構設計及計算理論中的地層結構法,以有限單元法為計算手段,針對淺埋暗挖洞樁法的自身特點確定了模擬分析方案,並通過計算結果的處理和分析指出了洞室跨度、高度、埋深、施工工序等因素對淺埋暗挖洞樁法的影響規律。
  9. 5 by using multi - window programming technology to combine vc + + with autocad, this thesis implemented comparison of plane, profile and across section, interactive design of profile, railway location by across section and setting location of bridge and tunnel. 6 this thesis expounded itself viewpoint on application model of profile optimization in scrlid, and has been used in system development. 7 by putting forward the summaries on the application model of professional design, this thesis established mathematics model of calculating terrain height of profile and across section, automatic setting location of the bridge and the tunnel

    2 、用面向對象的數據封裝和繼承技術實現了項目管理和方案數據的安全保護; 3 、選擇應用vc + + dao數據庫應用技術,完成了方案比選共用數據庫的開發; 4 、用autocadobjectarx定製實體技術,實現了線路平面拖放式交互設計; 5 、用vc + +與autocad相結合的多窗口編程技術,實現了平面、縱斷面、橫斷面三種圖形的對比顯示,實現了縱斷面交互設計、橫斷面定線和橋隧工程設置; 6 、就縱斷面優化在線路方案比選工作中的應用模式提出了自己的觀點,並在系統開發中得到應用; 7 、總結專業設計應用模式,建立了內插縱橫斷面地面高程、自動設橋、自動設隧數學模型。
分享友人