typical project 中文意思是什麼

typical project 解釋
樣板工程
  • typical : adj. 1. 代表的,典型的。2. 模範的,成為標本的。3. 特有的,獨特的。4. 象徵的。adv. -ly ,-ness, -ty n.
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. Hydraulic control system of double - cylinder vessel gate is a sort of typical electrohydraulic proportional control system0 in order to study electrohydraulic flux control characteristics of this system, i have analyzed the principle of this hydraulic control system, and made its mathematics model ? in double - cylinder hydraulic system, it is necessary to process electric synchronous control in this hydraulic system, this paper also introduces a sort of fnn ameliorated from the point of view of intelligent control theory, and clarifies the principle of applying that network to achieve synchronous controlo at the same time, the means of fuzzy configuration analysis is used for network training, the comparative experiments make known that the method of applying fnn to realize synchronization control is feasible, furthermore, its effect is better than others0 this paper puts forward that a distributed control system can be used to monitor and control vessel gate within a real - time or remote distance, the basic project, structure, applications and functions of computerized scada system in hydraulic system of vessel gate is introduced ? a double layer network structure, epigynous and hypogynous machine network, is applied to this system, in accord with the application of technique such as plc, integrated software etc, this paper introduces the methods and application to achieve the computerized scada system in the task, and analyzes the characteristic of this system, in this paper, the application of configuration in monitor and control system of vessel gate is discussedo in addition, in accord with the application of technique such as visual basicb

    雙缸船閘液壓啟閉控制系統要求解決同步控制問題,文中從智能控制理論角度出發,採用了一種改進的模糊神經網路,結合模糊聚類分析方法,闡述了應用該網路實現同步控制的原理。通過對比模擬實驗表明:應用模糊補經網路實現同步控制是可行的,而且它的同步控制效果要優于傳統的設置主從令缸控制方法,具有良好的魯棒性能。另外,本文提出了建立船閘控制系統的分散式控制系統,介紹了船閘液壓控制系統的計算機監控系統( scada )的方案、結構、應用和主要功能,採用雙層網路化結構:上位機網路和下位機網路,並結合plc通信網路技術和組態軟體等技術構成的計算機監控系統的實現方法,實際應用,分析了這種較新的系統模式在船閘液壓控制系統的計算機監控系統的功能實現中所具有的特點。
  2. Due to complex and varied geological conditions for 4 headrace tunnels at zipingpu project, real time monitoring technique was used during informatization construction according to new austrian tunneling method, system observation for typical sections was conducted by following in - situ construction, based on which inverse analysis for rock mechanics parameters was conducted

    針對紫坪鋪工程4條引水發電隧洞復雜多變的地質條件,採用新奧法隧洞信息化施工中倡導的實時動態監測技術,跟蹤現場施工進行了典型斷面的系統觀測,在此基礎上進行了圍巖宏觀力學參數的反分析研究。
  3. The other research purpose is to discover characteristic information and reliable methods of reflecting spinal cord damage. due to typical damage indicators, amplitude and latent period, have bugs such as limited information and weak stabilities, this project recommends applying time - frequency analysis to monitoring spinal cord function. through analysing and comparing typical signal with stft and cwt, it is proved indicators under time - frequency distribution can be better in reflecting signal changes, espcially the wavelet transformation

    針對目前ep監測中判定脊髓損傷的指標(波幅和潛伏期)存在信息量相對較小、穩定性較差的缺陷,本課題提出利用時頻分析技術對術中脊髓功能監護進行研究,通過短時傅立葉變換和小波變換分析和比較典型信號的時頻分佈,證明時頻特徵參數能更有效的提取信號的變化信息。
  4. This thesis takes a typical project - - the natatorium of the sports center, xuzhou normal university - - as a case to study the theory and practice of the design and the construction of the variant steel arched girder

    本文以典型的工程? ?徐州師范大學體育中心游泳館為實例,從理論和實踐上研究了變異鋼拱架結構的設計和施工。
  5. On the basis of the concept and analysis method of slope geological structure, four typical slope geological structures are selected by some investigations on more than one hundred high rock slopes in the motorway project. these structures are thick sandstone stratum, stratum including weak coal, stratum made of red or brown plastic clay and soft rock mass and stratum made of remnants rock mass. the practical slope geological structures are compact basis of geological mechanical model for the analysis of relaxation zone in high rock slope projects

    在介紹了坡體結構概念並提出建立坡體結構方法的基礎上,根據對京珠高速公路粵境北段路塹高邊坡工程中百余處巖石高邊坡的調查總結,選擇了其中較為具有代表意義的厚層砂巖、煤系地層、紅土地層及殘坡積層路塹高邊坡共4類巖石高邊坡作為研究對象,為對巖石高邊坡開挖鬆弛區的分析打下了堅實的實際地質力學模型基礎。
  6. The paper makes a social assessment of a typical public project - migration and anti - flood project in puling city by using analytic hierarchical and fuzzy synthetic process

    論文採用多層次模糊綜合評價分析法對涪陵城區移民遷建防護工程這一典型公共工程項目進行了社會評價分析。
  7. The study tours covered reginas shelter belt research institute, the indian head research center, community pastures, saskatoon irrigation diversity research center, the agriculture research center at saskatchewan university, the swift current research station, lethbridges irrigation demonstration farms and research center, the alberta research institute, the elerslie research farm, the lacombe research stations, the western beef group, transaltas coal mine land reclamation project and some typical farms and pastures

    參觀考察了位於里賈納的防護林研究中心印第安海德研究中心社區牧場薩斯卡通灌溉多樣化研究中心薩斯喀徹溫大學內的聯邦農業部農業研究中心斯威夫特卡倫特研究站萊斯布里奇的灌溉示範農場萊斯布里奇研究中心阿爾伯塔省研究院elerslie研究農場拉康姆豬研究站和西部肉牛小組transalta煤礦復墾項目以及一些典型的農牧場。
  8. Basing on the project management practice of hunan international convention and exhibition center, the thesis explains the concept of project management 、 the knowledge system structure 、 the management theory and technology measure, discourses the present development of convention and exhibition economy of the world, and the far - reacting significance of constructing hunan international convention and exhibition center, puts forward the basic thinking and practical measure of applying project management in the convention and exhibition project. according to the typical project management procedure, it applies the management theory and technology measure of different knowledge field to the research work of project management activity of hunan international convention and exhibition center

    論文以湖南國際會展中心工程項目管理實踐為基礎,闡述了項目管理概念、知識體系結構、管理理論與技術方法,論述了國內外會展經濟發展和建設湖南國際會展中心的深遠意義,探索了在項目中實施項目管理的基本思路和應用方法,並針對項目管理體系中典型項目管理過程,運用不同知識領域的管理理論和技術方法進行了湖南國際會展中心工程項目管理研究。
  9. The design of ride control system is a typical project of system integration, the contents of the first year ' s research include mathematical model, control law, computer software / hardware, man / machine interface, control circuit, hydraulic power system and transmission mechanism design, a prototype had also been built to verify the stability and performance of the system

    本計畫將以船舶運動控制系統商品化為目標,研究控制器軟硬體系統之簡化,提升控制器硬體系統訊號傳輸之品質及側向穩定翼之機構設計,最後並期對運動控制器軟硬體分項功能與整體機構功能作驗證。
  10. Cost savings on typical project

    典型項目的節約費用
  11. Estimating typical project and rework costs

    典型項目和返工費用的估計
  12. To provide true technology economy date of replacement ventitation and tradition mixture ventiliation, actual project design method and technology economy of replacement ventitation and tradition mixture ventilation have been analysed and contrasted based on typical project expmple

    為置換通風與傳統混合通風在技術經濟方面提供真實可信的技術數據,本文以某典型工程實例為依據,對置換通風和傳統混合通風在實際工程設計方法和技術經濟方面進行全面、細致的分析和對比。
  13. According to the prior achievements, based on pile deformation test data, it puts forward a method that combined the mindlin ' s solution with boussinesq ' s solution to calculate the superimposed stress of djm composite ground, and then uses the superimposed stress to calculate the settlement by layer - wise summation method. by a nonlinear elastic and viscoelastic fem model, based on in - site test data, the back - analysis method of the direct optimal multiple parameters are adopted to calculate the road embankment settlement of typical project

    在前人的基礎上,結合樁身應變測試結果,提出了聯合mindlin解和boussinesq解求解攪拌樁復合地基的附加應力的方法,根據計算出來的附加應力再用分層總和法計算攪拌樁復合地基的沉降;採用非線性和粘彈性有限元模型,根據現場實測資料,運用直接優化多參數反演分析方法,對典型工程實例進行了沉降計算對比分析。
  14. From beginning to the end, the paper uses the typical project " supply chain management system of multinational chain group china division " as the background that is penetrated into the design idea and framework of the paper

    文章自始至終以典型項目「跨國連鎖集團中國公司供應鏈管理系統」為背景,將論文提出的設計思想和框架貫穿其中。
  15. According to engineering practice for typical project in shanghai, introduces the concept, control principle, advantages and disadvantages of three - deck multi - zone air conditioning system, as well as some related problems in project, provides reference for the application of this kind of air conditioning system in future

    根據上海某工程的實踐,介紹了三路多分區空調系統的有關概念、控制原理、優缺點以及工程中應用中的有關問題,為該種形式空調系統的進一步應用提供參考。
  16. This is, in fact, a fairly typical project file

    這是一個相當典型的項目文件。
  17. The designers for a typical project are many different objects so it can be useful to list and store reference to these events from a common place

    典型項目的設計器是許多不同的對象,因此在一個公共位置列出並存儲對這些事件的引用將十分有用。
  18. The process of erp implementation is a typical project cycle, incorporating project start, project planning, project execution, project evaluation and project completion

    Erp實施過程是一個典型的項目循環,它包涵了項目的開始、項目計劃、項目執行、項目的評估及項目的完成。
  19. First, from basis principle of project finance, with a comparative analysis of six typical project finance a pattern, considering the optimum pattern is abs pattern

    首先闡述項目融資的基本理論,本文通過對六種典型的項目融資模式的比較分析,得出目前在我國基礎設施建設中應用項目融資的最佳模式是abs融資模式。
  20. In this article, a typical project financing case from the export - import bank of china was introduced. a thorough analyze about it was done in order to make the readers have a deep understanding

    在文中引用了一個選自中國進出口銀行的比較典型的項目融資案例,針對該案例內容進行了詳細的分析,以便讀者加深理解。
分享友人