under beam girder 中文意思是什麼

under beam girder 解釋
梁下總桁
  • under : adv 1 在下,從屬著,服從著。 bring under get under keep under 等〈參看各該動詞條〉。 The ship wen...
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  • girder : n. 【建築】縱梁,大樑,撐柱,撐桿,大型工字梁。 a framed girder構桁。adj. -less
  1. In chapter 5, by number value simulation calculation and experiment of one simple support beam, we will compare the magnitude of the coupling static and dynamic stress at each point on the girder under harmonic excitation, and so find conclusions such as : ( 1 ) there are so much correlations between structure damage and environmental effect and exterior excitation leads dominant effects in structure damage that we should consider static and dynamic stress together. ( 2 ) new intension design rules should be set up, according which the range of structure possible damage position should be estimated in advance

    得到以下結論: ( 1 )結構的破壞和環境的影響密不可分,外部激勵在結構破壞中發揮了重要的作用,應該將結構所受的靜力和動力一起考慮; ( 2 )應該建立新的強度設計準則,並以此作為依據,對已知結構的可能損傷位置有預先的范圍估計,從而為損傷識別的準確定位提供理論依據。
  2. Under beam girder

    梁下縱桁
  3. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅式雙導梁解決大跨度鋼箱混凝土結合梁橋的鋼箱梁架設技術難題,重點闡述了施工方案,龍門吊、導梁設計,工藝要點等。
  4. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜拉橋施工過程各狀態和成橋恆載狀態下,斜拉索索力、主梁線形、主梁關鍵截面應變、索塔塔頂水平偏位等關鍵項目的施工控制結果均滿足設計期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線形流暢,斜拉索、主梁和索塔三大體系的受力狀態合理,橋梁結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
分享友人