under-pier 中文意思是什麼

under-pier 解釋
碼頭下的
  • under : adv 1 在下,從屬著,服從著。 bring under get under keep under 等〈參看各該動詞條〉。 The ship wen...
  • pier : n. 1. 碼頭;防波堤。2. 橋腳,墩。3. 【建築】窗間壁,戶間壁,扶壁;柱,角柱。
  1. The kid ' s in a boathouse under the pier

    那個孩子在碼頭下面的船屋裡
  2. Under a row of five coiled spring housebells a curvilinear rope, stretched between two holdfasts athwart across the recess beside the chimney pier, from which hung four smallsized square handkerchiefs folded unattached consecutively in adjacent rectangles and one pair of ladies grey hose with lisle suspendertops and feet in their habitual position clamped by three erect wooden pegs two at their outer extremities and the third at their point of junction

    那是一排五個家用螺形彈簧按鈴,下面,在煙囪那凹進去的間壁兩側的兩個鉤子之間,彎彎地橫系著一根繩子,上面掛著四塊對折的小方手絹:一塊挨著一塊,彼此並不重疊,呈長方形。另外還有一雙灰色長統女襪,襪幫是用萊爾棉線25織的,腳脖子以下是通常的樣式。
  3. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  4. Please clarify if the above ifp requirement is still maintained. please also clarify if proponents should not propose any pier structure outside the scheme area requiring reclamation and gazetting under the foreshore and seabed ( reclamations ) ordinance

    請澄清載于發展建議邀請書的上述規定是否維持不變,以及建議者是否不應建議把碼頭構築物建於計劃區之外而須根據《前濱及海床(填海工程)條例》進行填海及刊登憲報。
  5. Based on the study of the engineering geological conditions, using fem method to calculate the baseground stress distribution of bridge pier and analysis the stability of slope under different conditions, such as, reset condition, under the bridge load and affected by the changing reservoir water level

    在對橋址區工程地質條件研究的基礎上,採用有限元法方法計算了橋荷載施加前後及水庫水位變動情況下橋址區斜坡應力分佈特徵,並對斜坡穩定性進行了分析。
  6. In combination with the work of < the design and technical construction rules of flexible dolphin pier in port engineering > of designing institute of water transport of transport, the data of some typical experiments of domestic and international pile foundation were analysed emphatically. through comparion of the relation of p - y curves between single pile and pile group under lateral loading and lateral reciprocating loading, the experience formula of p - y curve of single pile under reciprocating loading role is put forward

    本文結合中交水運規劃設計院《港口工程柔性靠船墩設計與施工技術規程》的編制工作,著重分析了國內外幾組典型的試樁資料,通過對比水平靜載單樁、群樁和往復荷載單樁p ? y曲線的關系,提出了往復荷載作用下的單樁p ? y曲線的經驗公式。
  7. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  8. The seismic responses of the pier with shallow foundation on the sites are studied using ansys software, and the computing results with or without the frozen layer under two boundaries are analyzed and compared

    摘要利用ansys軟體,對類場地上的挖井基礎橋墩在兩種邊界條件下的凍土和融土的地震反應進行了計算,並對結果進行了分析和比較。
  9. The results indicate that the seismic responses of pier under the viscous - spring boundary are less than that under the fixed boundary, and the seismic responses of pier on the site with the frozen layer are much less than that without the frozen layer

    結果表明類場地上的挖井基礎橋墩,來用粘彈性邊界時的橋墩地震反應比固定邊界時的地震反應小;凍土時的地震反應比融土時的地震反應明顯減小。
  10. There is only one queen s pier, how come there are two reprovisioned piers for public landing steps under criii in future

    中區只有一個皇后碼頭,為何將來會有兩個重置的公眾登岸碼頭?
  11. According to features of diffcult anti - washing construction of pier foundation under compley hydroraphic, gological, and water potential conditions, combining construction condition methods, author analyze and conclude key points and difficulties of anti - washing construction of the fourth main pier of great sutong bridge, and difficulties in construction and relevant countermeasures

    摘要針對在復雜的水文、地質、河勢條件下進行橋墩基礎沖刷防護施工難度大的特點,結合施工工藝和方法,對蘇通大橋主橋4號主塔墩沖刷防護施工中的重點難點、施工中出現的不利隋況及應對措施進行了分析研究。
  12. In this thesis a numerical model to solve the planear 2 - d depth - integrated flow ( dif ) has been established with irregular body - fitted mesh finite volume method and explicit maccormack predictor - corrector method and applied to the study of damming caused by a bridge pier under 14 working conditions varied with the combination of different pier shape. flow rate and contraction ratio

    本論文採用非規則貼體網格有限體積法和顯式maccormack預測-校正法求解平面二維水深積分方程,對明渠水流運動的數值模擬方法進行了研究,並且應用該數值模型計算了14種不同的橋墩體型、來流、收縮比的組合工況下的橋墩壅水問題。
  13. " works currently under way at a section of edinburgh place between queen s pier and star ferry pier are being undertaken by a commercial organisation for maintenance of its pump house in the area, " he added

    他補充說:現時在愛丁堡廣場介乎皇后碼頭及天星碼頭之間所進行的工程是由一間商業機構為該區泵房進行的保養工作。
  14. After changing the ratio of spans and the thickness of the walls of the double thin - wall pier, parameter analysis is processed under dead load and annual temperature change and sunshine temperature differential

    然後,通過改變跨徑比與墩梁剛度比設計基本參數,進行結構在自重荷載、年溫度變化和日照溫差三種荷載工況下的受力分析。
  15. For three - short - pier shear wall under vertical loads, the results remain the same, and transfer beam at this moment will work with the middle pier, constituting a t - shape beam to sustain the moment and axial tensions together. 4. under the horizontal loads, the inner stress distribution in the frame supported short - pier shear wall shows similarities with that of the short - pier shear wall underneath the fastened supports

    4 、水平荷載作用下,框支短肢剪力墻墻肢內的應力分佈形式接近於下部固支的短肢剪力墻的應力分佈;轉換梁承受上部墻肢傳遞的拉力、剪力和彎矩,當短肢剪力墻墻肢數量較多時,轉換樑上、下邊緣拉、壓應力交替出現,剪應力的最大值處于洞口下方的轉換梁體內。
  16. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  17. Abstract : an experimental investigation of local scour around a new type bridge pier under a clear water regime is presented. the main characteristic feature of flow is relatively large horseshoe vortex flow along the circumference of the pier. and the procession of scour is discussed in this paper. equation for predicting the depth and area of local scour hole is presented. it is significant for evaluating the potential for scour around this type pier

    文摘:介紹了一種新型橋墩即多腹薄壁墩的局部沖刷試驗成果.認為橋墩周圍的水流以繞流橋墩的相對較強的馬蹄型漩渦系為主要特徵.並討論了沖刷過程,給出了預測沖坑深度及大小的關系式,可供估算同類型橋墩的沖刷參考
  18. According to construction features of three - span prestressed concrete and continuous rigid frame box with v pier bridge, the paper demonstrates the shell finite element theories, c onstruct the spatial model, and researches its spatial stress and variable regularity under different loads including uniform load, concentrated load and prestressing force wire. morever, the paper studies vibratory modal of three - span prestressed concrete and continuous rigid frame box with v pier bridge, and sets about experimental investigation of the corresponding practical bridge

    本文根據典型的三跨預應力混凝土墩連續剛構橋的特點,提出採用板殼有限元法計算理論,建立其空間分析模型,研究該橋在不同荷載(均布恆載、集中活載、預應力束)支承條件下的空間受力特性和變化規律:探討了典型三跨預應力混凝土墩連續剛構橋的空間靜動力特性及相應的振動模態;探索一般的平面理論預測值與實際空間效應的差異,並進行相應的試驗研究。
  19. The draft outline zoning plan no. sh245, incorporating amendment to include pier 7 and its adjoining area for the reprovisioning of the star ferry piers and other amendments, was exhibited for public inspection under section 7 of the town planning ordinance

    城市規劃委員會根據《城市規劃條例》第7條,展示分區計劃大綱草圖編號sh245 ,以供公眾查閱。圖則收納的修訂,包括把7號碼頭及毗鄰土地納入規劃區內作為重置天星碼頭的地點和其他修訂。
  20. Main conclusions as below : 1. the results demonstrate that the influence on the pier stress induced by transfer beam is confined in the upper layer of the transfer beam under vertical loads

    主要得出以下結論: 1 、在豎向荷載作用下,轉換梁對墻肢應力的影響僅限於轉換樑上一層的范圍內。
分享友人