up slope time 中文意思是什麼

up slope time 解釋
上升時間
  • up : adv (superl uppermost )1 向[在]上,向[在]上面;向[在]被認為處于上方的地方或方面〈如河流的源頭,...
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  1. Combining with the research task researching on the deformation and stability of deep excavated cuts and high filled embankment of the traffic department in fujian province, based on the residual soil slope project on the project site at k15 + 183 of yong - zhang highway ( yong ' an section ), adopting non - linear theory, modern monitoring technology and numerical simulation technology, the deformation and stability of cutting cliff debris and residual soil slopes have been studied systemically and synthetically in the thesis. at the same time theory analysis, the analysis and estimate of field monitoring are taken into account in this course. main research work and working achievement are summed up as follows : ( 1 ) with the acquaintance of the trends and development about the deformation and stability of slopes at home and abroad, slopes are classified and summarized systemically

    並通過k15 + 183工點路塹土質邊坡的各類位移變形的監測成果驗證了該程序的正確性及適用性; ( 5 )通過應用大型有限元軟體ansys模擬分析,不僅分析了其隨著開挖時間步的應力應變關系,並模擬了與實際測斜管相匹配的測斜路徑,通過對各開挖時間步的模擬計算分析,得到了與實測數據較符合的結果; ( 6 )綜合監測分析成果和極限平衡理論計算分析成果,對k15 + 183工點路塹邊坡的原設計坡率和幾何形態進行了優化計算分析,取得了較為滿意的結果。
  2. On the basis of displacement - time series of the slope, a nonlinear dynamic model is set up according to backus generalized linear inversion theory in this paper. due to the equivalence beween autonomous gradient system and catastrophe model, a standard cusp catastrophe model can be obtained through variable substitution. the method is used in analysis of displacement data of huangci landslide and wolongsi landslide and in understanding how slopes evolve before sliding. the result shows that the nonlinear dynamic model can make satisfactory prediction result. is it most important that there is a sudden fall of d, which indicates the occurrence of catastrophe ( when d = 0 )

    研究表明,滑坡變形失穩過程具有混沌和分維特性,可以用分形理論來研究滑坡預測問題,基於對任一連續函數,至少在較小的鄰域內可以用多項式任意逼近的數學理論,運用改進的backus廣義線性反演理論,以斜坡位移時間序列為基礎,反演了斜坡演化的非線性動力學模型。並利用自治梯度系統與突變模型的等價性,通過變量代換得到標準的尖點突變模型。
  3. She found clifford slowly mounting to the spring, which was halfway up the slope of the dark larch - wood. he was there by the time she caught him up

    她看見克利福正慢慢地上著坡,向半山上落葉松林中的泉源處走去,當她趕上他時,他已經到了。
  4. The effect of blast quake, the rule of slope failure and the controlling technique were made up as a whole in this paper to research. the main research foucs on : first, investigation of in site engineering geology and hydrological geology ; second, blast design and in site measurement : on the basis of the first stage work, considering special rock condition, blast design, blast test and measurement in site were made in the same time. the propagation rule of blast wave in the process of rock excavation, blast quake space and the effect of blast on rock slope were studyed

    本論文將開挖爆破震動效應和邊坡巖體火穩破壞規律及其控制技術作為一個整體進行研究,主要研究內容包括:現場工程地質水文地質調查研究;爆破方案設計和現場測試:在現場工程地質水文地質調查研究基礎上,結合特定條件下的巖石條件進行爆破方案設計,同時進行現場爆破試驗和監測,研究路塹開挖過程中爆破產生的地震波傳播規律、爆破振動場及爆破對巖質邊坡的影響。
  5. Allocate the principle of the basis of the cubic metre of earth and stone, combine the characteristics of limestone geology of mountain area and ecological environment, we set up the mathematical model of the linear programming, which is suitable for limestone mountain area large system cubic metre of earth and stone of expressway, meanwhile we put forward systematic thinking of treatment and method through the remaining cubic metre of earth and stone after allocating, at the same time, we give the protective measure on abandon soil field and fetch earth field about environmental ; making the discussion on medical treatment of natural river system and underground river system of the slope recover

    根據土石方調配原則,結合石灰巖山區地質和生態環境的特點,建立了適合於石灰巖山區高速公路的大系統土石方調配線性規劃數學模型,同時對通過調配后剩餘的土石方提出了系統的處理思路和方法,並對棄土場提出了系統的環境保護措施;對各種排水設施的設置與自然水系的調治恢復相結合做了初步探討。第三,路塹邊坡環境恢復。邊坡景觀是公路景觀的重要組成部分,是高速公路環境保護研究的主要內容。
  6. You have walked for about 200 steps and 200 m gentle up - slope path. note the time again

    你已向上走了200級梯級及200米緩斜道路,所需時間是多少呢?
分享友人