upper bridge 中文意思是什麼

upper bridge 解釋
上層駕駛臺
  • upper : adj 1 (更)上面的,上方的,上部的;較高的;上級的;(議會)上院的;(衣服)穿在外面的。2 上流的...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  2. The vibration of upper structure of bridge which caused by the dynamic action of vehicle pass the railway bridge may make the structural component fatigue and decrease the intensity and stability. the more vibration of bridge will influence the safety and stability of vehicles ; when the dynamic changing frequency of vehicle equal or approach to the free vibrational frequency of bridge, wh ich will make the resonance may intensify the response of bridge and vehicles

    列車動力作用引起橋樑上部結構的振動可能使結構構件產生疲勞,降低其強度和穩定性;橋梁振動過大可能會對橋上車輛的運行安全和穩定性產生影響;當列車的動力變化頻率與橋跨結構自振頻率相等或接近時,引起的共振可能會使車橋動力響應加劇。
  3. Rc - masonry combination arch bridge makes rc arch ribs as former spanning structure and falsework of upper masonry ' s construction. finally, reinforced concrete and masonry together form arch ring

    它提出了以rc拱肋作為先期的跨越結構和後期高強石砌體砌築的施工支架,最終由石砌體和rc拱肋共同形成主拱圈的構思。
  4. The upper level is for cars and has a width of 22. 5 meters ; the lower level is railroad and has a width of 18 meter. the length of the bridge is 1670 meter ( 1 mile )

    5米;下層為雙線鐵路,寬18米;全長1670米,正橋長156米,有兩臺8墩9米,每孔跨度128米。
  5. The upper level is for cars and has a width of 22. 5 meters ; the lower level is railroad and has a width of 18 meter. the length of the bridge is 1670 meter 1 mile

    長江大橋上層是公路,寬為22 . 5米下層為雙線鐵路,寬18米全長1670米,正橋長156米,有兩臺8墩9米,每孔跨度128米。
  6. Neither the upper bend of the don, nor the crucial land bridge, had been secured.

    上游的頓河河曲和關系重大的陸口橋梁此時都未到手。
  7. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    文摘:涪江潼南河段防洪整治是一項以防洪為主體的綜合性河岸整治工程,在平面二維數值模擬計算的基礎上再進行河工模型試驗,比較分析各防洪整治方案下潼南河段水流條件的變化,及其對上游防洪、河道、大橋、電站、航運、河勢的影響,提出合理可行的工程方案
  8. The conclusion of reappearing analysis is that crane bridge be used as usual because main weld maximum stress of upper cover plate of main beam lower than yield limit though it higher than permissible stress. inner stress of secondary beam was over ultimate strength, and deforming is ultra big. so it was unfit for produce and secondary beam must be changed

    再現分析得出的主要結論為:橋架的主樑上蓋板主焊縫的最大應力超過了許用應力,但小於屈服極限,可以繼續投入使用;副梁內部的應力遠遠超過了強度極限,變形特別嚴重,不能滿足生產要求,因此更換新的副梁;端梁內部的應力超過了屈服極限,小於強度極限,在應力較大的位置焊接補強板;投入使用后,要對整個橋架進行定期檢查。
  9. Shuan - xin residential building invested by rebar group is located at the head of the chung ho xiu - lang bridge. the building is 34 stories high upper ground and 5 stories underground with a total construction area of 70, 233. 71 m2

    力霸集團投資興建之雙星住宅大廈,位於中和秀朗橋頭,望山面水,視野壯闊,該大廈地下五層,地上三十四層,總建築面積70 , 233
  10. Shuan - xin residential building invested by rebar group is located at the head of the chung ho xiu - lang bridge. the building is 34 stories high upper ground and 5 stories underground with a total construction area of 70, 233. 71 m2. it has a total of 5 buildings with 642 households

    力霸集團投資興建之雙星住宅大廈,位於中和秀朗橋頭,望山面水,視野壯闊,該大廈地下五層,地上三十四層,總建築面積70 , 233 . 71 ,共5棟642戶。
  11. The cancellation of web bending reinforcement and continuous bar in upper structure of continuous rigid frame bridge is discussed with mechanics method. 4

    並對連續剛構橋上部結構設計中取消腹板彎起索、下彎索和連續束問題進行了探討,從力學角度進行了分析研究。
  12. On newcomen bridge the very reverend john conmee s. j. of saint francis xavier s church, upper gardiner street, stepped on to an outward bound tram

    來到紐科門橋上,上加德納街聖方濟各沙勿略教堂的這位十分可敬的耶穌會會長約翰康米跨上一輛駛往郊外的電車。
  13. Taking into account the height of the rooms, it was decided to divide the upper space into two mezzanine floors joined together by two bridge - corridors

    根據房間的高度,決定將上部空間分割出來作為隔層,由兩根橋廊連接。
  14. The design realm in the province of jilin, use more software is the bridge doctor system, bridge master, system of asbest, procedure of qjx and province highway of jilins survey to design the hospital to by oneself develop of the t beam plank beam painting procedure, the cover beam calculation painting procedure, a pillar calculation procedure, the upper part procedure compute a procedure mostly, even some procedures can paint, but the province painting of basic and dissatisfied foot jilin of born diagram paper style, the diagram paper the modification quantity compare greatly, the procedure that the lower part procedure adopts to by oneself

    在吉林省內設計領域,使用較多的軟體是橋梁博士系統、橋梁大師、 asbest系統、 qjx程序及吉林省公路勘測設計院自行研發的t梁板梁繪圖程序,蓋梁計算繪圖程序,樁柱計算程序,上部程序多是計算型程序,即使有些程序能夠繪圖,但生成圖紙基本不滿足吉林省繪圖風格,圖紙修改量較大,下部程序多採用自行編制的程序,但大多數程序是dos系統的程序,使用不方便,同時與現行規范多有不符。
  15. We will also pass by the vancouver trade convention centre, through the 1, 000 acres stanley park, lions gate bridge, to the upper class residential area of british properties of the north shore, tour salmon hatchery and the famous capilano suspension bridge where you can experience the thrill of crossing a suspension bridge at a height of 200 feet above the capilano canyon

    繼往溫哥華市內著名的伊利沙伯女皇公園,此公園於市內小山區,居高臨下,景色可一覽無遺。再到溫哥華市的歷史發源地煤氣鎮,然後途經建築突出有五帆標志之卑詩省會議中心,再進入佔地一千英畝之士丹利公園,觀賞園內印第安人之圖騰柱。夜宿溫哥華。
  16. The upper structure installation technology of jiangyin yangtze river bridge

    江陰長江大橋上部結構安裝施工技術
  17. Through supported steel pipe concrete tied arch bridge upper structure construction technology

    下承式鋼管混凝土系桿拱橋上部結構施工技術
  18. Automobile turn on upper yalu river enter at square one sides, everybody extend neck watch these mysterious country one after another by bridge

    汽車開上鴨綠江大橋進入朝方一側時,大家紛紛伸長脖子觀看這個神秘的國家。
分享友人