variable water level method 中文意思是什麼

variable water level method 解釋
變水頭法
  • variable : adj 1 易變的,變化無常的,無定的 (opp constant steady)。2 可變的,能變的;變換的。3 【數學】變...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • level : n 1 水平儀,水準儀;水準測量。2 水平線,水平面;水平狀態;平面,平地。3 水平,水準;水位;標準;...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河水位的水沙因素,及僅用水沙因素有效研究水位的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應水位過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據高精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中高及中低含沙類洪水相應水位過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛期上下游相應洪水位過程的擬合誤差都較小;最後,明確黃河下游含沙量對水位的主要影響方式,即含沙量主要是與其它因素聯合對水位作用;另外分析了要實現變動河床洪水位過程準確預報的困難所在及改進方向。
  2. This paper evaluates the underground water resources and its safe levels of miming, and then studies the availability of molepipe drainage, a kind of practical underground water regulation technique. starting with the elevation of underground water resources and a safe level of mining through variable system theory, this paper analyzes the conditions of underground water resources based on the well - studied determination method of determining the two hydrographical coefficients : rainfall infiltration replenishment rate and irrigation replenishment rate. then considering irrigation, rainfall, drainage and other related factors, a mathematical model is set up for the calculation of underground water storage, exploitation on water regulation

    論文從灌區的地下水資源及其可開采量評價分析方面入手,在對兩個主要的水文地質參數即降雨入滲補給系數、灌溉入滲補給系數確定方法研究的基礎上,對灌區的地下水資源狀況進行分析,依據灌區的灌溉、降雨、排水條件及各種現狀因素,建立了地下水資源量計算的數學模型,西安理工大學工程碩士專業學位論文計算得到青銅峽灌區地下水的最大補給量和可開采量;另外對在開發利用地下水資源過程中的地下水位的調控進行了初步的探討,在銀北灌區開展對暗管排水調控地下水位的試驗研究。
  3. Based on the water supply risk and its variable process of dalian city, this paper proposes a cost - benefit analysis method for flood resources to inquire into the control range of the reservoir ' s flood limit water level, according to the use course of the flood resources and flood range analysis

    摘要以大連市碧流河水庫為例,根據大連市供用水系統的風險及其變化過程,分析超蓄洪水資源的利用情況及其效益,並在對抬高水庫汛限水位造成的淹沒損失分析的基礎上,利用邊際成本分析方法確定控制的范圍。
分享友人