wall line 中文意思是什麼

wall line 解釋
墻皮線
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  1. Hiht manganese steel casting is a traditional product line in our factory, the main products are jaw plate, back block, plate hammer, dipper teeth, hammer, crushing wall screen mesh, elbows in concrete pumping track, etc

    高錳鋼鑄件是我廠的傳統產品,產品主要有顎板、襯板、板錘、斗齒、錘頭、破碎壁、篩網板、混泥土泵車中的彎管等。
  2. Thus he showed me, and behold, the lord was standing by a vertical wall with a plumb line in his hand

    摩7 : 7他又指示我一件事有一道墻是按準繩建築的、主手拿準繩站在其上。
  3. Thus he showed me, and there the lord was, standing upon a perfectly plumbed wall ; and in his hand was a plumb line

    7 ?又指給我看:主站在一道按準繩築好的墻上, ?手中拿著準繩。
  4. This is what he showed me : the lord was standing by a wall that had been built true to plumb, with a plumb line in his hand

    7他又指示我一件事有一道墻是按準繩建築的、主手拿準繩站在其上。
  5. The steel construction is made up of roof beam, post, purlin, roofing and wall, adopt the automatic production line to weld and take shape in the factory, construction site spend high - strength bolted joint reduce weld work load, make progress and quality receive the complete assurance

    鋼結構由梁、柱、檁條、屋面和墻體組成,工廠內採用自動化生產線焊接成形,施工現場用高強螺栓連接,減少了焊接工作量,使進度和質量得到完全保證。
  6. The west wall ( or the siegfried line as the allies called it ) played a crucial role in the bitter fighting of 1944 and 1945 in north - west europe

    納粹德國的西部防線(盟軍稱之為「齊格弗里德防線」 )在1944年和1945年西北歐洲的殘酷戰斗中起了至關重要的作用。
  7. They sat together in a window whose lattice lay back against the wall, and displayed, beyond the garden trees and the wild green park, the valley of gimmerton, with a long line of mist winding nearly to its top for very soon after you pass the chapel, as you may have noticed, the sough that runs from the marshes joins a beck which follows the bend of the glen

    他們一起坐在窗前,格子窗拉開,抵在墻上,望出去,除了花園的樹木與天然的綠色園林之外,還可以看見吉默吞山谷,有一長條白霧簡直都快環繞到山頂上因為你過了教堂不久,也許會注意到,從曠野里吹來的燃燃微風,正吹動著一條彎彎曲曲順著狹谷流去的小溪。
  8. The stags line up against the wall, chat cursorily with one another.

    光棍來賓都一字靠在墻上,有口無心地聊著天兒。
  9. Pipe production line : double wall metal reinforced spiral corrugated pipe production line double wall corrugated pipe, steel plastic composite pipe and pe pipe and hdpe spiral pipe production line

    管道類? ?鋼骨架增強纏繞波紋管、大口徑雙壁波紋管、鋼塑復合管以及實壁或結構壁聚乙烯管成套生產設備。
  10. The houston rapper paul wall, who describes his 25, 000 14, 000 oral bling as a disco ball, has teamed up with a texan jeweller to launch a line of custom - made mouthpieces

    而另一為饒舌歌手保羅口中的珠寶牙套也價值2500萬英鎊,他還戲稱自己是「將disco球含在口中」 。
  11. The houston rapper paul wall, who describes his 25, 000 14, 000 oral bling as " a disco ball ", has teamed up with a texan jeweller to launch a line of custom - made mouthpieces

    而另一為饒舌歌手保羅口中的珠寶牙套也價值2500萬英鎊,他還戲稱自己是「將disco球含在口中」 。
  12. Avoiding the difficulties of detecting the difficult parameters in furnace control and of building up the models, integrated with fuzzy control and conventional pid control, abb ’ s control it system is used to predict the bloom surface and center temperature directly based on the temperature of furnace wall easily to be detected so that the temperature settings in various furnace sections can be self - corrected, the furnace temperature of each section self - adjusted and on - line parameters of combustion control self - optimized. in addition, the heating parameters and the operating status of the field plant can be monitored with alarm

    採用abb公司的controlit控制系統,避開爐子控制中遇到的困難參數檢測及建模困難等因素,直接根據容易檢測的爐壁溫度來推知鋼坯表面溫度及鋼坯中心溫度,將模糊控制技術與常規pid控制相結合,實現各段溫爐設定值自修正、各段爐溫自協調、各參數在線自整定的自尋優最佳燃燒控制;對熱工參數、現場設備的運行情況進行監視、報警,實現爐膛壓力、管道壓力、換熱器的保護控制,並將重要參數送往廠級mis網路。
  13. Through improvement of construction technology of chamfer of zaohe river third - line lock ' s chamber wall, the inclined surface concrete quality has been well controlled

    通過對皂河三線船閘閘室墻倒角施工工藝的改進,斜面砼表面質量得到了較好的控制。
  14. All the results can be utilized by engineers, during the designing and construction. the main conclusions are listed as follows : ( 1 ) based on the shortest line between weak interbed and limit of excavation and the location of point of intersection between limit of excavation, classification of weak interbed distribution is set up, and the distance of distribution is defined ; ( 2 ) according to the strength and deformation equivalent principle, influence zone of weak interbed is introduced, and a new method to simulating the weak interbed with thickness is built ; ( 3 ) some quantificational results on influence of weak interbed respectively at crown, right shoulder and right wall are summarized ; ( 4 ) some quantificational results on influence of weak interbed with the distance between weak interbed and limit of excavation 0. 2d, 0. 5d, l. od are gained ; ( 5 ) some quantificational results on influence of weak interbed in the rock mass with confining coefficient 0. 38, 1. 0, 1. 5, 2. 0, 3. 0 are summed up ; ( 6 ) some quantificational results are summarized on influence of the underground surrounding rock mass stability with weak interbed, in the representational surrounding rock mass graded ii, iii, iv ; ( 7 ) according to the studying results some advices are suggested on designing of underground engineering

    主要結論如下: ( 1 )以軟弱夾層到開挖輪廓線最短距離和最短距離線與開挖輪廓線的交點位置為指標對軟弱夾層的分佈部進行了分類,並確定了軟弱夾層分佈距離; ( 2 )根據強度等效和變形等效的原則,引入了軟弱夾層影響帶的概念,建立了模擬軟弱夾層厚度的一種新方法; ( 3 )總結出了軟弱夾層分佈在拱頂、右拱肩、右邊墻時對地下洞室穩定性影響的量化指標; ( 4 )分析出了軟弱夾層距開挖輪廓線0 . 2d 、 0 . 5d 、 1 . 0d三種情況對地下洞室穩定性影響的量化指標; ( 5 )總結出了在不同的側壓力系數( 0 . 38 、 1 . 0 、 1 . 5 、 2 . 0 、 3 . 0 )地應力場中軟弱夾層對穩定性影響的量化指標; ( 6 )得出了在、 、代表性圍巖中軟弱夾層對穩定性影響量化結果; ( 7 )根據數值試驗成果提出了在有軟弱夾層圍巖中地下洞室設計原則的幾點新內容。
  15. The contacting measurement method with a double probe is put forward after the detailed analysis of the state - of - the - art measuring methods of the thickness of wall. firstly, the theory - profile generatrix is built, and then the movement curve of the track of joint center is constructed, which aims at making the joint center move along the movement curve and keep the fixed sensor touching the wall. the measuring sensor examines the line in its normal direction of the interior wall all the time, the data from the sensor is the thickness value of the wall

    論文通過分析國內外變曲率回轉體壁厚測量的現狀,提出了雙測頭接觸式測量方案:通過構造理論輪廓母線,建立鉸鏈中心的運動曲線,使鉸鏈中心始終沿運動曲線運動,以保證固定觸頭與傳感器測頭的連線始終在內壁法線方向上,從而傳感器測頭所得的數值即為壁厚值,該方案經模擬測試實驗取得了預期效果。
  16. S uttered blasphemies that made his jailer recoil with horror, dashed himself furiously against the walls of his prison, wreaked his anger upon everything, and chiefly upon himself, so that the least thing, - a grain of sand, a straw, or a breath of air that annoyed him, led to paroxysms of fury. then the letter that villefort had showed to him recurred to his mind, and every line gleamed forth in fiery letters on the wall like the mene tekel upharsin of belshazzar

    他把憤怒轉嫁到他周圍的一切上,他泄怒於自己,泄怒於那來惹他的最微不足道的東西,如一粒沙子,一根草,或一點氣息,維爾福給他看的那封告密信在他的腦海里重新浮現出來,一行似乎是用火紅的字母寫在墻上一般。
  17. In the central of confucius temple is dachen hall. from screen wall to weishan, the south and north, are in a line. the left and right architectures are in symmetry. the whole area is about 23, 600 square meters. near the south bank of qinhuai river is

    ?中心,從照壁至衛山,南北成一條中軸線,左右建築對稱排列,佔地面積約
  18. Line against the wall

    靠墻站成一排
  19. Our company makes full of the aluminum resources and plastics resources in wuxi city, probably specializes in producting many kinds of portable unfurl and display equipments of their own superiorities, mainly as follows : roll up stand screen series ; x rack banner stand series ; l banner stand series ; pop - up display series ; promotion stand series ; wall picture shelf series ; triple banner series ; special assembly series of metal truss of products ; folded panel etc. the equipments are well known with best quality, elegant and natural drawing line, light weight, easy to carry and set up and your ideal tools to display your image perfectly in all kinds of fairs

    公司生產便攜式展覽展示器材,主營產品的系列有:易拉寶x展架l展架促銷臺拉網展架金屬焊管桁架旅遊桌椅帳篷等產品,並擁有自己的專利產品品牌-華東展示牌。公司擁有一批專業設計師及管理團隊,構思設計出一批批新型款式的便攜式展示器材和廣告器材,為企業節省人力物力的同時,更節省了企業的資金,使其便攜展示器材成為市場的新寵和挑戰者。
  20. 7, 0. 9cm to 1. 5cm place to the wall start to nail the first floor, that 0. 9cm to 1. 5cm the expansion and contraction crevice can be covered up with gangway and the angle line after the floor finished

    7距離墻邊0 . 9至1 . 5處開始面釘第一片地板,此0 . 9至1 . 5的伸縮空隙于地板完工後可用跳腳板或角線遮掩。
分享友人