  1. In order to guarantee the normal operation of hydroelectric generator unit, it is necessary to make a thorough test of the performance and characteristics of a governor before it is installed or after it is overhauled. to facilitate the test of the governor, a real - time dynamic simulator based on pcc for water turbine governing system was developed. it has three functions : simulating controlled objects ( pressure water conveying system, water turbine, generator and electric grid ), simulating governor " s electro - hydraulic servo system and working as a real - time measuring system for governor

    水輪機調速器是水輪發電機組一個很重要的自動化調節設備,它由調節器和電液隨動系統組成,在調速器安裝或者大修后都要對其性能和特性進行全面測試,為了方便對水輪機調速器的測試,特開發水力機組調速系統實時動態模擬儀,該模擬儀具有三種功能:對調速器調節對象(有壓引水系統、水輪機、發電機和電網)進行模擬、對調速器電液隨動系統與調節對象進行模擬和作為實時測試系統監測調速器的工作是否正常。
  2. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  3. Achievements and analysis of pump model unit test for the pump station in the east line of the project of south - to - north water transfers

    南水北調東線已招標泵站水泵模型裝置試驗成果及分析
  4. The development of the dynamic test - bed for fluid flow machine, one of the sub - projects within the " national 211 project ", can carry out the tests on the static and dynamic properties of not only both the hydraulic turbine units and water pump flits with the types of axial - flow, mixed - flow and inclined - flow, but also the centrifugal pump unit ; of which the testing process is automatically controlled by a pc with higher testing precision

    摘要流體機械動態試驗臺是國家「 211工程」建設項目之一,可以進行軸流式(貫流式) 、混流式、斜流式水輪機組的靜特性、動特性試驗,也可以進行軸流式(貫流式) 、混流式、斜流式、離心式水泵機組的靜特性、動特性試驗,試驗過程由微型計算機自動控制,試驗精度高,操作方便、靈活。
  5. Abstract : anchor packer is one of the important downhole tools which areused in oil production and waterflood technical operation, such as layer waterflood, layer fracture or acidation, mechanical water block. after anchor is fixed in the simulated test unit, the invasion depth of the casing can be known with the help of the sensor around the casing wall, and then the failure degree is concluded. this is very important for the anchor packer design and site operation

    文摘:在油田開發中封隔器是實施機械採油、分層注水、分層壓裂或酸化、機械卡堵水等注采工藝作業的主要井下工具之一,封隔器上的卡瓦是保證工作可靠性的重要元件,把卡瓦安裝在模擬試驗裝置中,通過在套管壁周圍分佈位移傳感器,測得卡瓦錨定后切入套管壁深度,判斷卡瓦對套管的損傷程度,這對封隔器的設計和現場使用具有十分重要的意義。
  6. Packaging - complete, filled transport packages and unit loads - water - spray test

    包裝.完全滿裝的運輸包裝件和單元裝載.水噴淋試驗
  7. As an inlet structure, the forbay is an important part of the pumping station. the pressurized forbay, close in top structure, is a kind of particular forbay in which water is pressurized. based on the integral hydraulic model test of shanghai changqiao waterwork ' s water - transport pumping station, some research on the hydraulic characteristics of the pressurized forbay has been done in the paper. the main content is listed as follows : l. the hydraulic characteristics of the pressurized forbay in different water supply combination and different pump unit combination without divertion measure, and the reason of the poor flow state. 2. the hydraulic characteristics of the pressurized forbay with diversion pier, and the reason why the flow state can be improved. 3. the experimental research on the critical air suction condition of the pressurized forbay

    本文基於上海長橋自來水廠改造工程送水泵站整體水力模型試驗,對有壓前池的水力特性進行了研究,研究的主要內容如下: 1 、無導流措施的有壓前池在不同供水組合及不同機組開機組合條件下的水力特性,並分析了流態較差的原因; 2 、加設導流墩後有壓前池的水力特性,以及加設導流墩流態改善的原因; 3 、有壓前池進氣臨界條件的試驗研究; 4 、水泵進氣以後水泵性能的討論。
  8. Packaging - complete, filled transport packages and unit loads - water - spray test iso 2875 : 2000 ; german version en iso 2875 : 2002

    包裝.完整滿裝運輸包裝件和單元貨載.噴水試驗
  9. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的設計製造經驗,擁有多項專利技術,生產的同步發電機永磁機技術工藝先進,製造精良,能滿足與各式水輪機配套的不同技術條件要求。目前公司已製造投產的發電機容量范圍為0 . 120mw ,具備生產單擊容量50mw的能力,發電機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高電壓達13 . 8kv ,公司製造的甘肅永昌東河水電站34500kw水輪發電機組,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有電機試驗站絕緣材料試驗室等先進的實驗室設施和測試手段,使產品從原材料進產,到成品出產的各項電器性能測試均能滿足設計要求。
  10. In order to study the characteristics of the stepped spillway overflow comprehensively and seek for the measure to increase the energy dissipation of the stepped spillway at large unit discharge, the method of turbulence numerical simulation and model test are used to study the stepped spillway overflow. in view of the curved free water surface, complicated boundary condition and turbulence flow, it very difficult to simulate the stepped spillway overflow

    為了對階梯溢流壩面流場特性進行全面的研究,同時探求在大單寬流量下提高階梯溢流壩消能率的措施,本文採用紊流數值模擬與實驗相結合,數值計算為主、實驗為輔的研究方法對階梯溢流壩面流場進行了較系統深入的研究。
  11. The direct - inserted solar energy water heater can be used independently for household life, and connected in series or in parallel into a collective hot water supply system for unit such as factory, mine, school, armed forces, guest house, hotel etc. where volume of hot water is needed not so much. both the full glass vacuum heat collection tube which takes natural convection of heat exchange and the heat pipe with superconducting medium have passed the ice and snow test in cold area, and have been recognized by customers in various kinds of climate conditions

    這種系統包括熱管真空管全玻璃真空管,熱保溫水箱,循環網路系統,循環泵和控制器系統,其工作原理:建立於定點溫度的基礎上,介於集熱器和熱保溫水箱間的循環泵系統強制循環,集熱管吸收的太陽能不斷的轉化為熱能,使水箱里的水不斷加熱。
  12. Responsible for and launch enterprise unit horizontal weighing apparatus test and establish and work with water - savings enterprise unit, handle capital construction examine and approve the item with ink

    負責開展企業單位水平衡測試和節水型企業單位創建工作,辦理基建用水審批事項。
  13. Responsible for horizontal weighing apparatus test job, unit of water, and establish water - saving city and establish water - saving enterprise unit activity, popularize and apply water - saving new technology, new craft, new equipment, new utensil and other water - saving scientific and technical results

    負責用水單位水平衡測試工作和創建節水型城市及創建節水型企業單位活動,推廣應用節水新技術新工藝新設備,新器具以及其他節水科技成果。負責全市節水宣傳教育和節水技術技能的業務培訓工作。
  14. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考