water tunnel test 中文意思是什麼

water tunnel test 解釋
水筒試驗
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. Through tunnel model test, the action law of external water load on secondary lining with a grouting loop is obtained

    根據隧道模型試驗理論,通過室內模型試驗得出了有注漿堵水圈的隧道襯砌結構外水荷載的作用規律。
  2. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  3. Based on the cause analysis for failure of water stop of tunnel ' s cast in site circular construction joint from theoretical and constructional point of view as well as the working mechanism of expansive water stop proposed in terms of width of construction joint, the relation between width of circular construction joint and water pressure resistance of water stop is established and its model test carried out

    首先從理論和施工角度分析了隧道現澆環向施工縫止水條的失效原因,然後從施工縫張開度的角度提出了膨脹止水條止水的原理,在此基礎上建立了施工縫張開度與止水條抗水壓力之間的關系,並進行了模型試驗。
  4. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙帶對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  5. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  6. ( 6 ) according to test result and data, combined with water and geological feature of railway tunnel surrounding rock, a suggested table of decrease coefficient about external water load on railway tunnel lining structure is put forward

    ( 6 )根據試驗結果和數據,結合鐵路隧道圍巖水文地質特徵、地下水影響情況以及其他行業有關資料,初步提出了鐵路隧道襯砌結構外水荷載折減系數建議表。
  7. ( 7 ) as for the tunnel which is located at a karst zone with a complicated water environment, considering the safety of the tunnel structure and the result of test and calculation, the design of tunnels should be carried out with external water load

    ( 7 )計算和試驗均表明,對於水環境條件復雜的巖溶富水區隧道,為了結構的安全起見,宜接考慮外水荷載的荷載組合原則來設計。
分享友人