water turbine generator 中文意思是什麼

water turbine generator 解釋
水輪發電機
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • turbine : n 【機械工程】(渦)輪機,葉輪機,汽輪機,透平機。 a hydraulic [water] turbine 水輪機。 a steam t...
  • generator : n 1 產生者,生殖者,創始者。2 發電機,發生器。3 【音樂】基礎低音。4 = generatrix a D C generator...
  1. Nuclear power station with pressurised water reactor is basically divided into the " nuclear island " where steam is produced in the steam generator by nuclear power generated from a reactor, a " conventional island " where steam supplied from the nuclear island is used to drive the turbine - generator to produce electricity, and the balance of plant ( bop ) which consists of the station auxiliaries and ancillary plants, etc

    採用壓水式反應堆的核電站基本分為核島、常規島和核電站其他部分。由反應堆產生的核能會通過在核島內的蒸汽發生器產生蒸汽,而核島所供應的蒸汽會推動常規島內的渦輪發電機發電。核電站其他部分則包括站內的輔助設備及附屬設施等。
  2. Nuclear power station with pressurised water reactor is basically divided into the " nuclear island " where steam is produced in the steam generator by nuclear power generated from a reactor, a " conventional island " where steam supplied from the nuclear island is used to drive the turbine - generator to produce electricity, and the balance of plant which consists of the station auxiliaries and ancillary plants, etc

    採用壓水式反應堆的核電站基本分為核島常規島和核電站其他部分。由反應堆產生的核能會通過在核島內的蒸汽發生器產生蒸汽,而核島所供應的蒸汽會推動常規島內的渦輪發電機發電。核電站其他部分則包括站內的輔助設備及附屬設施等。
  3. In order to guarantee the normal operation of hydroelectric generator unit, it is necessary to make a thorough test of the performance and characteristics of a governor before it is installed or after it is overhauled. to facilitate the test of the governor, a real - time dynamic simulator based on pcc for water turbine governing system was developed. it has three functions : simulating controlled objects ( pressure water conveying system, water turbine, generator and electric grid ), simulating governor " s electro - hydraulic servo system and working as a real - time measuring system for governor

    水輪機調速器是水輪發電機組一個很重要的自動化調節設備,它由調節器和電液隨動系統組成,在調速器安裝或者大修后都要對其性能和特性進行全面測試,為了方便對水輪機調速器的測試,特開發水力機組調速系統實時動態模擬儀,該模擬儀具有三種功能:對調速器調節對象(有壓引水系統、水輪機、發電機和電網)進行模擬、對調速器電液隨動系統與調節對象進行模擬和作為實時測試系統監測調速器的工作是否正常。
  4. Artificial neural network algorithm for calculating efficiency of water turbine generator unit

    水電機組效率的神經網路演算法
  5. Small water turbine - generator set

    小型水輪發電機組
  6. Test on water leakage or hydrogen leakage of steam - turbine generator

    汽輪發電機漏水漏氫的檢驗
  7. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河壩水電站的設計方案,對水輪機調節系統,按長引水管道復雜引水系統、彈性水擊、調速器為pid調節規律,在小波動情況下,對包括引水道、調壓井、尾水管、水輪機、發電機、調速器在內的水輪機調節系統建立數學模型,並計及引水管道水力摩阻損失,對水輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。
  8. Francis turbine generator set of both vertical and horizontal types are suitable for water head from 10m to 300m. its feature is that the water flow enters the runner inward in a radial direction, changes direction gradually and then passes out axially

    水斗式水輪發電機組適用於水頭80 ~ 800米,是利用水流動能沖擊水輪機轉輪旋轉作功,且其噴嘴的射流中心與轉輪在同一平面上。
  9. By applying the method of reliability technique, according to the eletric equipments reliability evaluate rules, this paper systematically analyzes faults which possibility or usually appear in turbine, generator, speed - adjusting controller in water power station and their reasons and effect factors. meanwhile it also uses the method of fat to study the fmea and preventive fault measures of turbine of zz500 - lh - 1020 and find out the biggest risk from all parts risk in turbine of zz500 - lh - 1020. this paper analyses the technique of reliability management of main equipments

    本論文運用可靠性技術中的有關方法,依據《發電設備可靠性評價規程》對機組的可靠性狀態進行分類,系統地分析了水輪機、發電機、調速器等三大機械主設備中可能或經常出現的故障,產生這些故障的原因及其影響因素;同時,使用故障樹分析方法,研究了zz500 - lh - 1020軸流轉漿式水輪機轉輪的故障模式及其影響,同時也分析了預防處理這些故障的措施;通過危害度分析,找出了zz500 - lh - 1020軸流轉漿式轉輪中各個部件的危害性大小與危害性最大的部件。
  10. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  11. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  12. The axial - flow turbine generator set is suitable for low head from 2m to 70. its feature is that the water flow passes through the runner axially. the axialflow turbine generator set can be classified into two forms according to the runner construction : one is fixed blades propeller for small variation of head and power, the other is movable blades kaplan for large variation of head and power

    貫流式水輪發電機組是低水頭大流量電站的較好機型,一般適用於水頭2 ~ 15米,其特點是水流從進水口到尾水出口都是軸向的,流道基本上成直線,因而貫流式水輪發電機組具有水流特性好,效率較高等特點。
  13. With the increasing of capacity of hydrodynamic motor generator, water turbine ' s blade run in villainous environment. it is n ' t advantageous to the safety of the blade

    隨著水輪發電機組容量的不斷增大,水輪機葉片處于更為惡劣的環境中運行,這對葉片的安全十分不利。
  14. Urbular turbine generator set is suitable for heads from 2m to 15m and large discnarge. its feature is that water flow is axial throughout the passage from the inlet to the outlet, so that the passage is straight conduit essentially. the tubular turbine generator set is characterized by good characteristic of water flow and high efficiency. etc

    混流式水輪發電機組廣泛適用於高中低各種水頭,一般從10米至300米,其特點是水流流經轉輪葉片時先沿著幅向進入,然後逐漸變成軸向離開,因而混流式水輪發電機組具有運行可靠,結構簡單,平均效率較高等特點。
  15. In this paper, the technique of computational fluid dynamics ( cfd ) is adopted to simulate the air distribution in the generator hall, the water - turbine hall and switch station. analyzes and compares the distributions of the velocity field, the temperature field and the pmv - ppd in the workshop by different outlets layouts, outlets quantity and outlets size, bring forward applicable scheme for the engineering, provide the basis of the workshop ventilation design

    對不同的風口大小、風口數量、風口布置位置形成的廠房內速度場、溫度場、 pmv - ppd分佈進行了分析對比,提出適合於工程實際的送風方案,並對所選方案的不同運行工況進行了數值模擬研究,為設計及運行實踐提供了依據。
  16. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的設計製造經驗,擁有多項專利技術,生產的同步發電機永磁機技術工藝先進,製造精良,能滿足與各式水輪機配套的不同技術條件要求。目前公司已製造投產的發電機容量范圍為0 . 120mw ,具備生產單擊容量50mw的能力,發電機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高電壓達13 . 8kv ,公司製造的甘肅永昌東河水電站34500kw水輪發電機組,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有電機試驗站絕緣材料試驗室等先進的實驗室設施和測試手段,使產品從原材料進產,到成品出產的各項電器性能測試均能滿足設計要求。
  17. This software are compiled in vc + + computer language. the main function of the application is to calculate the load limitation of an air - cooling steam turbine - generator set under distinct flux of cooling water, environmental temperature and environmental wind speed, and the back pressure safeguard curve of the target steam turbine are considered

    應用軟體以vc + +為開發平臺,考慮了特定汽輪機組的背壓保護曲線,通過計算空冷系統的熱力特性,實時給出當前環境溫度和環境風速以及循環水流量下機組的上限負荷,從而指導機組的運行。
  18. Study on the application of the reliability theory in the fault diagnosis of the water turbine generator set

    可靠性理論在水輪發電機組故障診斷中應用的研究
  19. Analysis of bifurcation and stable region for water turbine generator shaft torsional vibrations

    大型水輪發電機組軸系扭振的分岔和穩定域分析
  20. 700mw water turbine and water turbine generator, and bush of fan, oxygen concentrator, rolling milling, spherical machine, and pump, and the integrated electric ring, fittings of motor

    本公司專業生產200mw 600mw汽輪機及汽輪發電機軸瓦550mw 700mw水輪機及水輪發電機軸瓦鼓風機制氧機軋鋼機球磨機泵等大型軸瓦以及電機的集電環和配件。
分享友人