water-level rise 中文意思是什麼

water-level rise 解釋
水位上升
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • level : n 1 水平儀,水準儀;水準測量。2 水平線,水平面;水平狀態;平面,平地。3 水平,水準;水位;標準;...
  • rise : vi (rose; risen ) (opp fall sink)1 上升,升起;(日、帆等)現出,出來;(地勢)向上斜,隆起。...
  1. Through explaining the low - fluidity oil - deposit development structure in zaoyuan oil field, analyzing its reservoir structure and the strong flooding level hole design parameters, meanwhile adopting new techniques such as pouring water by phase control at the spot, weak point and strong plane, and so on to manage comprehensively and develop round, we have reduced the natural decrease and increased the exploitable reserves and caused the comprehensive development level of this field to rise from class 3 to class 1

    摘要對棗園油田低流度油藏開展構造精細解釋、相控儲層結構分析和強水淹層孔隙結構參數研究,同時在現場採用相控注水、點弱面強、投球調剖和注水吞吐等開發技術進行綜合治理和滾動勘探開發並舉,實現減緩自然遞減和增加可采儲量的目的,使該油田綜合開發水平由3類上升到1類。
  2. Benthic foraminifer fauna, ams14c dating and acoustic sub - bottom profile was analyzed in the core ey02 - 2 and ey02 - 1 drilled from the muddy deposit in the middle southern yellow sea and the mid - shelf of north east china sea. considering the results of core qc2 ? dz4 and the standard oxygen isotope curves, we discussed the late - quaterenary paleo - environment evolution, benthic foraminifer fauna, paleo - climate, the climate events and water mass in postglacial period, average sedimentation rates, paleo - water depth, origin of sediments, average sea level rise rate in the shelf of south yellow sea and east china sea. at last we discussed the condition of sea level rise in the east china, green house effect and the protection of coastal zone

    本文根據南黃海中部泥質區和東海中陸架的兩個鉆孔巖芯的古生物、 ams ~ ( 14 ) c測年、淺地層剖面等,參考qc _ 2 、 dz _ 4成果及標準氧同位素曲線探討了黃東海陸架晚第四紀古環境演化、底棲動物群特徵、古氣候、冰後期以來氣候事件、古水團、沉積速率、古水深、沉積物源、海平面平均上升率,討論目前中國東部海平面上升的狀況、溫室效應及海岸帶保護。
  3. Submersed land area including different utilizing type by sea water are calculated and the potential economic loss and population affected by the submerged disaster are assessed for no defence , different sea - level rise and high water level. furthermore, special topic maps of fatalness of sea level rise, vulnerability of land system, socio - economic and ecological vulnerability, and defending ability are produced. the following results are combined with the basic study cell based on area source model following mathematical models of risk evaluation, considered of defence or no defence

    運用海平面上升災害危險性、土地系統易損性、社會生態經濟易損性和抗災能力的數學模型,在mapinfo軟體下運行,得到該區上述四種評估因子的專題圖;並分別按照考慮抗災能力以及不考慮抗災能力兩種情況,用海平面上升災害風險評估模型融合各因子,得到遼河三角洲(盤錦市)海平面上升災害綜合風險評估圖。
  4. It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works

    特別提出,按照恆定流計算出來的設計水位比非恆定水位具有一定的安全儲備;而對于灘地糙率的低估又會造成設計水位的偏低,給防洪工作帶來隱患;如果利用改進斷面形式來降低水位或彌補糙率增加帶來的水位抬高,需要較大的工程量,所以平時應注意灘面的減糙管理工作。
  5. This pull causes the sometimes dramatic rise of water level in the ocean.

    這種引力有時引起海洋水面的劇烈上升。
  6. The relatively slow movement and the persistent wind of ellen resulted in a significant rise in the level of sea water called storm surge causing extensive flooding over western kowloon

    受到愛倫較緩慢的移動速度及持續的大風的影響,海平面明顯上升被稱之為風暴潮,引致九西部廣泛水浸。
  7. It was indicated that the density of the filled soil and the drainage condition of the slope were the major factors controlling the deformation and failure of slope caused by the rise of ground water level

    分析結果表明:填土密度和斜坡排水條件是影響斜坡因地下水位上升而變形和破壞的重要因素。
  8. The inner factors refer to the mechanical behavior such as the rock type, density, construction parameter, etc. and the outer factors refer to the foundation condition, geological condition, valley shape, rise and fall of water level, seepage due to respiration

    內因是指堆石料的巖質巖性、密實程度、施工參數等組成壩體的各種力學性質;外因是壩址所處的基礎條件和兩岸的地形地質等條件、河谷形狀、水庫水位的變化、降雨浸潤等因素。
  9. Water always flows from a higher to a lower level, but everybody has an ambition to rise higher up in society.

    水向低處流,人往高處走。
  10. According to the data analysis, the large scale and continuous excavating sand from the riverbed, which has caused the riverbed downcutting, water level decline and relative strengthening of tidal action, is the basic and main cause that raises the saline water intrusion in the peal river network area, but the arid climate and the sea level rise only aggravate the disaster

    咸潮災害發生前和發生時期進行的大規模採掘河沙活動使三角洲河床普遍大幅度下切,河流水位下降,潮汐作用相對增強,這是引發咸潮的主要原因;而天旱和海平面上升等則使咸潮災害加重。
  11. Effecting of enclose tideland for cultivation on water level in the same flow level are quantitatively analyzed, the main achievement and suggestions are given as follows : ( 1 ) the water level rise is the most which effected by enclose tideland for cultivation dyke when flow is 2000m3 / s, the max water level difference in case of enclose tideland for cultivation dyke or no arrives 0. 66 m

    定量地分析了圍墾堤對同級流量下的庫水位的影響,主要成果結論及建議如下: ( 1 ) 2000m ~ 3 /時庫區圍墾堤對水庫水位抬升最大,有無圍墾堤水庫水位差最大達到0 . 66m 。
  12. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽水庫泥沙淤積入手,分析水庫泥沙淤積特性和庫區圍墾堤開發利用淤積灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調蓄庫容、造成同級流量下水庫水位抬升水庫回水上延、對沿岸及過河建築構成影響、因水位抬升致使庫區周邊灌區地下水排水不暢乃至倒灌而造成土地鹽堿化、對水庫庫區大量淤積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出庫區圍墾堤是水庫水位抬升的重要原因。
  13. Such a rise shortens the return period of high water level by half, that is, a high water level with a return period of 50 years would have a return period of about 25 years after the rise in the mean sea level.

    楊繼興說:維多利亞港的海平面在過去五十年上升了0 . 12米,這個升幅會使最高水位的重現周期縮短約一半。即是說,原本重現周期是五十年的水位,在海平面升高后的重現周期會是大約二十五年。
  14. The discharge capacity decrease and the water level rise as the floodplains " roughness increase

    隨著灘地糙率的增加,灘地的過流能力降低,沿程水位隨之抬高。
  15. On the basis of the result of the research on the landslide damming of river, failure of landslide dam, outburst flood and landslide surge, the failure of the part of landslide will arise a maximum surge height to 6m at the dam site, at the same time, the height of landslide dam will reach possibly 33m, and the flood peak of outburst flood will reach 15841 ~ 7613m3 / s, and make water level to rise at 11 ~ 4m through jinjiang to xiluodu of the jinsha river

    堵江潰壩及涌浪研究結果表明,局部的邊坡失穩在壩址處引起的涌浪高達6m ,並可能形成高約33m的滑坡堵江壩,潰決洪水將在金江至溪洛渡河段形成15841 7613m ~ 3 / s的洪峰流量,使得此段江水位上漲11 4m 。
  16. The rigid limit equilibrium computation and finite element computation have been performed which concluded that the integral stability coefficient of no. 2 landslide shall be the minimum value when water level is 2145m a. s. l., then the coefficient increases slightly as the reservoir water level rises up, there exists, however, a fact that the stability coefficient of local section may tend to decrease continuously along with the rise of reservoir water level

    進行了剛體極限平衡計算和有限元計算,證明號滑坡的整體穩定系數在2145m水位時最低,在此水位以上,將隨庫水位升高而略增;但局部斷面穩定系數有隨庫水位升高而不斷下降的情況。
  17. The effect of the rise of ground water level was simulated by increasing the mass density of pore water in the soil elements between the initial and targeted ground water levels

    通過逐步改變初始和終止地下水位間土單元中孔隙水的密度模擬地下水位上升的效應。
  18. Such a rise shortens the return period of high water level by half, that is, a high water level with a return period of 50 years would have a return period of about 25 years after the rise in the mean sea level. " nevertheless, as the effects of storm surges and long term sea level rise have been taken into consideration in the design of coastal projects, it is unlikely that the sea level will pose a threat to hong kong in the near future

    12米,這個升幅會使最高水位的重現周期縮短約一半。即是說,原本重現周期是五十年的水位,在海平面升高后的重現周期會是大約二十五年。雖然如此,由於香港的海岸工程在設計時已考慮了風暴潮效應及海平面可能會上升,相信在未來一段時間內香港的海面高度仍不會對香港構成威脅。
  19. Related elucidation : in the above data, from the entry - level pure water to pure water, it measures to 75 % for. namely each 1. 25 rise the entry - level pure water can produce pure water 1 rise, the running water system is pure aqueous of parameter is also such, from above the data can see, in make take the circuit plank the production have to of the purely aqueous process, adoption collections waste water of way, make the waste water get and return and use in water, reduce waste water and exhaust in the meantime, in this process, not only a great deal of decrease the waste water exhaust quantity, and list make water cost but talk, use waste water each time produce on signing square and pure water, can decline low cost 0. 34 dollars at least, more important can lower waste water and exhaust quantity consumedly

    相關說明:以上數據中,從初級純水到純水,其為出量為75 % .即每1 . 25升初級純水可以產純水1升,自來水制純水的參數也是如此,由以上數據可以看出,在制取線路板生產所必須的純水的過程中,採用收集廢水的方式,使廢水得到中水回用,同時減少廢水排放,在此過程中,不但大量減少了廢水排放量,並且單就制水成本而言,用廢水每生產一立方純水,可至少降低成本0 . 34元,更重要的是可以大大降低廢水的排放量
  20. Impacts of the construction of key water conservancy projects in the yangtze river and sea level rise on water quality of shanghai water intake

    三峽與南水北調工程建設及海平面上升對上海城市供水水質的可能影響
分享友人