weak-link theory 中文意思是什麼

weak-link theory 解釋
弱環理論
  • weak : adj 1 柔弱的;虛弱的,有病的。2 無力的,軟弱的;(根據等)不充分的,薄弱的。3 不中用的;愚鈍的;...
  • link : n 1 環鏈環。2 (編織物的)鏈圈。3 (鏈狀物中的)一節(多節香腸等的)一節單節小香腸。4 承前啟后的...
  • theory : n. 1. 理論,學理,原理。2. 學說,論說 (opp. hypothesis)。3. 推測,揣度。4. 〈口語〉見解,意見。
  1. Based on the count of failure in the samplers, this paper analyzes the weak link of the quality of domestic automobile products. with the help of mathematical statistics and automobile reliability theory, we get the failure law of bus, truck and car of the domestic automobile industry and their failure distribution function, reliability function, probability density function, and failure rate function. accordingly, the present situation of reliability in domestic automobile products is expounded

    本文通過對樣車的故障進行統計,分析了我國汽車產品質量的薄弱環節,並藉助數理統計手段和汽車可靠性理論,得出了國產客車、載貨汽車以及轎車的故障規律和相應的故障分佈函數、可靠度函數、故障密度函數及故障率函數,論述了國產汽車產品的可靠性現狀。
  2. During the transverse analysis, as the discussion of frame bracing condition that exists in the new vision < code for design of steel structures > gb50017 - 2002 has been lead into the stability analysis of staggered truss system, the concept of strong and weak bracing staggered truss system, and the concrete dividing standard are also given, so that makes the staggered truss stable theory have a good link with the new code, and provide theory guarantee for designers

    橫向分析時將我國新修訂的《鋼結構設計規范》 gb50017 - 2002中,關于框架體系支撐條件的論述引入到錯列桁架的穩定分析中,提出了強支撐錯列桁架體系和弱支撐錯列桁架體系的概念以及具體的劃分標準,使得錯列桁架的穩定分析可以與新規范很好的對接,為設計人員的使用提供了理論保障。
  3. The way and content of this thesis are as followed : ( 1 ) based on briefly describing the company present condition and problems of management with analysis of such question, this thesis pointes out that putting crm into practice is an effective measure to resolve manage bottleneck, then research its feasibility and definite its line degree in the practice ; ( 2 ) analyze the importance of ex - period preparing work to put crm into practice ; ( 3 ) adjust the company ' s business enterprise culture to replace and recreate the reforming atmosphere to guarantee such work in a low cost with smoothly progress ; ( 4 ) analyze the buildup construction of the company and the business process, aim at the unreasonable construction to proceeds with business process to give a new life, especially at changing the company organization construction with the business process re - engineering ( bpr ) ; ( 5 ) apply the theory of customer letting the worth and the method of customer ' s pyramid divide into section, collect the customer ' s data with the t echnique of american broadcast company to customer data analysis with categorize, provide knowledge to be used by the leaders and help them make the correct decision ; ( 6 ) according to the knowledge of data refined, application wooden pail theories with leaking a theories, aiming at the weak link of company management, make out the concrete strategy to increase the customer ' s satisfaction and loyalty

    本文研究的思路和內容是: ( 1 )簡述公司經營管理現狀,以公司經營和管理現狀為研究基礎,解析出實施客戶關系管理是解決管理瓶頸的突破口和切入點,然後對公司實施客戶關系管理的可行性加以研究和論證,明確了實施可行度; ( 2 )解析實施客戶關系管理前期準備工作的重要性,明確高層領導參與和支持的必要性,建立實施項目管理組,並作好實施規劃工作; ( 3 )調整公司的企業文化,為組織變革創造改革氛圍,以保證實施的低成本和順利進行; ( 4 )分析公司的組織結構和業務流程,針對不合理結構和業務流程進行再造,重點是運用業務流程再造理論改變公司組織結構和業務流程; ( 5 )運用客戶讓渡價值理論原理收集客戶資料,運用客戶金字塔和abc分類法對客戶資料分析和歸類,運用客戶管理信息系統,利用數據庫技術和數據挖掘技術對客戶資料進行科學分析和歸納,提煉成供決策領導層使用並能做出正確決策的知識; ( 6 )根據所提煉出的知識,運用木桶理論和漏桶理論,針對公司管理薄弱環節分析公司應該採取的客戶維系策略,制定適合公司發展的以提高客戶滿意度和忠誠度為目的的具體策略。
  4. The theories of compilation about teaching material are always the weak link of curriculum research. at present, we have n ' t the theory systems and practical theory data that can guide the leaching material ' s compilation

    教材編制理論一直是課程研究領域的薄弱的環節,就目前來看,缺少用以指導教材編制的較為系統和實用的理論資料。
  5. It is a weak link in project management, so we have to discuss and research a fit method that could give directions in practice. this text is summing up the theory about project post evaluation in power company ’ s projects, through making analysis of fast protecting project in jkm - 1 type line and getting review and summarize the domestic and foreign project post evaluation

    在實踐中,由於整個運行過程沒有形成完全閉環,往往造成項目決策者在批準項目之後,很難在外部環境變化中對項目進行有效的控制,另外,也沒有一種定量的評價體系對項目的完成情況進行有效的跟蹤管理,致使推廣應用很受局限。
分享友人