wiring point 中文意思是什麼

wiring point 解釋
接線點
  • wiring : n. 1. 【電學】線路;配線;接線;布線;架線。2. 【醫學】(骨折的)金屬線縫合術。
  • point : n 1 尖頭,尖端;尖頭器具;〈美國〉筆尖;接種針,雕刻針,編織針;小岬,小地角;【拳擊】下巴。2 【...
  1. For protective female worker healthy, law set the labor range that female worker prohibits be engaged in, unit of choose and employ persons must not arrange female worker to be engaged in the following these law prohibit the labor that female worker is engaged in : ( 1 ) course of study of mine well dirty ; ( 2 ) silvan industry cutting, put in arris and banish exercise ' s charge ; ( 3 ) " physical labor intensity classifications " the 4th class in the standard the exercise of physical labor intensity ; ( 4 ) the assembly of bldg. scaffold and remove operation, and the altitude wiring of electric power, telegraphic industry works ; ( 5 ) load continuously ( point to load the frequency is in 6 times hourly above ) load every time more than 20 kilograms, discontinuous load load every time more than 25 kilograms exercise

    為了保護女職工的身體健康,法律規定了女職工禁止從事的勞動范圍,用人單位不得安排女職工從事以下這些法律禁止女職工從事的勞動: ( 1 )礦山井下作業; ( 2 )森林業伐木、歸楞及流放作業; ( 3 ) 《體力勞動強度分級》標準中第四級體力勞動強度的作業; ( 4 )建築業腳手架的組裝和拆除作業,以及電力、電信行業的高處架線作業; ( 5 )連續負重(指每小時負重次數在6次以上)每次負重超過20公斤,間斷負重每次負重超過25公斤的作業。
  2. The labor range that female worker contraindication undertakes includes : ( 1 ) course of study of mine well dirty ; ( 2 ) silvan industry cutting, put in arris and banish exercise ' s charge ; ( 3 ) " physical labor intensity classifications " the 4th class in the standard the exercise of physical labor intensity ; ( 4 ) the assembly of bldg. scaffold and remove operation, and the altitude wiring of electric power, telegraphic industry works ; ( 5 ) load continuously ( point to load the frequency is in 6 times hourly above ) load every time more than 20 kilograms, discontinuous load load every time more than 25 kilograms exercise

    女職工禁忌從事的勞動范圍包括: ( 1 )礦山井下作業; ( 2 )森林業伐木、歸楞及流放作業; ( 3 ) 《體力勞動強度分級》標準中第四級體力勞動強度的作業; ( 4 )建築業腳手架的組裝和拆除作業,以及電力、電信行業的高處架線作業; ( 5 )連續負重(指每小時負重次數在六次以上)每次負重超過二十公斤,間斷負重每次負重超過二十五公斤的作業。
  3. Some anti - interference techniques are introduced such as appropriate circuit layout and wiring, the component and device screening as well as digital filter and the zero point processing in software

    提出了通過從電路合理的布局布線和元器件的篩選以及軟體的數字濾波和零點處理等措施來達到抗干擾的目的。
  4. This article angle has analyzed the higher professional technical education from cbe / dacum " the electrical control technology " the curriculum ability localization, according to the higher professional technical education " the electrical control technology " the curriculum ability localization, point out the insufficiency and flaw existed in commonly used control electric appliance choice, electrical pilot wire road map, electricity control system installment, wiring craft, electrical control line fault diagnosis system approach, new starting velocity modulation equipment and control circuit, control circuit and main circuit aspect and so on

    摘要本文從cbe / dacum角度分析了高職「電氣控制技術」課程的能力定位,根據高職「電氣控制技術」課程的能力定位,指出了現行高職「電氣控制技術」教材在常用控制電器選擇、電氣控制線路圖、電氣控制系統安裝、接線工藝、電氣控制線路故障診斷的系統方法、新型起動調速設備及控制電路、控制電路與主電路的連接等方面存在的不足和缺陷。
  5. It is recommended that twisted pair wiring and coaxial cabling be provided with suitable data line protection, at the point where the signals penetrate the metal cabinet walls, with the protectors referenced to the metal cabinet by a short wire ( < 15cm )

    如果光纜直接進入箱體內,則無須做任何數據線或信號線的保護,因為沒有金屬導體路徑能讓電涌電壓進入到設備內部。
  6. Networked control system ( ncs ), i. e. network - based control system, is a control system architecture in which all control system components are connected together to build feedback control loops by a real - time network. compared with traditional centralized point - to - point control systems, networked control systems provide several advantages such as reduction of wiring and cost, easy installation and maintenance, high reliability and flexibility

    基於網路的控制系統( network - basedcontrolsystem , ncs )又稱網路控制系統( networkedcontrolsystem ) ,就是在現實的分散式控制需求和網路通信技術發展的推動下產生的一種新型的控制系統體系。
  7. In this case components should be mounted on a board having a continuous copper ground plane ( ideally on both sides of the board, though while convenient this is not essential ), with ground connections made to the plane and short point to point wiring made above and below it

    用於搭試的電路板最好有連續的地層(如果雙面都有地層就更理想了,雖然調試起來會不太方便) ,這樣接地的導線和層間連接線都會比較短。
  8. Connectors, electrical, jacks, tip test point, panel or printed wiring type, general specification for

    面板型或印製線路型檢測插口總規范
分享友人