work scheduling 中文意思是什麼

work scheduling 解釋
工作進度安排
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  • scheduling : 編排;調度
  1. Digital image processing consume a large amount of memory and time commonly. basing on the advantage of fpga, the paper design harware module by hdl ( hardware language ), i. e., some function is achieved by les ( logic element ) of the fpga. the real - time of digital image processing is achieved by this. the sample and display of digital image is the important part. so, the paper mainly design the sample and desplay module. the sample card is designed and it ’ s word mode is configured according china ’ s cvbs ( composite video bar signal ). for acquiring the image and storing it correctly to sram, the paper design the sample - control module. the sample module can work correctly using least time. the reliability and real - time achieve the reference. according the vga principle and scheduling of the ths8134, the paper design a vga - control module by hdl. firstly, the control signal is synthesized secondly, the horirontal and vertical synchronization signals is synthesized according to the vga interface standard

    圖像處理的特點是處理的數據量大,處理非常耗時,為實現數字圖像的實時處理,本文研究了在fpga上用硬體描述語言實現功能模塊的方法,通過功能模塊的硬體化,解決了視頻圖像處理的速度問題。圖像數據的正確採集和顯示輸出是其中的兩個重要的模塊,因此,本文主要完成了圖像數據的採集和顯示輸出的設計。本文設計了採集卡,並要對其工作模式進行了配置和編寫了採集控制模塊,在採集控制模塊的控制下,將數字圖像數據正確無誤的存儲到了sram中。
  2. Interactive voice response based field force automation system enabling point and click service scheduling and dispatching. equipment maintenance, work order, purchase order tracking and management

    -從事高速公路收費系統智能小區管理系統vod點播系統酒店管理軟體等開發
  3. For the problems of load balance between clusters, the author and his research team build a job migration management system which is able to work with dedicated job scheduling system of every cluster, set up the multi - cluster resource reserving plan and the mechanism to enable jobs to utilize the idle resources in whole cluster group by migrating, and formulates a algorithm to compare migrating destinations

    針對集群系統之間負載平衡問題,作者及課題組研製了集群系統間的作業遷移管理系統,實現了集群組之間的資源保障計劃和作業通過遷移利用集群組空閑資源的機制,制訂了遷移目標比較演算法。
  4. The fourth chapter introduces mas mechanism to construct a dynamic job - shop scheduling system, with ga providing basic support. mas mechanism decomposes a continuous and dynamic job - shop scheduling problem into series of jssps so that the predefined ga can work out the schedule

    在ga提供了求解jssp的有效支持的基礎上,本文引入多代理思想管理車間生產動態過程,以將動態jssp分解為一系列靜態jssp ,從而能通過ga方法求解。
  5. The noise mitigation measures should be adopted such as barrier enclosure, proper positioning of equipment, careful scheduling of work or adoption of quieter methods

    工程進行時,必須採取有效措施,例如:隔音屏、選擇較佳的位置安放機器、安排工作時間或選用較寧靜的施工方法。
  6. Work environment scheduling work environment scheduling human factors

    工作環境-排程人的因素
  7. The main procedure and steps are following as : according the random characteristic of the time spent by each work procedure, computer simulation is applied to produce the most possible scheduling network. and by corresponding optimization and adjustment on the network, the cost and scheduling construction network can be obtained ; during the practical construction according to the network, the warp between the actual cost and expected scheduling is tracked dynamically. then the computer simulation system is used to predict the future cost and progress operation, and take corresponding precautionary measures to control beforehand

    其主要思想與步驟為:首先運用計算機模擬技術來模擬工序作業時間的隨機特性,產生概率最大的施工網路計劃,並對其進行優化和調整,以獲得滿足工期、質量要求的成本及網路計劃;在施工過程中動態跟蹤施工實際成本與進度與目標計劃所發生的偏差以及質量問題,然後根據已出現的偏差,利用計算機模擬技術對項目未實施部分進行進度、成本的預測和分析,根據現有信息對網路計劃未完成部分進行調整和優化,以盡可能把各項費用控制在預定計劃成本之內或使工程的綜合指標最優。
  8. However, under heavy contention, performance will suffer dramatically, as the jvm spends more time dealing with scheduling threads and managing contention and queues of waiting threads and less time doing real work, like incrementing counters

    然而,在競爭激烈時,這將大大損害性能,因為jvm用了更多的時間來調度線程,管理競爭和等待線程隊列,而實際工作(如增加計數器)的時間卻很少。
  9. In the development process of simulation model, the paper models the container terminal logistic system from the aspects of the whole design, vessel scheduling management and frontward loading and unloading work

    在模擬模型的開發過程中,分別從總體設計、船舶調度管理、前沿裝卸作業等幾個方面對集裝箱碼頭物流系統進行建模。
  10. We ll also look at the role of scheduling work so that blocks and units are completed in a timely fashion

    我們還將分析如何調度工作使得工作塊和單元可以及時地完成。
  11. Further, applications that experience a high degree of contention usually exhibit lower throughput, not only because more time is spent scheduling threads and less time doing actual work, but because cpus may remain idle when threads are blocked waiting for a lock

    而且,在高度競爭環境下的應用程序表現出來的吞吐量通常會更低,這不僅是因為花在調度線程上的時間更多了,花在做實際工作上的時間更少了,而且當線程為了等待某一個鎖而被阻塞時, cpu可能處于空閑狀態。
  12. High speed uplink packet access ( hsupa ) is a new work item of technical specification release 6 in 3gpp. wcdma system. the techniques of this work item, i. e. node b controlled scheduling, hybrid arq with chase combining, shorter tti, are to improve the performance of uplink dedicated transport channels, i. e. to increase capacity and throughput and reduce delay

    在hsupa中通過採用基站nodeb控制調度、結合了軟合併的混合自動重傳請求( harq ) 、更短的傳輸時間間隔( tti )等關鍵技術,不但增強了系統容量與覆蓋還使用戶設備( ue )能獲得更大的上行吞吐、更小的傳輸延時。
  13. The three pillars of task scheduling : work, duration, and resources

    任務日程排定的三要素:工時、工期和資源
  14. According to the information management system developed for the standard part workshop, chengdu airplane company ( cac ) to realize its agile and cooperative work, this paper puts forward an architecture of virtual workshop management and control, implementing model of virtual workshop production scheduling and management system based on multi - agent principle, programming technology and method of constructing knowledge management system

    本文以實現成都飛機公司標準件製造車間的敏捷性和協同作業需要為實際背景,研究了虛擬車間管理與控制的體系結構、基於多智能體技術的虛擬車間生產作業規劃與管理系統的實施方法、網路編程技術及虛擬車間中調度和知識管理問題。
  15. All the work done shows that the system can meet the need of workshop job scheduling of current stage, and may establish foundation for the development of the system in the future

    研究和實際開發工作表明,系統能滿足現階段對車間作業計劃調度的要求,並為今後的發展奠定了基礎。
  16. A metascheduler schedules work across a number of clusters or grids, each of which has its own independent scheduling solutions

    元調度器負責在多個集群和網格中調度任務,每個集群和網格都有自己獨立的調度解決方案。
  17. Recurring to the technology of cpld / fpga, via the hardware description language, the equipment simulates some sspcs and the work - state of buses. besides, as a critical component in the system, owning to dsp ' s great task scheduling ability, dsp makes all the tasks work well. on the other hand, depending on the great communicational ability, a windows - based friendly intercommunicating interface is designed

    論文從本裝置的具體實現功能出發,採用自頂向下的設計思想,一方面使用硬體描述語言進行cpld fpga技術開發,完成多路sspc的多種工作狀態的模擬以及配電系統中匯流條的電能質量監測:另一方面利用dsp強大的任務調度能力,完成整個裝置各任務間的實時調度;此外dsp強大的通訊能力用來實現它與pc間的通訊,並設計了基於windows系統的友好的人機交互界面。
  18. Facilitate your client relationships through faster work flow, reduced delays and agile scheduling

    通過更快的工作流、減少耽擱以及靈活的時間安排,推動您的客戶關系
  19. Coordinate with other department personnel the scheduling of electrician, carpenter, painter, and night engineer in completing service, replacement, alterations, and new installation work

    安排電工、木工、油漆工工作日程和工程部夜班以及設備改造和新設備的安裝。
  20. Maintaining the work scheduling board up to date in order to ensure maximum utilization of productive potential, and ensure that the reception / service advisers are informed of any delays or work extensions

    保管好現行的車間調度一覽表以確保發揮車間最高的生產潛力,並確保將每一項工作的延誤或工作的延伸通知業務員。
分享友人