working procedure time 中文意思是什麼

working procedure time 解釋
工序時間
  • working : adj 1 工作的,從事勞動的。2 操作的,作業的。3 工人的。4 (用於)實際工作的,任事的;使用(中)的...
  • procedure : n. 1. 工序,過程,步驟。2. 程序,手續;方法;訴訟程序;(議會的)議事程序。3. 行為,行動,傳統的做法;(外交、軍隊等的)禮儀,禮節。4. 〈罕用語〉進行。
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  1. Accordingly, while partipants may identify such intellectual property at any time, and we encourage identification as early as possible, a “ last call ” procedure is included under which a participant must identify non - royalty - free intellectual property prior to adoption of a final specification, and within 30 days of the publication of a last call working draft

    因此,雖然關系人可以隨時確認此類的智慧財產,我們也希望盡早獲得確認,關系人仍然必須在最終規格採用時間和公布最後判定工作草案前30天內,確定非免專利智慧財產。
  2. Liquid - solid extrusion of composite material is a new kind of metal forming process, which has been developed in recent years with a promising practical application prospect for its simple working procedure, low cost and good workpiece performance. through a lot of experiments, the optimization and chosing method of key process parameters ( pouring temperature, mold warm - up temperature, impregnating pressure, impregnating time ) has been mastered. under the precondition of appropriate chosing these parameters, the effective control of extrusion velocity is the key of mading good workpiece. but the control of extrusion velocity remains a handwork, and it is heavily affected by such uncertainties as a handler ' s knowledge and skill about the process. in order to solve the problem, the automatic control of the extrusion velocity is studied, and a computer control system is also designed under existing condition

    通過大量實驗,已掌握了關鍵工藝參數(熔液澆注溫度、擠壓模預熱溫度、浸漬時間、浸漬力)的優化選取方法。在合理選取關鍵工藝參數的前提下,擠壓速度的控制是成形出質量良好製件的關鍵。但是,目前對于擠壓速度的控制仍停留在手動控制階段,利用該工藝制備管、棒材製件的成功與否受操作者對該工藝及其設備的經驗及熟練程度等不確定因素影響很大。
  3. What is the procedure in place to correctly record the working time of hourly - waged employees

    採取什麼程序以保證正確記錄計時工的工作時間?
  4. The key algorithm and idea of the production planning and dispatching based on equipment capacity and optimizing are studied by " start and complete time calculation of working procedure " and " anneal working procedure dispatch "

    以工序開完工時間計算演算法和退火工序演算法為例論述了計劃調度的關鍵演算法和基於設備能力和優先級的計劃編制思想。
  5. Lastly, in the terms of controlling the schedule and the cost, we cancelled the previous methods that time was indicated the schedule and that amount of capital invested was calculated the project schedule. we calculated the realistic project schedule by the means of the earned value that we calculated amount of capital required using the working procedure, in the meantime, we applied the analysis of the cost current curve to achieve the cost and the schedule integrated

    在進度與費用控制上,改變原來用時間表示項目進度或用完成投資額來計算項目進度的做法,用完成工序(或工作量)相應的計劃資金需求量,稱為掙值( earnedvalue ) ,來計量項目的實際進度,利用費用流曲線的分析,實現了費用與進度的聯合控制。
  6. It can automatically run in line with technical parameters, and at the same time show the operating curve and varieties of operating condition. this control system has friendly user interface, simple operating method of menu choice, and visualized method to establish technical data. it can warn and process all kinds of abnormal condition in the working procedure

    該控制系統有友好的界面,便利的菜單選擇式操作方式,直觀的填表式的設定工藝參數和顯示工藝曲線的的能力,自動運行時能顯示出運行曲線和各種運行狀態,並對各種異常情況進行報警及處理。
  7. According to the procedure of activity definition - - - activity ordering - activity time estimating - working out schedule plan - control of schedule plan, schedule plan should be established, which is used to control the whole process. in additional, project time management should be brought to objective management system

    按照項目活動界定? ?項目活動排序? ?活動時間估計? ?進度計劃編制? ?進度計劃控制的程序,制定出項目進度計劃,據此進行過程式控制制;並將項目時間管理納入目標管理體系。
  8. The main research issues consist of following aspects : 1. based on non - real - time ethernet and windows2000, we research how to meet the real - time requirement for hsm working procedure, via using shared data buffer to resolve the conflict between high - speed data acquisition and low - speed data process, then combine hsm features, correctly set priority among processes and threads, and compositively use software and hardware technical

    主要內容為: 1 .詳細研究了在採用非實時的以太網( ethernet )和windows2000操作系統基礎上,如何通過使用共享數據區緩沖、解決高速數據採集與低速數據處理分析的矛盾,結合熱連軋的工藝特點,合理設置進、線程優先級,綜合運用軟、硬體措施滿足象熱連軋生產過程這樣的快速過程的實時性要求。
  9. During the time of developing this system, the elementary operation of the ship company and the working procedure was invested. the technology method of developing the mis was studied and the method of ship mis was designed on the platform of windows nt

    在開發本系統的過程中,作者深入的了解了船務公司的基本業務類型,和數據處理流程,研究了開發管理信息系統的技術方法,並且提出了基於windowsnt平臺下開發船舶管理信息系統的設計方案。
  10. The quality control of the development control is a kind of original control and system control, and need carry out the idea of " prevention first, success one time ", and devide the development period reasonablly, the basic requirement of the quality control during the development period. the quality control during the manufacturing period must strengthen the control for purchased parts, working procedure, batch, key parts and important parts, quality check, reject parts, technical status, treating of with quality issues, etc. we must adopt check method in effect to assure that the reject products can not be taken out of the factory. we must collect and treat the quality information for the employment period, and serve the users in a good way

    研製過程的質量管理是源頭的管理、系統的管理,必須貫徹預防為主、一次成功的思想,合理地劃分研製階段,遵循研製階段質量管理的基本要求;生產過程質量管理要從外購器材的管理、工序的管理、批次的管理、關鍵件和重要件的管理、質量檢驗的管理、不合格品的管理、技術狀態的管理、質量問題的處理等方面加強控制;採取有效的驗收方法保證不合格的產品不出廠;及時收集處理使用過程的質量信息,做好為用戶服務。
  11. For instance, embranchment working procedure, embranchment point working procedure, working procedure total, working procedure and correspond process time. moreover, this thesis worked out priority area chart. it was based on successively sequence of process manufacture and principle to lessen number of one man working more machine to the best of our abilities

    從預處理過的工序分析表可以找出分支工序、分支點工序、工序總數、各工序及相應工序的加工時間等數據信息,另外根據工序加工的先後順序和盡量減少一人多機的原則,做出了優先權區域圖。
  12. Adopt at present most advanced large - scale super sap finite element structure analyse procedure to go on numerical value calculation for model of drilling rod, drilling rod whole stress simulation of state that receive show and reflect drilling rod various kinds of stresses under different working states distribute the characteristic clearly, make stress state of drilling rod reach visual, make people able to understand informations of drilling rod of stress status in depth too at the same time, so that the design of the improvement drilling rod constantly is in order to meet the demands of actual project

    採用當前最先進的大型supersap有限元結構分析程序對鉆桿的模型進行了數值計算,得到的鉆桿整體應力狀態的模擬顯示清楚地反映了鉆桿在不同工作狀態下的各種應力分佈特徵,同時也使鉆桿的應力狀態達到了可視化,使人們可以深入了解鉆桿應力狀態信息,以便不斷的改進鉆桿的設計以滿足實際工程的需要。
  13. Liquid - solid extrusion of composite material is a new kind of metal forming process, which has been developed in recent years with a promising practical application prospect for its simple working procedure, low cost and good workpiece performance. but it is difficult to set up an accurate mathematical model because the process is a multivariable nonlinear time varying system. so this process ca n ' t be put into practical uses for the difficulties in process parameters control

    復合材料管、棒材液-固擠壓成形工藝是近幾年發展起來的一種金屬成形新工藝,具有工序少、成本低、製件性能好等特點,應用前景廣闊,但該工藝是一多變量非線性時變系統,很難建立精確的數學模型,過程參數難于控制,限制了該工藝的實際應用。
  14. So chapter four and five point out the problems of these support functions. then in chapter four, the flexibility of basic data is discussed, stressing on bom management and lead - time calculation. chapter five proposes the calculation methods of working procedure plan and capacity balance, and discusses the recognition of bottle - necks

    第四章首先分析了國內mrp erp軟體在基礎數據管理上存在的難以適應多種生產類型企業需求的現狀,然後對在傳統bom管理的基礎上引入加減法生成bom和按產品配置生成bom進行了研究與探討,並提出了一種動態提前期的計算方法。
  15. Before implementing network planning, productive time of a working procedure is unknown. therefore, the paper presents two methods which judge the possibilityof a working procedure

    在網路計劃實施之前,工序作業時間是未知的,因此,本文提出二種判定工序實現可能性的方法。
  16. But it is difficult to determine the productive time of a working procedure, there is uncertainty of it. this uncertainty is random, fuzzy and intermediate uncertainty, which can be dealed by connection number method

    然而在許多情況下,估計項目活動持續時間是非常困難的,項目活動時間具有不確定性,聯系數是用來處理模糊,隨機,中介不確定性的系統理論和方法。
  17. Method 1 is based on spa method of comprehensive judgment. case ( 1 ) : several experts in this field estimate connection number of productive time of a working procedure. expression of connection number is got by method of comprehensive judgment, which considers every experts suggestion

    方法一:基於集對分析的工序作業時間綜合評價法:情況(一) :由若干名領域專家分別估計出工序作業時間的聯系數表達式,用綜合評判法得出全面考慮各名專家意見的用聯系數表達的工序作業時間。
  18. Factors which influence productive time of a working procedure, can be divided into several grades, four grades in this thesis, that is : { absolutely completion, completion, probable completion, unable completion }. corresponding elements of state sort table are adopted, that is four elements state sort table. connection number expression is found by the method of weighted value

    對影響工序作業時間的若干影響因素( f _ 1 f _ n ) ,可以根據需要將評判結果分為幾個級,比如分為{肯定完成,能完成,可能完成,不能完成}四個,那麼應採用相應元數的態勢排序表,即四元態勢排序表;然後運用加權平均法求出工序作業時間的聯系數。
  19. Modeling and algorithm research about optimization of assembly working procedure time

    裝配工序時間優化模型與演算法研究
  20. In chapter 5, to the key technique, bottle production scheduling, the way of multi - objective optimization of the fuzzy production rule system is applied. during the key working procedure scheduling, the traditional model of scheduling is ameliorated considering the adjust time

    第五章:在瓶頸列鑫產關鍵技術的研究上,採用了多工件多目標排序的模糊產生式方法;在關鍵工序計劃編制的過程中,考慮了瓶頸設備的調整時間,對傳統計劃編制的數學模型進行了改進。
分享友人