吊重梁 的英文怎麼說

中文拼音 [diàozhòngliáng]
吊重梁 英文
lifting beam
  • : hangsuspend
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. For reinforcement concrete corbel with the shear span to depth ratio ( a / ho ) less than 1, has its performance of mechanics that is close to cantilever deep beams, it is an important kind of components in architectural structure which sustains roof trusses, brackets, tray " beams, frame " beams, wall " beams and crane " beams

    剪跨比a h _ 0 1的短鋼筋混凝土牛腿,其受力性能接近於懸臂深,在建築結構中是支承屋架、屋面、托架、托架、框架、墻等的要構件。
  2. In addition to, the fatigue crack between web and upper flange of welded steel crane beam on heavy duty service was discussed, and based on long - term observation and research, the author classified fatigue crack into bearing type and middle type crack along the horizontal direction. the causation, distributive law and mechanism of the crack were analyzed, and the precautions to take and the measures to remedy crack were presented. the main defacts including damage, crack, erosion and aging in structures, especially in concrete structure were introduced ; the defact mechanism was analyzed and the precautions to take were also given

    另外,作者對級工作制焊接鋼腹板與上翼緣連接焊縫的縱向水平疲勞裂縫進行了長期的觀察和研究,根據疲勞裂縫產生的不同機理,將其分為支點裂縫和肋間裂縫,並討論了兩類裂縫產生的原因、分佈規律、機理以及防治的措施;對工程中經常遇到的結構構件,尤其混凝土構件的幾種主要病害(損傷、裂縫、腐蝕與老化)進行了機理分析並提出了防治措施。
  3. The company specializes in production of model jpkk series endless chain electric block, jkbk flexible single main beam hanged crane, rotary beam hoist, as well as all kinds of motor, carriage, control box, etc

    本公司專業生產jpkk型系列環鏈電動葫蘆、 jkbk柔性單主懸掛起機、旋臂機以及各種電機、小車、控制箱等。
  4. The jdf - 2 type case hanging basket guards against automatically falls mainly uses in the direct motor drive hoisting mechanical well type case hanging basket, as the type case hanging basket using of safekeeping of security, it installs in the hanging basket crossbeam both sides, along including guide rail is rising and falling, when the motor drive type case hanging basket in the fluctuation process, meets overweight, overspeed, steel wire attrition and other reasons creates the hoisting cable or the junction device snaps suddenly, when under hanging basket weightlessness falls, guards against falls can automatic brake, thus achieved avoids falling the basket to offend somebody

    Jdf - 2型井字架籃自動防墜器主要用於由電動機驅動的卷揚機井字架籃,作為井字架籃的安全保護之用,它安裝在籃橫的兩側,沿含著導軌升降,當由電動機驅動的井字架籃在升降過程中,遇超超速鋼絲繩磨損等原因而造成提升鋼絲繩或連接裝置突然破斷,籃失下墜時,防墜器能自動剎車,從而達到避免墜籃傷人大事故發生的目的。
  5. It is a non - propelled crane ship after conversion, operating in ports and calm waters, deploying towing in chinas coastal class ii navigational area and suitable for salvage of sunken ships, harbour construction, lifting of bridge beams sections for erection, loading unloading heavy cargoes as well as offshore oil drilling production platform and other offshore hook - up

    本船改建后為非自航固定式起船,以港口及平水區域作業為主,可在我國沿海ii類航區中調遺拖航,適用於打撈船舶港口建設橋裝裝卸大物件,以及海上石油鉆井採油平臺和其他海上弔裝工程。
  6. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于焊接鋼車樑上部區域疲勞裂縫的研究現狀;其次對整個系統的外觀情況(包括連接、裂縫、腐蝕、銹蝕、制動桿件斷裂、車啃軌等)進行了現場調查,抽樣實測了的應力、化學成分、變形及軌道偏移等,根據實測結果,對系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了焊接鋼車樑上部區域疲勞破壞的機理,分析了級工作制鋼出現疲勞裂縫的原因,制定了初軋廠精整車間破損鋼的加固方案;最後就級工作制鋼車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
  7. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文結合太鋼(集團)有限公司第二煉鋼廠主廠房由於生產工藝改造要求,加大多臺車噸位及bc跨( 1 ) ( 8 )軸線框排架各層豎向(設備)荷載后,對廠房結構,尤其鋼系統進行檢測鑒定與加固設計的實際工程,首先對廠房結構進行了現場調研、技術檢查、測試以及內力和承載能力的計算與分析(考慮抗震) ,並根據檢測、計算與分析結果,對廠房結構、構件的可靠性進行了評定,並綜合提出鑒定結論和加固處理建議。
  8. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜架設、箱裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  9. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存工程、孔道壓漿工程、體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用物移運器有效移的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  10. This ship is a non - propelled fixed luffing 500t steel crane vessel. this vessel is mainly used to lift and hookup the concrete components, bridge blocks, mechanical electrical equipments for harbours, bays, quays and jetty

    建港304為非自航固定變幅式500噸鋼質起船,主要用於中國南海沿海各港灣港口及內河碼頭和堤岸的混凝土構件橋機電設備等裝工程。
  11. Nb16 installation of segment placement gantry

    安裝中之預製件
  12. Using crane to hoist and construct bridge is characteristic of simple in constructional machines, easy in operation, low in cost, short in construction time, safety and good quality

    摘要採用起裝預制,具有施工機具簡單、易於操作、成本低、工期短、質量安全易於保證等優點。
  13. The steel - replacing - concrete construction of crane beams of a heavy factory building

    型廠房鋼混代換施工
  14. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅式雙導解決大跨度鋼箱混凝土結合橋的鋼箱架設技術難題,點闡述了施工方案,龍門、導設計,工藝要點等。
  15. There has very important practical value to study the statistic character of fatigue load on steel crane structures and of fatigue resistance on all kinds of structural joints and to analysis the fatigue reliability of structural detail, which can be used to fatigue safe control. the fatigue reliability theory and fatigue safe control applications on steel crane structures in service are studied based on the structural reliability theory in this paper. the major contents are mainly summarized as follows : 1

    研究鋼結構承受的疲勞荷載與各種構造連接的抗力統計特性,分析構造細節的疲勞可靠性,進而對其進行疲勞安全控制,對于在役鋼結構的鑒定與加固具有非常要的實用價值與指導意義:本文以結構可靠度理論為基礎,對在役鋼結構的疲勞可靠性、安全控制應用與維修加固決策進行了研究,研究的內容包括以下幾個方面。
  16. Type lxg suspension over - rail crane is specially designed for use at coal, mill in power plant, it applies to hoisting the roller spare parts of coal mill and etc, it is also suitable for use of connecting the workshop and various site where it is needed

    Lxg型電動單懸掛過軌起機是為我國大型火力發電廠輸磨煤系統而設計的專用起設備,主要用於運磨輥及其它磨煤機部件,它還適用於連跨車間以及需要懸掛過軌的各種現場。
  17. Assembly equipment and assembly method differs as span, weight and installation height of girder

    的跨度、量和安裝高度不同,適合的裝機械和裝方法亦隨之而異。
  18. This thesis discussed the design principia and desige method from the engineering point of view., and give out its own view about the selection of development of the hydropower station, layout of the underground cavern mass, selection of method for stability analysis on the surrounding rocks and support, and design of the rock anchorage crane beam. some conclusions assumed from the research and design of jiangkou power house is quite useful for all the underground hydropower station

    本文結合江口電站,從工程的角度對地下廠房的設計原則、設計點進行了詳細論述,對電站開發方式的選擇,地下洞室群的布置特點,圍巖的穩定性分析及支護方式選擇以及巖錨的設計方法進行了研究和論證。本文的觀點和結論對地下廠房工程設計有著一定的普遍意義。
  19. Leung kow kee transportation co., ltd, found in 1975, is one of the government contract transportation companies. we provide local transportation services. we are always equipped with several heavy, light vehicles and vans. the quanity of goods transported by our company can reach 100, 000 tons

    九記運輸有限公司,於1975年成立,本公司擁有多部用作貨運之車輛,專營本地各種貨物海陸運輸及型搬運,本公司常備拖頭, 30 & 24噸機及尾板貨車, 24噸& 5
分享友人