坍岸 的英文怎麼說

中文拼音 [tānàn]
坍岸 英文
bank caving
  • : 動詞(倒塌) collapse; fall; tumble; crumble down
  • : Ⅰ名詞(水邊的陸地) bank; shore; coast Ⅱ形容詞[書面語] (態度嚴峻或高傲) lofty
  1. The evaluation indicates that the collapse of the soil bank slope, falling of sliding masses into the river and surge waves in the xiangjiaba and xiluodu reservoir areas will not affect the normal operation and long - term effectiveness of the reservoirs

    評價結果表明,向家壩庫區和溪洛渡庫區土質塌及崩滑體入江和涌浪不會影響水庫的正常運行及長期效益。
  2. After heightenning dam of the middle - route water sources project of south - to - north water transfers, it is important to survey all material objects in the influential area in order to predict the area and difficulty degrees of bank caving

    摘要南水北調中線水源工程大壩加高后,丹江口庫區內的部分庫段在庫水作用下易發生坍岸問題。
  3. This paper briefly describes topography and geology conditions of the danjiangkou reservoir, and analyses the influential factors and forms of bank caving, and adopts engineering geologic analogy method to predict the influential area and difficulty degrees of bank caving on the basis of wide investigation

    為了預測水庫坍岸范圍和發生坍岸的難易程度,對丹江口水庫的地形、地質條件和坍岸的影響因素和型式進行了分析。
  4. When the first streak of day began to show we tied up to a towhead in a big bend on the illinois side, and hacked off cottonwood branches with the hatchet, and covered up the raft with them so she looked like there had been a cave - in in the bank there

    天蒙蒙亮了,我們就在靠伊利諾斯州這邊一個大灣的旁邊,找了個沙洲靠了,用斧子砍了一些楊樹枝,把木筏子遮了起來。這樣,這里看上去彷彿河在這里了一塊似的。
  5. Finally, the renovate of dong gou lock improve navigation circumstance of vessels and it will minimize ship ' s collision and cargo damage accident and it also has advantage of low cost, low pollution, environment friendly, good view of nearby circumstance and so on. shen wei ( communication transportation ) directed by. answering date : mar 28th 2002

    第三、東溝船閘改造改善了船舶運行條件,將減少過閘船舶的船損和貨損事故;將有利於充分發揮內河運輸運運量大,成本低,污染小的優勢;並能興水利、除水害、防止塌和水土流失,保護耕地,綠化環境,美化景觀,具有良好的社會效益。
  6. In the early periods, the objective of the river management is to constraint the braid river in a main channel by using construction of dikes. by control the flood could prevent from river banks flowing away

    早期河川治理,以築堤御洪為主,其主要目標在於整理網狀亂流,束范于河槽中,防止沿土地浸淹崩及流失,達到防災減災的目的。
  7. The collapsing scope of bank accumulation body of zipingpu reservoir in national highway 213 which caused by the sharply falling of water level of zipingpu reservoir is estimated according to the fem plastic zone graph

    根據有限元法得出的塑性區圖,對紫坪鋪水庫蓄水后水位驟降可能引起213國道紫坪鋪庫區庫堆積體的坡角塌范圍進行了估計。
  8. When xiaolangdi project completed and put into orperation, the inflow of water and sediment condition will be changed because of the regulation of the reservoir. especially the initial 14 years, the reservoir will hold up sediment and release clear water, which may affect the river sections in henan province, especially the wandering sections. it will result in changes of flow state and endangering the water works, because the longitudinal addend by scouring and lateral slope failure

    小浪底水庫建成運用后,通過水庫的調水調沙,改變了黃河下游的來水來沙條件,尤其是運用的前14年處于攔沙期,下泄清水,對河南河道的影響最為劇烈,對游蕩性河段的河勢變化將產生很大影響,河道縱向沖刷下切,橫向灘塌,工程出險將大量增加。
  9. Translate the following sentence into chinese, ‘ the 100 - foot - long seaside arch collapsed in 2005, under pressure from the pounding surf that formed it

    在2005年, 100英尺長的海邊拱門在使之形成的拍浪的重擊下塌了。
  10. Although the canal conduit capacity does not change very much than design discharge, the canal erosion due to many years scour already damaged the canal stability. therefore, taking efficient measures should protect the canal

    然而對于北部引嫩渠道來說,盡管大部分渠道在設計流量下輸水能力並沒有什麼明顯的損失,但渠道的橫向塌拓寬已危及堤的安全,應及時採取防治措施加以治理。
  11. Since 1950s, riverbank collapsed, river course changed, inlets and outlets of the river were silted up and the flood pile up one after another

    五十年代以來,河塌、航道變遷、引水口及出水口淤積、沿線地區洪澇災害層出不窮。