坡道蓋 的英文怎麼說
中文拼音 [pōdàogě]
坡道蓋
英文
ramp cover-
The renovation project covers more than ten jobs including road leveling, addition of road side lamps, afforestation along roads, sewage removal and pipe laying, three - dimensional rectification for street side buildings, flat - to - slope modification for street side residential buildings, tidy - up of shop signs and posts, advertisement clean - up, combination of multi - posts to one and city furniture renewal etc
改善項目涵蓋了平整道路、增設路燈、沿線綠化、截污納管、沿街建築立面整治,沿街住宅平改坡、店招店牌梳理、廣告整治、多桿合一、城市傢具更新等十多項之多。Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients
本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路護坡、橋梁、防浪堤、水庫堤壩、隧道、機場跑道、市政工程井蓋(防盜) 、礦井巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope
摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。Huangmeishan tunnel is the controlling project of maanshan - wuhu expressway, and also the 1st large span twin - arch tunnel constructed under the condition of shallow burying soft surrounding rocks in anhui province. the depth buried at the port of the tunnel is shallow, and it is covered with accumulated and disposal soil
黃梅山隧道是馬蕪(馬鞍山?蕪湖)高速公路控制工程,是安徽省在淺埋軟弱圍巖條件下修建的第一條大跨度雙連拱隧道。隧道洞口段埋深淺,且為坡積物和人工棄土覆蓋,圍巖鬆散,自承能力差。分享友人