填心板 的英文怎麼說

中文拼音 [tiánxīnbǎn]
填心板 英文
core panel
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  1. Our factory succeeds in developing the new - type lightweight solid aluminium buckle - panel through practice for many years. this kind of metal buckle - panel includes double - sided panel body with one side of the buckle - panel as the bayonet connector, another side as the bayonet, lightweight filling material inside the panel body, fireproofing material filled inside the fireproofing metal buckle panel, possessing better strength of panel body, resulted in sound insulation, heat insulating, more ideal surface luster of the heat insulation panel body and no mechanical veins, beautiful appearance and difficult deformation

    本廠經過多年實踐成功研製新型實金屬扣,此款金屬扣包括雙面的體,體的一側為卡接頭,另一側為卡口,體中間帶有輕質充物,防火金屬扣中間另注防火材料,具有更好的體強度,隔音隔熱保溫體面光澤更加理想無機械紋,外形美觀難變形。
  2. This paper applies nonlinear finite element program bsnfem to analyze the behaviors of eccentrically braced steel frames under cyclic load. the study that comprehensive and systematic analyze the factor of links length, thickness of links flange, distance of links rib, thickness of links rib and angle of brace to be changed affect energy - dissipation capacity of d shape and k shape eccentrically braced steel frames have been some studied before. this paper fills the black in the filed factor of high - span ratio, brace stiffness and brace - to - beam connections to be changed affect energy - dissipation capacity of d shape and k shape eccentrically braced steel trames and any factor to be changed affect energy - dissipation capacity of y shape eccentrically braced steel frames

    對耗能梁段的長度、耗能梁段腹的厚度、耗能梁段翼緣的厚度、耗能梁段加勁肋的間距、耗能梁段加勁肋的厚度、支撐的夾角等因素的改變對d形、 k形偏支撐鋼框架耗能的影響,前人已有一些研究,本文對這些因素的影響進行了全面系統的分析,完善了理論分析的不足;而結構高跨比、支撐剛度、支撐與梁的連接形式等因素對d形、 k形偏支撐鋼框架破壞機理的研究以及各種因素對y形偏支撐鋼框架破壞機理的影響,則很少有人涉及,本文對此也進行了深入系統的分析,補了這一研究空白。
  3. Test methods for determining the contribution to the fire resistance of structural members - applied protection to concrete filled hollow steel columns

    測定結構薄耐火性的試驗方法.防火用混凝土充的空鋼柱
  4. All backfilling of excavations must be done carefully and warning tapes, tiles, protection plates or other protection must be replaced in their original position

    挖掘工程完成後,必須小進行回工作,並且須把警告帶、磚片、蓋或其他保護物料放回原位。
  5. The main products includes various steam and electric heating reaction vessel, conduction oil, outer coil reaction vessel, polyester and resin completed equipments, vacuum reducing concentration tank, methanol and ethanol recovery tower, various corrugated stuffing, high effective membrane evaporator, new - type centrifugal drag membrane evaporator, vacuum rake dryer, condensing drum cut - off machine, shell - and - tube condenser,

    本廠主要產品有各類蒸氣電加熱反應鍋,導熱油外盤管反應鍋,聚脂樹脂全套設備,真空減壓濃縮罐,甲醇乙醇回收塔,各類波紋料,高效薄膜蒸發器,新型離式薄膜蒸發器,真空耙式乾燥機,冷凝滾筒切片機,列管式冷凝器,螺旋式換熱器,外循環蒸發器,鋁制槽車貯罐,乳化設備,高速剪切分散機,種子罐,發酵罐,多功能提取罐,並承接各類非標設備。
分享友人