壩基處理 的英文怎麼說
中文拼音 [bàjīchǔlǐ]
壩基處理
英文
treatment of dam foundation-
Hyperbola model of mgo - mixed concrete ' s autogeny deformation, especially deduce of the model ' s parameter and building process of the model are analyzed in detail. ( 2 ) calculating method of autogeny deformation and creep are discussed. based on these, timely - simulation theory of dam body ' s temperature field stress field and pre - process back - process method are mainly studied
( 2 )對mgo混凝土的自生體積變形及徐變變形的計算方法進行了探討,在此基礎上,重點研究了壩體溫度場和應力場實時模擬的原理以及前後處理方法。On the basis of the previous studies, a systematical study on the test and analysis of the atomization model is made herein based on both the prototype test and model test for jiangya dam, and then the data processing system for the atomized water particle size is developed as well ; which is a new trial carried out for the model law for the intensity of rainfall from atomization of flood - discharging flow
摘要在以往的研究成果基礎上,結合江埡大壩原、模型測試成果,對霧化模型的測試分析技術進行了系統研究,開發了霧化粒度數據處理系統,對泄洪霧化雨強的模型律進行了新的探索。The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique
化灌材料特性與理論指導下的灌漿工藝的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜工況工程處理對象成功處理,解決了三峽混凝土微細滲水裂縫防滲補強、三峽工程地質斷層泥化夾層加固以及江埡電站壩基溶蝕帶防滲等一系列工程技術難題,印證了該材料及技術的先進性。Foundation consolidation grouting treatment of xin ' anjiang dam
新安江大壩壩基固結灌漿補強處理A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved
簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒Design of earch and rockfill dams project supervision observation design data analyses. evaluation of quality and safety of dams soft foundation improvement
土石壩的設計、施工監理、原型觀測設計、資料分析及其大壩的質量和安全評價。松軟地基和壩身加固處理技術。3d numerical simulation of impact of key fault and fault enhancement on foundation rock mass of guangzhao high gravity dam
光照重力壩壩基斷層影響及處理的三維數值模擬Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project
溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。Application of arch structure in arch dam foundation treatment
拱型結構在拱壩壩基處理的應用This paper analyzes ordinary accidents and effective disposal measures of the tailing dam, introduces the engineering concrete example of high pressure jer grouting techniqe, which has been adopted by province of disposing seepage of the tailing dam in yun - nan
摘要介紹了雲南王家灘鐵礦蘆灣箐尾礦壩存在故隱患,採用高壓定噴技術構築內防滲墻,對基礎壩進行止漏和加固處理,消除隱患這一工程實際問題。During the construction of the dam foundation cut - off for dalong water control project, the construction techniques adaptable to the construction under the condition with high interference, short construction period and strict quality standard are selected through the related productive experiment, with which the problems such as the prevention and treatment of hole collapse and lowering steel reinforcement cage and pre - embedded grouting pipe into place are solved, and then the successful construction of the cut - off is guaranteed as well
摘要在大隆水利樞紐壩基防滲墻施工過程中,通過生產性試驗選擇出了適合該防滲墻工程施工干擾大、工期緊、質量標準高的要求的施工技術,解決好了孔口塌孔的預防、處理及鋼筋籠和預理灌漿管下設等技術難題,保證了該防滲墻工程的成功建設。Based on in - situ investigation, indoors soil tests, data process and calculation analysis for chunhua reservoir, this article acquires the distributing regulation and physical & mechanical properties for each layer soil below the dam base, and further determines typical model cross sections for static & dynamic stress deformation analysis
本文根據對純化水庫進行的現場勘察、室內土工試驗、室內資料處理、計算、分析獲得了壩基以下各土層的分佈規律及物理、力學性質指標,進而確定靜、動應力變形分析的典型斷面。Study on arch dam foundation treatment for shapai hydroelectric power station
沙牌水電站拱壩基礎處理研究Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc
應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙帶對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。Application of vibration percussion in treatment of the foundation of flood control emergency project in liao river
振沖法在遼干防洪應急工程壩基處理中的應用In order to meet the requirement of stability, loading and the distortion of the dam, the technique of vibration & impulsion was adopted to reinforce the overburden layer
為了確保閘壩基礎能滿足壩基穩定、承載、變形的要求,設計上採用了振沖法對覆蓋層進行加固處理。Based on the studies of the studies of predecessors, the successful practice of the application of these technologies is of the xiacouba reservoir project. in the xiacouba reservoir project, these two constructions methods are used to increase the stability of the dam and control the seepage. in this paper a systematical research have be carried out in several aspects of these technologies, such as the plan of dam reinforcement, the effectiveness of seepage controlling
論文正是在的人研究的基礎上,結合下口壩水庫工程,應用土石壩加固技術中的振沖法及高壓噴射灌漿對大壩進行了加固處理,對大壩除險加固方案、施工技術、加固效果等方面進行了較系統的分析研究。Grouting technology, as one of common and important engineering measures, has been widely used in the reinforcement treatment and anti - seepage of the dam foundation
摘要灌漿技術作為水工建築物地基處理中常用和重要的工程措施,在大壩壩基防滲和加固處理中得到廣泛的應用。Strengthening mechanism of netlon network gravel foundation and its application
限動碎石墊層在壩基處理中的應用The foundation treatment for dalong water control project mainly consists of vibro - compaction and vertical anti - seepage
摘要大隆水利樞紐工程壩基處理主要包括振沖加密和垂直防滲工程。分享友人