橋面模板 的英文怎麼說

中文拼音 [qiáomiànbǎn]
橋面模板 英文
deck form
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 橋面 : road of bridge; bridge floor; deck
  • 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
  1. Wherethe long bridge deck within 0. 5 l amidships is regarded as strengthdeck, the midship section modulus and minimum thickness of the deckplating comply with the requirements of 2. 2. 1 and 2. 4. 2. l of this ischapter

    例1 :在船中部0 . 5l區域內的長樓甲作為強力甲時,其船中剖數及最小厚度應滿足本章2 . 2 . 1及2 . 4 . 2 . 1的要求。
  2. Abstract : a model of self - excited ae rodynamic forces acting on a sectionof bridge deck with additional surface atta ched below the trailing edge is established

    文摘:首先建立了下風側附加翼梁主梁截的自激氣動力型。
  3. Before studying the concrete composite deck pavement, we introduce the basic theory of touching analysis, and come up with the realization of touching analysis in the fem analysis considering the touch of concrete bridge cover plates, asphaltum concrete overlay with bridge cover etc. connect with the experiment on the spot of bridge, the software ansys is used to solidity modeling and analyzing an assembly simply supported bridge before adding overlap, after adding overlap etc., and study the influence of adding overlap on the underside bridge structures

    在進行裝配式混凝土簡支復合鋪裝結構的探討性研究前,先介紹了接觸分析基本理論,並提出了考慮混凝土間接觸、瀝青混凝土加鋪層與接觸等接觸分析在有限元分析中的實現思路。結合一座裝配式簡支現場試驗數據,採用ansys對該在加鋪前後進行了實體建與計算分析,討論了瀝青混凝土加鋪層對下部結構物的影響。
  4. First, the open - ending of chinese offers all - direction gaps ; then the vagueness leaves enough scope for furthering research ; the elements of this subject paves a springboard. the synthesis of chinese constructs a bridge for it. the period of fashion inserts fresh air into the research study. the key point of this essay is the implementation of strategies of teaching and learning into the chinese teaching by the method of research study

    語文學科的開放性,為研究性學習提供了多向性介;語文學科的糊性,為研究性學習留下了深入鉆研的餘地;語文學科的基礎性,為研究性學習鋪設了跳;語文學科的綜合性,為研究性學習搭建了梁;語文學科的時代性,為研究性學習注入了活水。
  5. Construct a three dimensional space finite element analysis model for the steel mix joint part of road bridge surface, study the distribution complexion of strain field in the steel combine part, and judge its endurance and safety capabilities

    對公路鋼混結合部位,建立三維空間有限元分析型,研究鋼混結合部位的應力場的分佈情況,評判該部位的受力性能及安全性能。
  6. The authors describe the modelling of a railway steel truss bridge with long - span in order to analyse the detailed distribution of stress for members and nodal plates in main truss, the detailed deformation and stress distribution due to frame effect on transversal bracing plane in truss bridge, and the detailed distribution of stress in important parts of the steel plate girder bridge with initially transversal deformation by using sseb in this article

    本文建立大跨鐵路鋼桁梁和鋼結構擬分析數學型,說明了鋼桁梁桿件和節點詳細應力分佈、平框架詳細變形與應力分佈和有變形缺陷鋼重要部位應力的擬分析結果等問題。
  7. In these thesis, on the basis of existing data collected of arch bridges and dynamics, simply introduce the development and application of the analytical method and finite element numerical analysis method of arch bridges. taking the example of pubugou cfst arch bridge, establish 3 - d finite element model of it with software ansys, and analyze its natural vibration. the effects on inherent vibration of the differences of structure parameters, the restriction of the deck and the effects of different arrangements of cross braces are analyzed

    本文在收集有關拱及動力學資料的基礎上,分析了拱動力學的解析分析法和有限元數值分析方法的優缺點,同時以瀑布溝大為背景,使用ansys軟體建立了空間有限元型,實施了跨結構的自振特性分析;並分析了考慮到型簡化過程中部分結構參數取值差異、的約束狀況不同等因數對自振特性結果的影響;此外還對上的橫撐布置不同導致對自振特性的影響作了分析。
  8. All the researched results prove the era method is steady and suitable for those structures : spacecraft 、 beam - plane structure 、 truss structure 、 frame 、 bridge, etc. on the basis of the consideration of the above, the major job of the article is to discuss how to identify the parameters of the long - span structure with the method of era under the action of the wind loads

    但是,國內外已有的相關文獻,對于下的結構均進行了相關的研究,如航天器、梁結構、桁架、框架、梁等。基於以上考慮,本文主要工作,就是探討在風激勵荷載作用下,如何用era演算法識別大跨空間網格屋蓋結構的態參數。
  9. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入;拆裝式和液壓式兩種的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底、后腹、再頂的施工順序和斜向分段、腹水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  10. Grillage girder is always used for analysis the structures, such as dense ribbed slab, superstructure of bridge and grid - mat foundation. in this paper, a mechanical model for grillage girder by elastic supporting is proposed, and used for analysis the track structure for the first

    交叉梁系一般用於求解密肋式屋樑上部結構和格式基礎等結構,本文提出一種彈性支承交叉梁系型,並首次用其求解軌道結構。
  11. The author advances that the shear connector is simulated by two spring elements, which are vertical to each other and parallel to the interface between steel and concrete, and one multipoint constraint element, mpc element, which is vertical to the interface. the author also puts forward that the crack of the deck is simulated by the gap element which ca n ' t support longitudinal tensile force but can support longitudinal compressive force

    提出了以正交的兩個平行於鋼和混凝土界的彈簧單元及一個垂直於界的多點約束( mpc )單元來擬剪力鍵,以小間隙接觸( gap )單元來擬混凝土的開裂,型中忽略了混凝土與鋼梁接觸間由摩阻而產生的粘著力。
  12. In allusion to section modality and transverse joint of common span bridges, we choose two kinds of calculating theories in transverse distributing calculate process : the theory of rigidity crossbeam and the theory of hinged girder and slab. making the use of the theory of optimized design, i constitute mathematics model and choose appropriate calculated method. and find the form and detail dimension of section when beams of the bridge satisfy bending moment ^ shearing force and torsional moment

    在用橫向分佈理論計算單梁扭矩過程中,針對現有常用跨徑梁的截形式和橫向連接狀況,選取了兩種計算理論:剛性橫梁法和鉸接梁()法,利用結構優化設計原理,建立主梁承載力的數學型,選擇合適的優化計算方法,得出在滿足彎剪扭承載力要求時主梁的細部尺寸。
  13. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大高樁承臺吊箱圍堰的全結構型,相對準確地擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍堰計算變形和施工實測變形,結果是吻合的;對大遼河特大高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  14. On the basis of relative researches in the world, according to the study status of steel - concrete composite slab, which would be widely used in modern bridge, modified equivalent inflexibility of steel - concrete composite slab was deduced by use of conversion section principle in this paper ; based in this, this paper put forwards the theory of ultimate flexural capacity of steel - concrete composite slab in consideration of slip effect, and introduces the practical simplified method for calculating flexural deformation of steel - concrete composite slab in consideration of the effect of steel studs and welded wire, and conclude that the methods in this paper is veracious and reliable, comparing with the traditional calculating mode ; morever, this paper put forwards the calculating theory and program of the effect analysis of creep and shrinkage to steel - concrete composite slab, using conversion elastic modulus principle, and testifies that the theory is right and the program is reliable and practical

    本文在國內外研究成果的基礎上,針對壓型鋼與混凝土組合結構在現代梁建設中廣泛應用前景和研究現狀,利用換算截法導出了壓型鋼與混凝土組合結構的修正等效慣性矩;在此基礎上,又推出了考慮壓型鋼與混凝土之間的相對粘結滑移影響的壓型鋼與混凝土組合結構極限抗彎承載能力計算理論,並介紹了考慮栓釘、聯結件影響的壓型鋼與混凝土組合結構簡化實用撓曲變形計算公式,而且通過與傳統計算理論的分析比較,表明本文提出的計算理論公式的準確可靠性;此外,採用換算彈性量比法著重提出了壓型鋼與混凝土組合結構的徐變、收縮效應分析的計算理論和程序,並通過實例分析計算證明了理論的正確性、程序的可靠性和實用性。
  15. During construction procedure, the stressing of diaphragm beams " tendons and the tensioning of cables interact, the contacting nonlinear issues between girder and form plate etc, which require detailed analysis, arrange the orders and quantities of the stressing of the cables and tendons properly, and guide the construction. the paper, by making plane model and spacial model of yongan bridge, calculated the pre - closure cable forces ( aim forces ) with plane element program, with the help of applied structure analysis program - ansys, acquired the reasonable construction steps of tensioning of tendons and cables

    本論文採用自編平桿系施工裝配計算程序和大型結構分析程序- ansys ,通過分別建立該的平和空間型(含的作用擬) ,由平桿系程序倒拆出斜拉索合攏前的索力(目標索力) ,利用ansys結構分析程序,經過多次的施工過程擬計算之後得出達到目標索力的合理的施工步驟。
  16. Based on the model of for the first time, the coupled model of csbcs and soil considering the interaction between them was established in this paper, in which csbcs was simplified into the arch structure with fixed support and problem of plane strain

    本文按照耶梅里楊諾夫型的思路,首次建立了波紋鋼涵和土的耦合作用型,將波紋鋼涵簡化為固支拱結構,按平應變問題進行計算。
  17. In this paper, a two - dimensional analysis of the tanjialiangzi bridge was first performed ; then a segment of the bridge was modeled and a three - dimensional analysis of it were carried out by employing the fem software of ansys ; after a careful analysis of the result of the calculations, the causes of the diagonal cracking in the web of the beam were given out ; and also, in the last part, common steps of damage evaluation of the long - span pc continuous bridges through fem software were summarized

    本文首先對譚家梁子大作平計算分析;然後運用ansys軟體建立該局部梁段的空間有限元型,並在此基礎上進行空間局部有限元分析;通過對計算結果的整理和分析,從設計方探討了該斜裂縫產生的原因:此後,針對病害成因,本文提出了裂縫修補和腹加固的方法;最後總結了運用有限元軟體分析同類梁病害的一般方法。
  18. During the finite element modeling of the bridge, the factors affecting the accuracy of the finite element model are discussed in detail, such as, the geometrical non - linearity of the cable including gravitational sag and initial tension, and the structural orthotropic steel box - girder deck to be equivalent to physical orthotropic deck by using compound material mechanics, and so on

    在建過程中,盡可能多地考慮了一些影響全有限元型精度的因素:如斜拉索的幾何非線性(重力垂度和初始應力) ,將構造正交各向異性鋼箱梁用復合材料力學的方法等效為物理正交各向異性等。
  19. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截,且為高空作業,給工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
  20. Based on the achievements done by others and the feature of superstructures, we establish the segment models under the different loads for the fem calculating of the deck and make it for the final conclusion that the distribution of the stresses in the deck of this main girder are uniform

    本文結合已有的研究成果以及金馬大系的結構特點,通過建立主梁的有限元節段型,並分工況計算的正應力分佈情況。計算結果表明,肋式斜拉主梁的正應力分佈是比較均勻的。
分享友人