壩殼 的英文怎麼說

中文拼音 []
壩殼 英文
dam shell
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑坡、泥石流引起的堆積物和冰川作用形成的冰磧物堵塞河道,再加上構造運動造成地的不均勻抬升,九寨溝的這種獨特的地質環境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終形成灰華堤,使湖泊的形成成為可能。
  2. Hada mountain embankment dam is located at strong motion earthquake area with 7 degree. it is a sand - fill dam with clay core, stability of the dam under earthquake and the preventive of foundation liquescence is very important for the dam design

    哈達山土是位於七度地震區,坐落在厚覆蓋層上的粘土心墻砂體的抗震穩定、基礎的抗震液化是本工程的技術關鍵問題。
  3. Design and study of gaobazhou hydropower station ' s prestressing force reinforcing bar concrete snail casing structure

    洲水電站預應力鋼筋混凝土蝸結構設計與研究
  4. Arch dam, which is fastened to the base rock, is a high _ order, hyperstatic, spacial body case structure. it has not only arch function but also girder function, but its main loads are passed to each dam abutment by means of arch function

    是固結于基巖的高次超靜定空間體結構,既有拱作用又有梁作用,其主要荷載是通過拱的作用傳到兩岸肩。
  5. The dislocation interfaces, which have different directions, different combinations, different scale, different deformation strength and different properties, are belonged to shallow structure. they are the products of multi - stages, multi - periods and multi - causes of movement during the himalayan epoch. they were controlled by and resulted from 2 structural stress fields of ne structure and nw structure

    由此認識到,區發育的不同方向、不同形態和組合型式、不同規模、不同變形強度和不同性質的錯動帶屬于地淺部構造層次,是本區喜馬拉雅運動多期次、多階段、多成因的構造產物,分屬于區域上ne向構造帶和nw向構造帶的構造成分,並受控于這兩期構造的構造應力場。
  6. Application of the concrete shell weir in reconstruction of two flood destructed dams in zhupan

    在洙盤兩座水毀大修復中的應用
  7. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸打壓、廠間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  8. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸打壓、廠間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  9. It is a particularly suitable method for shell dams.

    這是一種對特別適用的方法。
  10. Analyses of the monitored seepage data of the sand case dam with clay core of jilihe reservoir show that the impervious effect of the clay core is good, that the blanket in the front of the dam has little impervious effect, and that seepage failure will probably take place because of the weak cutoff groove and the large seepage gradient

    摘要對吉利河水庫粘土心?砂的滲流觀測資料分析表明,該粘土心?的防滲效果較好,但前鋪蓋沒起到防滲作用,且截滲槽較薄弱,滲透比降較大,可能發生滲透破壞。
  11. The gravelly soil is a better kind of damming material. it ' s usually used as impervious core and also as dam shell

    礫質上是一種良好的築材料,既能作防滲材料,又能填築壩殼
  12. 2 ) duncan e - u model is applied to the material of the dam. the feasibility of using duncan model is discussed. the duncan e ~ u model which considers the creep character of asphaltic concrete is adopted

    壩殼材料選用鄧肯e -模型;討論瀝青混凝土心墻材料選用鄧肯模型的可行性,最終採用考慮瀝青混凝土蠕變特性的改進鄧肯模型。
分享友人