壩的位置 的英文怎麼說

中文拼音 [dewèizhì]
壩的位置 英文
dam location
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  1. The studying on the mechanism of beiyin main channel gliding slope heilongjiang beiyin project lies in the west of heilongjiang which lies the center of nenjiang. geographical location is east longitude 124 - 126 ? and north latitude 46 - 48 ?. aims of the project are providing water to petrol and chemical industry of daqing and living water. at the same time it is also a big comprehensive conducting water project without dam which resolves 24 irrigation regions of beiyin using water along beiyin

    黑龍江省北部引嫩工程於黑龍江省西部,地處嫩江中游左岸松嫩平原腹地,地理在東經126度128度,北緯46度48度之間。該工程以滿足大慶石油和化工生活用水為主,同時解決沿途24個分灌渠用水綜合性大型無引水工程。
  2. From the site explorations, tentative sketches can be made of the dam location and project features such as power plants.

    通過址查勘,就能繪制壩的位置和工程附屬建築物如發電廠方示意圖。
  3. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,水庫產生泥沙異重流機率較大,能否運動到前排出庫外,還要看異重流潛入點、入庫流量、洪峰歷時、入庫含沙量、水庫閘門運用等因素,需要做好異重流預報監測工作。
  4. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石基處理和防滲原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部採用混凝土塞,其它部採用半透水料換,並根據本工程特點在下游腳加設了反濾層.為提高整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工,運行情況良好,可為面板堆石設計和研究提供參考與借鑒
  5. Because of the complexity of calculation result data, and in order to simplify the analysis of results, this paper only provides annual temperature isoline map of february, may, august and november during construction, temperature isoline map of the first, fifth, tenth, twentieth and thirtieth year during operation, duration curve of temperature and stress of typical point at different elevation, the maximal stress distribution along dam height, point at different elevation, the maximal stress distribution along dam height, and the maximal and minimal temperature and the maximal tensive stress and its position of every month

    因計算結果數據量非常大,為便於成果分析,本文僅給出施工期每年2 、 5 、 8 、 11月份和運行期第1 、 5 、 10 、 20 、 30年溫度等值線圖,體不同高程典型點溫度和應力歷時曲線圖,最大應力沿高分布圖,逐月最高、最低溫度和最大拉應力值及相應等。
  6. The characteristics of temperature distribution in vertical and horizontal directions and the conductance distribution in horizontal direction in an earth dam were analyzed, and the locations, distribution characteristics, ranges, and leakage rate of main leakage passages of the dam were calculated by use of the virtual heat - source method presented in this paper, the result of study provides a scientific basis for dam leakage control

    分析某貯灰場土垂向和水平溫度分佈特徵、電導水平分佈特徵,並利用滲漏探測虛擬熱源法模型,計算出該土集中滲漏通道空間、展布特點、范圍大小和滲漏強度,為堤滲漏治理提供科學依據。
  7. Trough the analysis of stabilization safety on tengzigou arch dam, some conclusions are obtained in the following : ( 1 ) tengzigou arch dam is safe under normal poll level ; ( 2 ) stabilization safety factor of tengzigou arch dam is about 4 - 5 ; ( 3 ) it is proved that combinatorial reinforcement measures are effective and feasible

    對藤子溝拱數值計算和模型試驗分析表明: ( 1 )藤子溝水電站在正常蓄水作用下,體和兩岸肩是穩定; ( 2 )藤子溝拱整體安全度大概為4 5左右; ( 3 )東北院提出對左岸泥巖層挖除處理並用混凝土加固除險措施經研究表明該加固措施是有效、可行
  8. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,閘墩河海大學博士論文存在抬高了水面線,其中在閘墩頭部尤其明顯;墩型對流量系數和面壓力影響較大, 3a型閘墩相對於2型閘墩具有更大流量系數和更小面壓力:不同墩厚閘寬比t / b對泄流能力也將產生顯著影響,隨著墩厚閘寬比增加,面壓力降低,而當t / b二0 . 2時溢流具有更大流量系數。
  9. A mathematic model is first introduced for optimizing the layout of flood - release structures in a high arch dam after an idea of the broad sense of construction costs for unit area gate is introduced, and the optimal computation of the layout of flood - release structures in xiao - wan arch dam demonstrates that this model is reasonable ; 4

    在引入了閘門廣義單面積造價基礎上,首次建立了高拱身泄洪建築物布數學優化模型,並通過對小灣拱身泄洪孔口優化布計算,說明所提出數學優化模型是可用; 4
  10. The participants will run along sai kung man yee road to the east dam of high island reservoir where they will return and finish the race at the junction of sai kung man yee road and sai kung sai wan road

    參加者將會沿西貢萬宜路跑向萬宜水庫東,再折回跑至於西貢萬宜路與西貢西灣路交界終點
  11. In case a non - navigable stream or man - made waterway becomes navigable after a dam or sluice gate structure is built, the construction unit shall simultaneously build ship passage facilities or reserve sites for such facilities, and the expenses needed thereby incurred shall be borne by the communication departments concerned, unless there are other state - provisions applicable

    在不通航河流或者人工水道上修建閘后可以通航,閘建設單應當同時修建過船設施或者預留過船設施,所需費用除國家另有規定外,由交通部門負擔。
  12. Even if the same genetic face, the velocity is very different because of different location. for example, the velocity of the vicinity and beyond of estuary bar is respectively 238. 33mm / ka and 0. 89 mm / ka. the paper has also related the deposital velocity of delta with quite deep lake of eogene of jiyang basin and the okinawa trough of quaternary and contemporarily shore

    即使是同一成因相,其所處不同,沉積速率也有較大差距,如分流河口(近端)與分流河口(遠端)沉積速率分別為238 . 33mm / ka和0 . 89mm / ka 。
  13. In the paper the initial iocation and dimension of step are studied from which we get the conclusion tha the energy dissipation is highcr if the initial location is at the curve section of l / 2 height of the spillway top and the dimension gap of neighbor step is bigger, the energy dissipation is higher

    通過對階梯溢流過渡階梯起始和具體尺寸試驗研究。得出過渡階梯最佳起始約在頂曲線段1 2高度處且相鄰階梯尺寸相差較大時,所得消能率較高。
  14. The selection of impoundment level and dam site, the general layout, the design optimization of structures, construction diversion and construction period all are the important context of the design of hydropower station across river with low head

    蓄水選擇、址選擇、樞紐布、建築物設計優化、施工導流與工期等是低水頭河床式電站設計重要內容。
  15. Test results show that spur dikes aligned along a single bank in the deep water zone have more effects on the adjustment of the bed topography of the wide - shallow river than in the shallow water zone ; alignment of spur dikes along both banks can effectively adjust the planimetric position of deep - water zone ; and a reasonable widening rate of the regulation line in the estuary can readjust the variation of the average water depth along the river

    試驗結果表明,在深水區單側丁群對寬淺河床地形調整作用大於淺水區;雙側丁聯合作用能調整深水區平面;合理地選擇治導線放寬率,能有效地調整深槽平均水深沿程變化。
  16. Since bashang lies in the upper wind and water of beijing and tianjing, the development of the reclamation of arable land for reforestation has been special role which improves the ecological environment of beijing and tianjing

    河北省上地處京津上風上水,本地區退耕還林工程開展,對于改善京津生態環境具有不可替代特殊作用。
  17. Xianghongdian concrete gravity - arch dam was analyzed using numerical simulation in this paper. in different place of dam crack with different stripe and various depth was simulated and corresponding vibration frequency and shape were given. the frequency of damaged dam polluted by noise was also discussed and the results were presented using statistical neural network to identify

    本文對響洪甸重力拱進行數值模擬分析,在大不同模擬了條數不等、張開度不同各種裂縫,並給出了相應振動頻率和振型,考慮了測試噪聲影響,並用統計神經網路進行了識別。
  18. The disadvantage is that small variations in coastlines such as bays and inlets cannot be resolved. the bay model complements the first by using a very fine grid to resolve those geographic features such as bays and inlets at which storm surge observations are absent and where storm surge information is required as design parameters for coastal structures such as embankments

    而港灣風暴潮模式覆蓋范圍較小,這模式利用一套非常密集網格點來計算出例如港灣和河口等地理風暴潮資料以補開闊海岸模式不足。當建設沿岸工程如堤等需要參考港灣和河口風暴潮資料而又沒有這些紀錄時,這套模式便派上用場。
  19. The result indicates that under the condition of temperature sudden drop, the temperature of face slab ' s surface and centre will fall consecutively along with the temperature sudden drop, and the face slab ' s surface temperature drop - cut range will reach maximum ; under this condition, the tensile stress appears in the face slab ' s surface and centre, the maximum principal stress in the face slab ' s surface is larger titan that in the face slab ' s center ; the maximum principal stress in the face slab ' s surface and centre both occurs in the position that the elevation equals approximately to half of the dam ' s height

    結果表明,在氣溫驟降條件下,面板表面及中心溫度將隨氣溫驟降發生而持續降低,其中面板表面溫度降幅最大;此時面板表面和中心均出現拉應力,面板表面最大主應力大於面板中心最大主應力;面板表面和中心最大主應力均發生在高程約為高一半
  20. In the practice application, the project ? the large dam secure supervising and measuring system of taipu brake, which the penman participated himself, is introduced in detail, which includes the system synopsis, the definition of the pressure, the crack, the horizontal displacement and the vertical displacement, the compare of diversified measuring methods, the choice of the instruments and the configuration of the instruments, the system network topology configuration, the collocation of various metrical dots and instruments " demarcating and testing, the system software and the application software, the communications between the intelligent instruments and the primary interfaces of actual system

    在實踐應用方面,詳細介紹了筆者親自參與實施工程? ?太浦閘大安全監測系統,包括系統簡介,揚壓力、裂縫、水平移和垂直定義,各種測量方法比較,儀器選型以及儀器結構,系統網路拓撲結構,各測點以及儀器標定測試,系統軟體和應用軟體,智能儀器與上通信,實際系統主要界面。為了論文完整性,介紹了大安全監測專家系統。
分享友人