壩的水高度 的英文怎麼說

中文拼音 [deshuǐgāo]
壩的水高度 英文
dam lift
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 4次方是 The fourth power of 2 is direction
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 高度 : altitudeheightelevation
  1. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出場和徐變應力場模擬模型理論,編制了碾壓混凝土三維有限元模擬計算程序,在程序中考慮了各種溫控措施數值模擬,包括:管冷卻、冬季保溫、降低混凝土澆築溫、夏季混凝土表面噴霧、施工汛期頂面過等。
  2. The effect of groyne length and layout on water surface is analyzed in the paper. based on the results of simulation and experiment, the local energy loss of the flow due to the groyne is studied. consequently the surface variation and height of damming are also analyzed

    論文分析了丁與布置對面線影響,根據流場、紊動場模擬結果和實驗結果研abstract究丁造成流局部能量損失,並對面變化和丁進行了分析。
  3. The excavation on the left side of xiangjiaba hydropower plant would form the large - scale artificial slope, which refers to the main project near the source of the river and the project of intake sea - route near the mouth of the river, and its height would reach 150 meters

    向家電站左岸開挖將形成規模較大人工邊坡,涉及上游段主體工程和下游段引航道工程,工程邊坡達150m 。
  4. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用流沖毛技術,大大提了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提體混凝土成型質量和工程進;在二期混凝土施工區域,為免除人工鑿毛勞動強,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提了接頭強和鋼筋連接速,施工安全性大大加強,質量穩定性有效提,經濟成本大大降低;三峽二期工程持續混凝土施工系統工程研究,使三峽工程成為名符其實「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術應用,有效降低了體混凝土溫產生;混凝土表面處理及裂縫處理技術應用,提了建築物整體性和耐久性。
  5. Three - gorges ship lift structure is one of important navigation facilities in the three - gorges projects. as far as its scale for navigation, its lifted weight and height are concerned, the ship lift structure is the greatest one in the world. in this paper taking the ship lift structure as background, the principle of mr adaptive reduced vibration control system is proposed to solve the problem of seismic whipping effect of the top machinery building of ship lift structure

    三峽大升船機是三峽利樞紐工程中重要通航設施之一。就其通航規模、提升重量及而言,均屬國內外已建、在建升船機之首位。本文以該大型升船機為工程背景,對升船機頂部廠房地震鞭梢效應問題提出了磁流變智能自適應減震控制原理、設計方法和效果分析。
  6. This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project

    本文通過對利樞紐工程項目實施研究,論證了利樞紐工程項目在技術上是可行,在經濟上是合理,在外部環境方面符合國家宏觀政策;闡述了利樞紐工程設計過程全面管理,充分論證了設計方案選擇及設計質量低,直接關繫到工程項目投資、質量和工程進控制好壞;闡述了利樞紐工程施工過程全面管理,論述了監理在施工過程中管理程序和方法,施工單位遵循一定監理程序,依據施工合同科學合理地完成施工任務;闡述了利樞紐物質設備采購管理,通過對采購合同內容論述,明確了物質設備采購時應注意問題;闡述了利樞紐工程項目驗收及后評價,明確了利樞紐工程項目竣工驗收內容;較全面地闡述了利樞紐工程項目實施綜合管理,重點研究了保證利樞紐工程項目順利實施信息管理、溝通管理、沖突管理和風險管理。
  7. The dam protected height is determined as 15m higher above reservoir water level during initial reservoir impounding period in order to preventing surge damage caused by landslide

    李家峽電站前號滑坡屬有蠕滑活動老滑坡,體積為1845 104m ~ ,為預防滑坡涌浪危害,初期蓄期間前設防15m 。
  8. Jahezi reservoir is located at the northwest arid area of china, the primary tasks of which are flood control land irrigation. it has been reinforced in 2003 so the discharge capacity and the safety of dam were increasing at large degree, which created the conditions to utilize the flood sufficiently by raising the limited water level

    夾河子庫地處我國西北乾旱區,主要承擔防洪及灌溉任務, 2003年除險加固完成後,泄流能力及大安全都有很大程,為庫抬汛限位,實現洪資源化創造了條件。
  9. Based on several actual cases, the temperature control measures for roller compacted concrete ( rcc ) gravity dam and arch dam such as structural jointing for construction ; lowering of concrete placing temperature ; water pipe cooling ; surface insulation ; inclined - layer placing etc., the measures to improve the material properties i. e. the application of micro - expanding concrete ; enhancement of material crack - resistance property and the requirement for the simulative analysis on both the temperature field and stress field as well as some problems concerned are summarized herein on the basis of the analysis on the material properties ; construction characteristics and the changing characteristics of the thermal stress of roller compacted concrete

    摘要從碾壓混凝土材料特性、施工特點、溫場溫應力變化特點入手,結合幾個工程總結了碾壓混凝土重力、拱分縫方式,降低澆築溫管冷卻、表面保溫、施斜層碾壓等溫控措施,採用微膨脹混凝土、提材料抗裂性能等改善材料性能措施及碾壓混凝土溫場、應力場模擬分析要求和應注意問題。
  10. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程河床覆蓋層深最深達147 . 95m ,是近兩倍左右,滲流和液化成為體安全主要問題,本文對該三種設計方案即平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案靜態應力位移及體在竣工期、蓄期等各個階段可能產生破壞進行了認真研究。
  11. In the light of the study result that the energy dissipation ratio is higher as the spillway slope is gentle, to applied stepped spillway to overflow earth - rock dams with a certain height is proposed

    根據坡較緩時,階梯消能率較研究成果,提出把階梯溢流應用於一定土石
  12. Under the consideration of the engineering geological condition of dahuashui hydropower station, the pre - splitting blasting technology and reasonable construction method are adopted for the excavation of the dam foundation in accordance with the analysis on the rock strata therein, in which the design of the blasting parameters and powder charging structure as well as the angle control and the height of the excavating steps are particularly determined, and then better splitting effect is got for the slope excavation and the quality requirement of the construction is satisfied as well

    摘要結合大花電站大工程地質條件,通過分析巖層具體情況,採用預裂爆破施工技術,合理施工方法進行基開挖,並對爆破參數和裝藥結構設計,鉆孔控制和梯段精心確定,使該邊坡開挖預裂取得良好效果,保證了基開挖質量要求。
  13. The first is the influence on flood controlling, the second is the influence on hydro power, the third is the influence on water resources, navigation, and ecological environment downstream of dan jiang kou

    丹江口庫不加調對丹江口樞紐及其下游地區主要有三個方面影響: 1對防洪調影響; 2對發電影響; 3
  14. The earth dam had in the past usually been under severe impact during violent earthquakes. the rockfill dam with clay core in mania multi - purpose water project is constructed in high intensified areas, it is therefore imperative to have a thorough knowledge about the earthquake resistance of the dam

    以往土石在強震中曾遭受過嚴重震害,滿拉利樞紐工程土心墻堆石建立在土石,因此,了解和掌握滿拉大抗震性能是非常必要
  15. On the basis of a full investigation and study and an integrated analysis of the geological setting and rock - mass mechanical environment of the bank slopes of the hydroelectric project area on the mainstream of the jinsha river and by combining the qualitative analysis with the quantitative evaluation, the authors calculated the instability of the sliding masses according to 1 / 8 and 1 / 11 of the total cubic capacity of the materials falling into the river and the surge wave heights at the falling sites as well as at the xiangjiaba and xiluodu dam sites and in adjacent townships according to the calculation method of the surge wave diagram given by the american society of civil engineers, made the risk evaluation of the bank slope instability with respect to the operation safety at the dam, safety of the cities and townships around the reservoir and safety of the reservoir operation, and put forward precautionary measures for bank slope instability

    摘要筆者通過調查研究和綜合分析金沙江幹流電工程區岸坡地質背景和巖體力學環境條件,定性分析與定量評價相結合,採用與三峽工程庫區岸坡失穩危險性評價相類比方法,針對崩滑體失穩按總體積1 / 8和1 / 11入江方量進行了計算和按美國土木工程學會涌浪圖解計演算法計算了入點及在向家址、溪洛渡址和鄰近城鎮涌浪,並圍繞大施工安全、庫區周邊城鎮安全,庫運營安全等方面對岸坡失穩危險性進行了評價預測,提出了岸坡失穩防治對策。
  16. Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province. the height of dam is 292 m, and its installed capacity is 4, 200, 000 kilowatt, so it ' s a large - scale water - power engineering. the height of excavation reach to 80 m. so it is sure, that the excavation will influence on the stability of the slop. the stability of the slop is the necessary condition to assure the trouble - free operation of the station

    雲南省瀾滄江小灣電站位於雲南省南澗縣和風慶縣交界處,最大擬建292m ,裝機容量420萬千瓦,屬特大型電工程。左岸砂石系統邊坡位於瀾滄江左岸8 ~ #山樑,主體開挖達80m ,開挖對邊坡穩定性產生很大影響。該邊坡穩定性對電工程建設順利進行。
  17. In view of the seepage hazards existent in the homogeneous soil dam in landong reservoir and on the basis of physical property of the media and geophysical characteristics of the study area, the authors reasonably selected such geophysical techniques as high - density resistivity, ground penetrating radar, transient rayleigh wave and spontaneous polarization to make integrated exploration and find out the seepage path of water sources, thus providing grounds for evaluating stability of the dam body and designing the reinforcement plan

    摘要針對藍洞庫均質大出現散滲等病險,根據區內各介質物理性質及地球物理特徵,合理選擇了電阻率、探地雷達、瞬態瑞雷波和自然電場4種物探方法進行綜合勘查,查明病險源來向,為評估穩定性和加固處理設計提供依據。
  18. Abstract : in view of the seepage hazards existent in the homogeneous soil dam in landong reservoir and on the basis of physical property of the media and geophysical characteristics of the study area, the authors reasonably selected such geophysical techniques as high - density resistivity, ground penetrating radar, transient rayleigh wave and spontaneous polarization to make integrated exploration and find out the seepage path of water sources, thus providing grounds for evaluating stability of the dam body and designing the reinforcement plan

    文摘:針對藍洞庫均質大出現散滲等病險,根據區內各介質物理性質及地球物理特徵,合理選擇了電阻率、探地雷達、瞬態瑞雷波和自然電場4種物探方法進行綜合勘查,查明病險源來向,為評估穩定性和加固處理設計提供依據。
  19. Based on the fem model of the dam - reservoir system, the influence of water compressibility to the hydrodynamics is systemically analyzed and researched. it is showed thaf the water compressibility has significant effect to the size and distributing of hydrodynamics on the high dam, and the absorbency of reservoir bottom has a role as a damper on the dam - reservoir system

    基於庫體各類邊界條件有限元模型,系統分析了可壓縮性對體動力響應影響,表明可壓縮性對壓力強和分佈具有顯著影響,而庫底邊界條件對大地震反應有抑制作用。
  20. In the end, the main dam of huangbi - zhuang reservoir is analyzed with the program built in this paper and some reasonable conclusions are drawn about it. there are also some availability suggestions proposed to estimating and inspecting the earth dams and the problems that to be further studied are presented

    由此得出結論,用有限元方法分析均質土滲流、評估已建工建築物,具有方便、快捷優點,同時所得結果可信,是一種可行方案,最後,提出了一些關于土評估方面建議和有待解決問題。
分享友人