壩的穩定性 的英文怎麼說

中文拼音 [dewěndìngxìng]
壩的穩定性 英文
dam stability
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 4次方是 The fourth power of 2 is direction
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • 穩定性 : antiwhip
  • 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
  1. The thesis built the relation between containing water and the properties of trail dam ' s soil by geomechanical properties of trail dam ' s soil ; analysed the seep rule of water in the trail dam ' s field and the change of soakage line. the thesis applied the limited element to analyze the trail dam of baogang by the engineering item in production. it calculates the dynamic and static response about the dam using the numerical simulation method

    本文通過大量尾礦土物理力學質試驗資料,建立了含水量與尾礦土質之間關系曲線;分析了水在尾礦滲流規律和不同標高時浸潤線變化情況,為分析尾礦壩的穩定性提供依據;結合生產上工程項目,從包鋼尾礦壩的穩定性研究入手,應用有限元法,通過數值模擬分析了水對尾礦靜力、動力影響。
  2. This article described the deformation features of taojiaba landslide and analyzed the inner factors, geologic setting, topography, morphology, stratum, lithology and texture, and the external influence factors, precipitation, flood, human activity, neotectonic activity and earthquake, and the transform features of landslide in the near future, and evaluate stability of landslide through the section coefficient method calculation on basis for landslide mechanism analysis and control work

    摘要陶家滑坡基本特徵顯示,滑坡變形主要影響因素有:地質環境因素(地形地貌、地層巖、物質結構) 、外界影響因素(降水因素、洪水因素、人為因素、新構造及地震) ,以及滑坡近期變形特徵,通過剖面遞推系數法計算,對滑坡進行了評價,為滑坡機制分析和優化整治措施提供依據。
  3. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、體滲透水和庫區特大洪水等因素對馬家田尾礦堆積影響分析,初步論證了體尾礦砂土地震液化、滲透破壞、肩滑坡使體失和洪水漫頂可能,以及尾礦淋濾固結和化學固結作用有助於
  4. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、體滲透水和庫區特大洪水等因素對馬家田尾礦堆積影響分析,初步論證了體尾礦砂土地震液化、滲透破壞、肩滑坡使體失和洪水漫頂可能,以及尾礦淋濾固結和化學固結作用有助於
  5. The result shows soil masses in surface layer reach saturation more easily under great rainfall intensity and long - lasting rainfall, at the same time, there are big infiltration depth and influence of wetting deformation

    結果顯示,降雨強度越大、降雨持續時間越長,非飽和區土體含水率變化也大,坡表層土體較容易達到飽和,並且降雨影響深度也大,對坡表面濕化裂隙產生及影響大。
  6. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石損毀情況現場調查資料,結合有關專家多年整治經驗,總結出損毀原因及影響因素;對現有塊體研究成果進行回顧和總結,並針對散拋石直接損毀現象,結合山區河流水流、地形特點,利用塊體粒徑與起動流速關系,提出塊體重量與起動流速高次方成正比概念,流速50增長可能導致塊體重量接近40倍變化;通過二維變坡水槽試驗,研究了主要影響因素,包括塊體重量、頂水深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加體單個塊體重量或斷面尺寸來提高效果甚微;最後,根據西部地區自然、經濟、交通等條件,提出可以採用柔混凝土鉸鏈體等一類整體較好護面層作為散拋石防沖毀措施,以期取得良好工程效果。
  7. ( 5 ) conclusion was obtained by the analyzing and studying the mechanics environment of the rock mass and the landslide on right bank : according to the analysis, the present direction of the maximal principle stress was consistent with the present tectonic stress field, the value of the principle stress increased or reduced in special place, and there was tensile stress region at the 2000m or above it on the left bank, the accumulate and adjustment was very limited in 200 years, the calculated result of the landslide indicated that the landslide on the right bank was stable under the various conditions

    ( 5 )址區河谷巖體力學環境及右岸古滑坡體問題分析得出:河谷巖體應力場分析顯示,河谷巖體中主應力方向基本上與現今區域構造應力場方向一致,在一些特殊地帶巖體主應力值有所降低或增高,特別是在左岸2000m高程附近及以上,存在有明顯張應力區。在未來200年流變計算時步范圍內,河谷巖體應力積累與調整較為有限。同時對滑坡體各種工況條件下計算結果表明,右岸古滑坡體在各種工況條件下是處于狀態
  8. The result is basically agreed with the calculations and can verified the theory for the stability of earth - rock dams under flood discharge, in the second part of this paper, several kinds of slope - protection materials are studied. according to the material property, a type of new flexible slope - protection material applied to overflow earth - rock dams - rubber panel armoring - is presented

    為了研究高土石在大單寬流量下,本文第二部分主要對幾種不同土石護面材料進行了探討,根據材料和各自受力特點,提出選用一種新型護面材料?橡膠板作為土石防護材料。
  9. Based on clear boundary condition of dam shoulders, with rigid limit equilibrium vector method, baihetan hydroelectric power station dam shoulders anti - sliding stability analyzing program is compiled. then, by using above program, the anti - sliding stability of dam shoulders in different modes and different load patterns are calculated in respectively, and their stability is evaluated. the analysis results indicate that the anti - sliding stability of baihetan dam shoulders can meet the need of arch dam design

    在查明肩抗力體邊界條件基礎上,利用剛體極限平衡分析中矢量法在文獻[ 1 ]基礎上編制了白鶴灘肩抗力體抗滑分析程序,並對白鶴灘肩抗力體不同荷載情況下大塊體進行了評價,結果表明:白鶴灘肩抗力體總體上達到了拱設計要求。
  10. In this paper, based on the fact, according to the former scholars " survey to the geological general conditions in the daliushu dame site district, and applying model tests combined with numerical analysis, the stability of daliushu dame site is studied

    本文從實際出發,根據已有學者對大柳樹址區地質概況調查資料,運用模型試驗結合數值分析方法,對大柳樹進行了研究。
  11. The foundation of baise gravity dam has bad geological phenomena such as high elastic modulus ratio, joint fissures and large faults etc., so stability of baise gravity dam is the essential technical problem to project ' s success

    百色重力地質條件復雜,地基巖體具有高模量比、節理裂隙發育等不良地質現象。百色重力壩的穩定性是事關工程成敗關鍵技術問題。
  12. Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province. the height of dam is 292 m, and its installed capacity is 4, 200, 000 kilowatt, so it ' s a large - scale water - power engineering. the height of excavation reach to 80 m. so it is sure, that the excavation will influence on the stability of the slop. the stability of the slop is the necessary condition to assure the trouble - free operation of the station

    雲南省瀾滄江小灣水電站位於雲南省南澗縣和風慶縣交界處,最大擬建高292m ,裝機容量420萬千瓦,屬特大型水電工程。左岸砂石系統邊坡位於瀾滄江左岸8 ~ #山樑,主體開挖高度達80m ,開挖對邊坡產生很大影響。該邊坡對水電工程建設順利進行。
  13. So the research of its stability is significant

    所以研究水對尾礦壩的穩定性影響有重要意義。
  14. Silt will deposit there. velocities around groin head are larger than the scour velocity and scour hole may develop in this area. this would affect the stability of spur dikes

    受丁阻擋,田所在邊灘區域流速很小,泥沙在此淤積:而頭附近流速較大,通常在此區域形成沖刷,影響丁壩的穩定性
  15. Tailing dam stability analysis based on structural confidence level

    基於結構可靠度指標尾礦庫分析
  16. Based on the parameters from the tests, the stability of a loess slope was analyzied by using the reame ( rotation equilibrium analysis of multia yered embankments ) program

    根據試驗所得參數,應用多種土質堤轉動平衡分析計算機程序(簡稱reame程序)分析了黃土邊坡問題。
  17. In view of the seepage hazards existent in the homogeneous soil dam in landong reservoir and on the basis of physical property of the media and geophysical characteristics of the study area, the authors reasonably selected such geophysical techniques as high - density resistivity, ground penetrating radar, transient rayleigh wave and spontaneous polarization to make integrated exploration and find out the seepage path of water sources, thus providing grounds for evaluating stability of the dam body and designing the reinforcement plan

    摘要針對藍洞水庫均質大出現散滲等病險,根據區內各介質物理質及地球物理特徵,合理選擇了高密度電阻率、探地雷達、瞬態瑞雷波和自然電場4種物探方法進行綜合勘查,查明病險水源來向,為評估和加固處理設計提供依據。
  18. Abstract : in view of the seepage hazards existent in the homogeneous soil dam in landong reservoir and on the basis of physical property of the media and geophysical characteristics of the study area, the authors reasonably selected such geophysical techniques as high - density resistivity, ground penetrating radar, transient rayleigh wave and spontaneous polarization to make integrated exploration and find out the seepage path of water sources, thus providing grounds for evaluating stability of the dam body and designing the reinforcement plan

    文摘:針對藍洞水庫均質大出現散滲等病險,根據區內各介質物理質及地球物理特徵,合理選擇了高密度電阻率、探地雷達、瞬態瑞雷波和自然電場4種物探方法進行綜合勘查,查明病險水源來向,為評估和加固處理設計提供依據。
  19. The working stress state and the stability of typical blocks of baise rcc gravity dam are computed and studied based on the 3d non - linear finite element method ( fem ) and rigid body - spring element method ( rbsm ). the analysis of failure process, failure mode, failure mechanism of the dam are studied with overload method and combined method in which rock strength parameters are decreased while water load is overloaded to a certain degree. in this paper, the following works are done

    本文充分發揮有限單元法和剛體彈簧元法優點,對百色rcc重力典型段( 9b 、 4b )地基安全進行數值分析和計算,從超載法、綜合法等不同角度,對開展研究,分析體和基破壞過程、破壞形態和破壞機理,確基可能滑動路徑和滑移模式,評價工程安全
  20. The analyses procedures of the above two methods was use to study the stability of xiangjiaba gravity dam

    上述兩種分析方法還被用來分析向家重力大壩的穩定性
分享友人