完整井 的英文怎麼說
中文拼音 [wánzhěngjǐng]
完整井
英文
complete penetration of well-
Based on the development feature analysis, this paper studies thoroughly the reservoir flood feature and remaining oil distribution through the microstructure, sendimentary phase, reservoir heterogeneity and well control, and proposes the comprehensive adjustment based on the injection and development well net structure and improvement the result of the research is obvious with the production degression rate from 9. 14 % of 1997 to present - 1. 46 %, and water rate from original 0. 33 % to present 0. 16 %. in summary, the research idea, method and new achievement of the thesis provide a scientific geological basis for the oilfield development improvement
在對本區開發歷程和開采特徵分析的基礎上,從微構造、沉積微相、儲層非均質性、井網控制等方面深入地分析了油藏水淹特徵及剩餘油分佈規律,提出了以完善注采井網、調整注采結構為目的的綜合調整措施,已見到了明顯的效果:油田遞減由1997年的9 . 14降至目前的- 1 . 46 ,綜合含水上升率由原來的0 . 33降至目前的0 . 16 。To solve some questions about oil production declining quickly, production and injection patterns are imperfect, the low degree of reserves control, and the injection water not enough in injection well, we have taken measures such as strengthen the geologic integrated research, drill extension well and adjustment well, strengthen water injection system, and optimize fracturing techniques, which has improved reservoir development effect
為了解決產量遞減快、注采井網不完善、儲量控製程度低、注水井欠注等問題,採取加強地質綜合研究、鉆擴邊井和調整井、強化注水系統和優化壓裂工藝等措施,有效地改善了油藏開發效果。The matrix of time and space for development of hydrogen energy system in china will instruct this work comprehensively, scientifically and objectively ; for beijing case and from all the aspects of energy, environment and economy, the best plan of hydrogen energy system about fuel cell vehicles is : hydrogen is produced by natural gas steam reforming in the central factory, then transported to the refueling stations in the hydrogen tube trailer by the trucks, and filled to the fcb using hydrogen gas
這一工作應在燃料電池汽車氫能系統發展時空矩陣的指導下有計劃、有步驟地完成;燃料電池汽車在我國最早實現商業化的時間是2008年(奧運會) ,地點是北京,車型是燃料電池公共汽車。針對這一案例,綜合考慮燃料電池汽車氫能系統「從井口到車輪」全生命周期的能源利用效率、環境影響和經濟性指標,最佳的方案是:在集中制氫廠採用天然氣蒸汽重整制氫,用汽車將裝有氫氣的高壓氣瓶輸運到氫氣加註站,加註給以氫氣為燃料的燃料電池公共汽車。During field application, the adjustment while drilling technique of horizontal wells for ultra - thin oil layers has been improved to accurately control geosteering, optimize well course and decrease the ineffective section to the limit
在實施過程中,完善了適應超薄油層特點的水平井隨鉆調整技術,實現了準確把握地質導向、優化井眼軌跡,最大限度地降低了無效段。The yankees are also looking forward to seeing matsui healthy for another complete season after losing him for four months due to a fractured left wrist in 2006
去年松井秀喜因為左手?骨折而休息了四個月,今年洋基希望他能健康地打完整個球季。If pre - drilling mode was taken in an offshore oil development, pgb - free well drilling technology might be adopted for supplementary wells when the pgb slots were totally occupied
摘要採用預鉆井方式開發的海上油氣田,對水下鉆井基盤鉆井槽孔用完后增鉆的調整井,可採用無基盤鉆井方式作業。The re - recognition on the faults in xingnan development area can direct the work of plotting development plan, adjustment of injection - production relation, perfect injection - production patterns and dynamic analysis in the process of production
通過對杏南開發區斷層的再認識,對油田開發方案的編制、注采關系的調整、注采井網的完善及生產過程中進行動態分析起到了積極的指導作用。Ep - red is complete iron control system for oil well acidizing. this product uses field proven technology to minimize iron induced sludge and precipitation problems in all types of acidizing
Red是一套完整的鐵質控制系統用於油井酸處理。此產品是所有油井酸處理中應用了油井勘探技術來減少由鐵質而引起的鐵渣和鐵沉澱問題。( 5 ) based on the integrated sequence stratigraphy analysis of typical wells section and many well - to - well section, the control of hinge fault is confirmed. system tracts of downfaulted block perfectly develop, from lower position to higher position, upfaulted block ( west - north region of the gentle slop ) is in turn pgc, tst, hst, overlapping in sb
( 5 )通過典型井剖面及眾多連井剖面的層序地層分析,證實樞紐斷層的控製作用,斷層下降盤各體系域發育完整,而其上升盤(西北斜坡區)由低處向高處,依次是pgc 、 tst 、 hst超復于sb之上。Secondly, by means of arranging and analyzing the construction monitor data, the practicality method of proposing the dewatering calculation model and parameters of the non - constantly pumping dewatering well was proposed, moreover the equivalent calculation model and parameters of the erhe project was proposed. thirdly, based on calculating the design scheme of dewatering well with the equivalent calculation model, the optimized scheme of dewatering well of the erhe project was proposed and the well number was reduced to 32 where it was 42 in the old scheme. at last, based on the well construction, the dewatering well structure and constructing technique in the soft soil area were exploited in addition, the significative analysis and evaluation attitudes to the old design scheme of dewatering well project were impersonally proposed
首先,根據工程地質及水文地質條件和工期分析,提出了「二河」降水井的設計方案;其次,通過系統整理分析抽水井的施工監測記錄,提出了用降水井的施工監測確定非定常抽水降水井井流模型和參數的實用方法,並建立和確定了「二河」降水井非定常抽水、有越流的完整潛水井等效模型和參數;接著,通過用等效井流模型進行降水井方案的計算,提出了「二河」降水井的優化方案,使原方案的42眼井降到32眼井;最後,通過對降水井成井施工實踐的總結,開發了適于軟土區的降水井結構和成井施工技術。Standard test method for analytical procedure determining transmissivity, storage coefficient, and anisotropy ratio from a network of partially penetrating wells
測定不完整滲透井網路過濾系數儲藏系數和各向異性比率的標準試驗方法After column form installation, overall inspection and aligning shall be done for the cross dimension, axis, elevation and verticality, and then connect each column “ 井 ” shape rack as overall stable structure
柱模安裝基本完畢后對斷面尺寸、軸線、標高、垂直度等進行全面檢查校正後再進行固定,並將各柱井字架之間連成一體,形成穩定整體結構。It is composed by the activated carbon filter, the precision filter, the ion exchange, the security filter, the circulating water pump, the static pressure tank and vaporing make - up water treatment equipment and so on, constitutes a set of complete cobalt well water circulation processing devices, through the stainless steel pipe which buries in advance connected with the cobalt well water
它由活性炭過濾器、精密過濾器、離子交換器、保安過濾器、循環水泵、靜壓供水箱和蒸發補水的制水裝置等組成,構成一套完整的鈷源井水循環處理器,通過預埋的不銹鋼管與鈷源井水相連。Partially penetrating well
非完整井By analyzing the reduction pressure action of non complete penetrateel well and stop water heavy curtain, the paper expounded that effect of non complete penetrateel well was better than complete penetrated well and put forword the concept of reduction pressure coefficient
摘要通過分析非完整井和隔水帷幕的減降作用,得出選用非完整井比完整井效果好的結論,繼而引出減降系數的概念。Optimization and control for completion pressure system and cementing technology of adjustment wells
調整井完井壓力系統及固井工藝的優化與控制The wells fargo 10 mile tour is the perfect event if you are new to the sport or just not quite ready for the full 26. 2 mile marathon
如果你對運動新,井法戈10英里旅遊是完美的事件或就為不夠準備好了完整26 . 2英里馬拉松。Calculation method of reducing water level equipment outflow for incomplete disturbance well
潛水不完整干擾井降水裝置出流量計算方法The internal force, displacement, crack, and the section of the grid - beam are discussed wholly
針對井字梁結構,對其內力、位移、裂縫計算以及截面選擇都作了較為完整的論述。This paper studied the technologic characteristics and implementation of training system , and confirmed the approach to realize the training system. the paper regard the practical working process of the second oil extraction factory ' s underwell oil production as a model , and realized a complete underwell virtual training system on micro - computer platform
本文研究了虛擬培訓系統的技術特點和實現方法,確定了虛擬培訓系統的實現途徑,並以大慶油田第二採油廠井下作業公司的實際作業工藝為模版,在微機平臺上,實現了一個較為完整的井下作業虛擬培訓系統。分享友人