尾水水庫 的英文怎麼說

中文拼音 [wěishuǐshuǐ]
尾水水庫 英文
afterbay reservoir
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  1. That will be worth seeing, faith. as they turned into berkeley street a streetorgan near the basin sent over and after them a rollicking rattling song of the halls

    當他們拐進伯克利街時,附近一架手搖風琴迎面送來一陣喧鬧快活的游藝場音樂,走過去后,樂聲依然隨著。
  2. Intermediate frequency furnace ? continuous casting billets ? heated by heating furnace ? rough rolling ? head and tail end cutting ? intermediate rolling ? head and tail cutting ? finish rolling ? water cooling treatment ? multiple - length cutting and dividing ? cooling on the cooling bed ? cutting - to - length by cold shear ? collecting and bundling ? to warehouse

    中頻熔爐連續的鑄件鋼坯重復加熱的熔爐粗軋頂端和端切斷中間壓軋頂端和端切斷完成壓軋冷處理多功能的長度切割和分段在冷床上冷卻冷卻后冷剪長度聚集捆包運到倉
  3. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田區域地質構造、區不良地質觀察、礦淋濾固結和化學固結、壩體滲透區特大洪等因素對馬家田礦堆積壩體穩定性影響的分析,初步論證了壩體礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪漫頂的可能性,以及礦淋濾固結和化學固結作用有助於壩體的穩定性。
  4. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田區域地質構造、區不良地質觀察、礦淋濾固結和化學固結、壩體滲透區特大洪等因素對馬家田礦堆積壩體穩定性影響的分析,初步論證了壩體礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪漫頂的可能性,以及礦淋濾固結和化學固結作用有助於壩體的穩定性。
  5. Test research on treating acid mine drainage of tailings reservoir in an iron mine

    某鐵礦酸性廢處理試驗研究
  6. Application of soft perviious pipe in baizhishans tailings storehouse

    軟式透管在白雉山中的應用
  7. The water levels is correlated to seismicity. hypocentrum move to the top of reservoir, and form two seismic concentrated place - linmal2o3han and songwan

    位和地震有著明顯的正相關性,震區由移向首,並在丹的林茂山和宋灣形成了兩個地震密集區。
  8. Project and engineering consultation in water envioronmental protection large scale water supply and drainage system and high building fire system taoling deposit and transport system fire system for oil station lpg station etc

    擅長環境保護治理,大型給排及高層消防工程礦山礦輸送系統以及油,液化氣的消防工程與技術咨詢。
  9. All kinds of special pipes and conduits ( ditches ), ash storage sites, wells, pumping stations, water cooling towers, oil depots, dikes and dams, railways, roads, bridges, docks, fuel loading and unloading equipment, lightening arresters, fire - fighting equipment and other related ancillary equipment outside power plants and power transformation stations

    (三) 、力發電廠使用的、大壩、取口、引隧洞(含支洞口) 、引渠道、調壓井(塔) 、露天高壓管道、廠房、渠、廠房與大壩間的通訊設施及附屬設施。
  10. Reservoirs, dams, water inlet, water diversion tunnels ( including branch tunnels, water diversion canals, voltage adjustment wells ( towers ), open - air high - voltage conduits, premises, water discharge canals, communications facilities between premises and dams and other related ancillary equipment used by hydropower stations

    (三) 、力發電廠使用的、大壩、取口、引隧洞(含支洞口) 、引渠道、調壓井(塔) 、露天高壓管道、廠房、渠、廠房與大壩間的通訊設施及附屬設施。
  11. Abstract : yingdongpo gold mine as an example of gold mine, it ' s oredressing wastewater quality was investigated. alkali chlorinating process being adopted for treating the oredressing wastewater of yingdongpo gold mine, it has achieved good result in removing the cyanide and heavy metal. after analyzing the experimental result for the affecting factors, the project that using the method of intermittence reaction to treat the cyanide wastewater is proposed

    文摘:以銀洞坡金礦為例,對選礦廠含氰廢進行了質調查,採用堿性氯化法處理銀洞坡金礦的含氰廢,在去除氰化物和重金屬方面都取得了較好的效果,提出了採用間歇式方法處理含氰廢工藝方案。
  12. By analyzing and studying yujiaquan tail dam of luzhong mining group example, the failure, groundwater seepage arid dust nuisance of tail dam are studied

    摘要通過分析研究魯中冶金礦業集團的御駕泉礦序實例,對礦壩的破壞,地下滲漏和細粗揚塵三個方面進行了研究。
  13. The surface panel method has been applied to predict the hydrodynamic performance of highly skewed propeller. the surface of propeller and its trailing vortex are discreted by a number of small hyperboloidal quadrilateral panels with constant source and doublet distribution. for highly skewed propeller, the conventional method generating grid oriented along constant radii will result in a high aspect ratio and a high skewness and a twist panel near the propeller tip on blade surface, which result easily in incorrect calculation results of velovity on blade surface, even in iteration divergence and calculation failure. a “ non - conventional grid ” is developed to acoid these problems. this grid can effectively solve the problem of the calculation and convergence for highly skewed propeller. the non - linear kutta condition of equal pressure on upper and lower at the trailing edge is executed by the iterative procedure. by sample calculating, the obtained results are satisfied the experimental data

    採用面元法預報大側斜螺旋槳動力性能,螺旋槳表面及渦面離散為四邊形雙曲面元,每個面元上布置等強度源匯和偶極子分佈.對于大側斜螺旋槳而言,槳葉表面採用常規的等半徑網格劃分方法在近葉梢處將導致大展弦比、大側斜和扭曲面元,這容易使槳葉表面速度的計算結果不正確,甚至會導致迭代過程發散及計算失敗.文中建立了一種「非常規網格」劃分方法,能有效地解決大側斜螺旋槳的計算和收斂問題.槳葉隨邊處通過迭代實現非線性等壓塔條件
  14. ( 2 ) discuss how to use the information from rs to distill the environmental geologic factors discuss the method for distill the surface sink, landslip, etc. from dtm, water, residential area, vegetation, gold mine points, gangue warehouse, etc. from spectrum analysis, roads, ground split, falls, etc. from crisp and eye distinguish

    ( 2 )探討利用遙感信息進行環境地質因素的提取方法對各環境地質要素進行遙感信息的提取,探討了基於數字地面模型的地面塌陷、崩塌等要素的提取方法;基於波譜分析的體、居民區、植被、金礦點、等要素的提取方法;基於邊緣增強、目視判讀等方法的線狀要素如道路、地裂縫、構造線的提取。
  15. Thus it must be harnessed by taking powerful measures. there are many factors influencing the environmental geologic conditions, and those factors " distribution are very complex, which include physical and man - made factors

    涉及地形、地貌、地質構造、文地質條件、河流系等自然地理要素以及金礦開采導致的塌陷、固體廢棄物、礦坑、等人為環境要素。
  16. Construction work for the two treatment works at tai po and ngau tam mei and for the sham tseng treatment works stage ii was in progress. construction continued of the additional service reservoirs, pumping stations and water supply networks in kowloon west and south, pok fu lam, wan chai, western and central areas on hong kong island, tseung kwan o, sheung shui, tuen mun, tin shui wai and yuen long

    位於大埔和牛潭的兩座濾廠,以及深井濾廠第二期的建築工程正在進行。在九龍西南部、薄扶林、灣仔、港島中西區、將軍澳、上、屯門、天圍及元朗增建的配、抽站和供網路的建造工程繼續進行。
  17. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)電站是黃河幹流上的一個梯級電站,為了減少征地移民損失,經對炳靈電站(塔坪壩址)斷面在劉家峽不同運行方式下的位與流量關系進行分析研究,在總裝機和年發電量基本不變的情況下,充分利用劉家峽汛限位,將電站樞紐選址在其電站內。
  18. The engineering works were extremely difficult as river flow had to be reversed. the dongshen - hong kong water supply scheme therefore necessitated the up - lifting of water in 8 stages with a total elevation of 46 metres. the water was then fed to the yantan reservoir (

    工程1963年展開,經八級提,將位提高46米后,注入雁田,再由開挖3公里人工渠道,注至深圳,再由深圳直接供應香港。
分享友人