的英文怎麼說

中文拼音 [bǐng]
英文
屏構詞成分。

  1. In soft, abnegating bald dos operating system, we will realize testing and displaying in real time on windows operating system. in hardware, we use computer as postposition cpu, monolithic processor as front cpu, and link them into simple network. in this way, we will realize a kind of distributing testing system providing with high precision and remote controlled ability

    軟體上,棄枯燥的D O S界面,使用windows平臺實現實時性很高的實測實顯任務;硬體上,將計算機作為上位機,單片機作下位機,連成簡單的網路,實現高精度的、具有遠程控制能力的一種分散式測試系統。
  2. No response to the touch on the surface acoustic wave screen

    表面聲波觸摸無響應
  3. Inaccurate touch of surface acoustic wave touch screen

    表面聲波觸摸不準
  4. Domestically made surface acoustic wave touch screen

    國產表面聲波觸摸
  5. The surface acoustic wave screen cannot be adjusted

    表面聲波不能校準
  6. It takes too long a time for the surface acoustic wave to respond

    表面聲波響應時間很長
  7. An adiabatic wall must be able to block radiation.

    絕熱壁必須能蔽輻射。
  8. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如果能使錦工程引水隧洞灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護結構以及排水措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。
  9. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  10. I then set the airbrush to screen and cut in some highlights

    我當時還用噴筆在幕提亮了些高光。
  11. Iran's role in western strategy was to pose a barrier to soviet encroachment that could not be surmounted short of all-out invasion.

    伊朗在西方戰略中的作用是對蘇聯的侵犯構成一道障,除非全力入侵,否則無法逾越。
  12. Tft lcm was tested by line inversion mode under the condition of alternant vcom voltage, after the sample was made by cog and tab craft

    在通過cog 、 tab工藝完成樣品製作后,採用行翻轉驅動方式, vcom交替變換的方式對tft顯示進行了驅動點亮測試。
  13. Shielded storage batteries 24 volts, 36 amperes - hours

    蔽式蓄電池. 24v36安培小時
  14. Ancillary block of old ping shan police station

    山警署的輔助建築物
  15. Anechoic chambers. part 1 : shield attenuation measurement

    消聲室.第1部分:蔽衰減測量
  16. Anechoic chambers - shield attenuation measurement

    消音室.蔽消音測量
  17. Anechoic chambers - part 1 : shield attenuation measurement ; german version en 50147 - 1 : 1996

    消聲室.第1部分:蔽消聲測量
  18. Could ann hold his breath ?

    安能住呼吸嗎?
  19. If the aperture is circular, a circular spot of light appears on the screen.

    如果孔是圓形的,那麼在幕上出現一圓形光斑。
  20. Now remove a small disk-shaped segment from the center of the screen so that light streams through the aperture.

    現在從的中央挖掉一個圓盤形小塊,使光通過此孔射出。
分享友人