嵌巖樁 的英文怎麼說
中文拼音 [qiànyánzhuāng]
嵌巖樁
英文
socketed pile-
In combination with the construction practice of abutment no. 2 great bridge and no. 1 medium - scaled bridge, the paper introduces the construction technology of rock - socketed piles in highway engineering
摘要通過邊墩2號大橋和羊山1號中橋的施工實踐,介紹嵌巖樁在公路工程中的施工工藝。Design and construction code of rock - socketed piles for harbour engineering
港口工程嵌巖樁設計與施工規程Some references will be offered for optimal design of bridge pile on the test results, and some new thoughts are obtained in making up for the shortage in the theory of rock - socked pile design
試驗結論不僅為橋墩的合理設計提供參考,也為彌補嵌巖樁現有設計理論的不足提供某種新的思路。This paper describes the construction technique of offshore anchoring rod rock - socketed piles for dalian beiliang oil product terminal, with the emphasis laid on the construction method of offshore construction platform, cleaning up inside piles, rock - socketed anchoring rod, and anchoring bolt, as well as means for dealing with special situations during construction
摘要介紹大連北良石化成品油裝卸碼頭海上描桿嵌巖樁施工技術,著重介紹海上施工平臺、樁內清理、嵌巖錨桿、錨固硅的施工方法及施工中特殊情況的處理。Bearing behavior of large - diameter rock - socket piles
大直徑人工挖孔嵌巖樁的承載性狀In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying
本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。Borehole completion process of rock socketed piles for the piers of yongding river no. 2 bridge
永定河2號大橋橋墩嵌巖樁成孔工藝Quality control for the construction of anchor pile and pile embedded in rock of phase two project of yantian port
鹽田港二期工程錨碇樁和嵌巖樁的施工質量控制A discussion on bearing capacity of socketed pile in very soft rocks
極軟質巖石中嵌巖樁的單樁承載力探討Abstract : in this paper the characteristics of reflection waveform of embedded rock piles are studied from the point of theory and practice
文摘:從理論與實踐上對大直徑嵌巖樁的反射波形特徵進行分析研究。The rectification of calculation formula on pile soil ' s limit ressistance to lateral force of soft rock bored socket pile
軟巖嵌巖樁樁周土極限側阻計算公式的修正Secondly, on the basis of the theory of rayleigh - love bar, the longitudinal vibration of a large diameter end - bearing pile in saturated soil is investigated considering transverse inertial effect. the vibration of pile considering transverse inertial effect is different from the one not considering this effect significantly at a smaller slenderness
2 、根據rayleigh - love桿理論,計及樁身的徑向變形,研究了飽和土中考慮橫向慣性效應的大直徑嵌巖樁縱向耦合振動理論,分別在考慮與不考慮橫向慣性效應下,比較了大直徑樁縱向振動的特性。Research on index of reliability for bearing capacity of rock - socketed single pile in chongqing
重慶市嵌巖樁單樁承載力可靠指標分析Beginning with plentiful experimental bases, some problems about pile - foundation technical criterion are discussed, some suggestions about are advanced, some rules about rock - socketed offect are educed : rock - socketed pile has conclusively rock - socketed offect, and when rock - socketed length achieves a certain value, increasing length will not influence bearing capacity, but base resistance still exists. based on the neural network model of limit load of rock - socketed segment of piles, the analysis method of characteristic parameters is proposed by means of self - organizing character map network
在分析大量的實測資料基礎上,對樁基技術規范中嵌巖樁的承載力計算公式進行了分析探討,認為f _ ( rc )應具體情況具體分析,取值應符合現場實際; s 、 p應在靜載試驗后再確定。Study on socket length of rock - socketed piles in soft soil ground
軟土地基中嵌巖樁嵌巖深度的研究Hand - dug rock socketed pile construction for a building in shenzhen
深圳某大廈人工挖孔嵌巖樁施工方法Analysis of bearing behavior of large - diameter hand holed socketed piles
軟巖地基中大直徑挖孔嵌巖樁的承載性狀分析Large diameter deep rock socketed pile construction in the granite along the coastal area
沿海花崗巖地區大直徑超長嵌巖樁施工技術The results will be helpful for engineering application and more research about rock - socketed piles
本文的結論對嵌巖樁的進一步研究和工程應用有一定的幫助。Comparing with other forms of base construction, socketed piles are more widely used in civil engineering because of their higher bearing capacity, littler settlement
嵌巖樁因具有單樁承載力大、沉降小的顯著特點而在土木建築工程中得到了廣泛的應用。分享友人