巖井計算中心 的英文怎麼說

中文拼音 [yánjǐngsuànzhōngxīn]
巖井計算中心 英文
iwai data processing co. , inc
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設規范的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(基)承載力的動測法進行了研究,為各類地基(包括基) ,匯總了動力分析和檢測川的參數:針對日前土工程界應用樁基設規范的難點? ?樁端基承載力的確定問題,從石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法、土力學及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深荷試驗裝置的核部分? ?反力裝置,設了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. Abstract : according to sidewall unstable problem during dr illing, the study on sidewall stability is developed. the paper analyses sidewall stress state and sidewall unstable type, and combines with log data and indoor e xperimental result of core. through analysis and calculation, the method of calcul ating slough formation pressure is proposed. by application of the method in 3 wells in yancheng area, result shows that slough pressure section fits in with field practical condition. it supplies some basis for design of drilling fluid d ensity

    文摘:針對鉆壁失穩問題開展壁穩定性研究,文壁應力狀態和失穩類型進行分析,並結合測資料和的室內實驗結果進行分析,建立了一套地層坍塌壓力的方法,結合鹽城地區3口應用對比,坍塌壓力剖面基本吻合現場實際,為鉆液密度設提供了一定的依據。
  3. The paper gathered deep layers well logging materiak record well materiak core and cutting material of 27 wells in the daqing district, recognized the different type of igneous rock according to their log response feature, and made a large number of cross plot, then carefully chose several of them which works better igneous rock lithology recognition. made pattern recognition procedure using computer to recognize lithology, synthetical many logging parameter to identify igneous rock lithology. and then on the basis of recognizing lithology, the paper analyzed the lithofacies recognition law in this district

    採集了大慶地區27口的深層測資料、錄資料、屑資料,根據火成的測響應特徵識別不同類型的火成,並做了大量交會圖,精選了幾種識別火成性效果較好的交匯圖版,編制機識別性的模式識別程序,綜合多個測參數識別火成性,並在識別性的基礎上,進一步分析本地區相的識別規律,最後結合試油資料,分析本地區火成儲集空間的特點及油氣與火成性和相的關系。
  4. According to the analyses of the research results about the feasibility of 4 - d seismic and the successful 4 - d seismic cases of foreign companies, the author put forward the suggestions for 4 - d seismic pilot area selection ; briefly analyzed the influential function of producing way on the seismic response ; utilized theory calculation, coring data analyses, and reservoir numerical simulation to define the fluid substitution effects on the p - wave velocity. through long time water driven to the reservoir, some of the properties and the log curves have changed, the author tried to find the variation rule of the reservoir and its effects on seismic velocity. the " blind point " in 4 - d seismic feasibility study both in china and overseas was found, that is the lack of consideration of the influence of physical property variation by long time water driven on the seismic response

    在深入分析國外四維地震可行性研究成果和成功實例的基礎上,提出了有利於水驅四維地震成功的工區優選條件;簡要剖析了各種開采方式及其對地震特性的影響;利用理論分析、油藏數值模擬三種方法確定了流體替代對縱波速度的影響;通過對長期水驅造成的物性參數、測曲線以及油藏溫度和壓力變化規律的總結,分析了這些變化對地震速度的影響,指出了目前國內外水驅四維地震可行性研究存在的盲區?沒有充分考慮長期注水造成的物性、溫度和壓力變化對地震響應的影響,完善了水驅四維地震可行性研究的內容;在考慮了這些變化因素后,高29斷塊水驅四維地震可行性研究結果表明:四維地震監測注水前沿可能要比監測油藏變化容易的多;以四維地震石物理可行性研究結果為基礎,提出了五個有助於突出四維地震造成的微小差異的途徑,為今後水驅四維地震研究指明了方向。
分享友人