工作阻力 的英文怎麼說

中文拼音 [gōngzuò]
工作阻力 英文
effective resistance
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 動詞(阻擋; 阻礙) block; hinder; impede; obstruct
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 阻力 : 1 (阻礙事物發展的外力) obstruction; resistance 2 [物理學] resistance; drag; drag force; nowel; ...
  1. Abstract : apply computer simulation to the distribution pattern of air - flow without considering the cold condition of the combustion and compare the flow patterns under different designed circumstances. and the effect of the design of the partition in the air way of the burner on the flow and mixture of gas and air is especially studied. the result shows that the design of partition plays a very important role in strengthening the mixture of gas and air, but increases the loss of the resistance in the air way and the total pressure of the air way in same working conditions needs increasing

    文摘:應用計算機模擬的方法,在不考慮燃燒的冷態情況下,研究了熱風爐燃燒室內的氣流分佈規律.在此基礎上,比較了2種不同設計方案的氣流流動特徵,尤其是研究了燃燒器空氣通道內流板的設置與否對空氣和煤氣的流動和混合的影響.結果表明,流板的設計對加強空氣和煤氣的混合有著極為重要的用,同時也增加了空氣管道的損失,在同樣的況條件下需要提高管道系統的總壓
  2. In the northern colonies, for example, the promotional efforts of the anglican church met with strenuous resistance.

    例如,英國聖公會在北部殖民區的傳教,就遇到堅強的
  3. In previous study of the combined action of engineering piles and fender piles, piles are assumed to be straight lines without thickness in subsidiary stress computation, which will often cause errors to various degree

    程樁與圍護樁共同用分析中,將要大量地計算樁身在土體中引起的豎向附加應和壓縮量。
  4. The structure and operating principle of an air - charged split - type adjustable shock absorber was described, e non - linear parameterized mathematical model of this shock absorber ' s damping characteristics was established according to fluid mechanics theory and the main structural affection factors to shock absorber ' s damping performance, such as the diameter of piston valve orifice, the diameter of adjustable orifice, the initial volume of gas chamber, the diameter of piston rod, the inner diameter of oil pipe and so on, were analyzed by simulations

    摘要通過分析一種分體式充氣可調尼減振器的結構和原理,運用流體學理論,建立了該減振器尼特性的非線性參數化模型,模擬分析了活塞尼閥孔徑、尼調節孔徑、氣室初始體積、活塞桿直徑、油管內徑等主要結構參數對減振器尼性能的影響,通過試驗測試,得到了減振器樣件的尼特性及其可調范圍。
  5. The effect of cutting speed, cutting thickness, cutting knife and materials on the working power capacity is discussed. finally tractive property of road plane milling machine is also studied. through the comparison of the results of theory calculation and experimental results the equation of working power capacity of milling machine is modified

    本文對冷式瀝青路面銑刨機的動過程進行了理論分析與試驗研究,並利用金屬材料切削的基本原理,研究了主切削,並從能量轉化守恆的角度推導了銑刨機銑刨和功率計算公式,討論了機器切削速度、銑刨厚度以及刀具與材料特性對銑刨和功率的影響規律,最後討論了銑刨機牽引性能,且通過試驗研究驗證了銑刨和功率公式。
  6. Even labor protection has not been able to prevent completely the proneness of those in working age to reduction in hearing capacity

    即使是勞保護措施也無法完全止人們在生涯里出現的聽下降的傾向。
  7. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施藝的檢測和樁身質量及承載的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載特性,進行了富有成果的現場測試;試驗數據表明樁側摩和支盤端起很重要的用,樁端所佔比例甚少。這與設計樁基時的計算模式相差很大,承載也較設計增加;使用學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  8. It was found that comparing with the case without dirt band the periodic weighting distance, median roof moving coefficient and support resistance all increased to different extent because of the influence of dirt band

    發現由於夾矸的影響,與不含夾矸層面相比,其周期來壓步距、平均動壓系數和支護都有不同程度的增大。
  9. The in - situ measurement and analysis of support resistance and top - coal movement in fully - mechanized top - coal caving face of a thick coal seam with dirt band had been carried out in some coal mine, the strata behavior and movement law of top - coal were revealed

    摘要對某煤礦含夾矸煤層綜放面的支架工作阻力和頂煤移動進行了現場觀測和分析,揭示了其礦壓顯現和頂煤運移的規律。
  10. Equipped with electronic controller fini tronic and preset for remote control for two or more compressors. it offers working pressure and oil mist separator tank inner pressure indication, separator filter clogging lashing alarm before overpressure e - stop, electric motor temperature control, maximum screw assembly temperature control, air temperature on pressure end indication, electric motor direction of rotation check, time to scheduled maintenance term, total operating hours and operating hours under load, alarm log of last five failure events

    並預設為丙臺以上空壓機聯機遠程控制,有和油氣分離器罐內壓指示,分離器過濾器塞報警,電機溫控,螺桿總成溫控,壓端空氣溫度指示,電機轉向檢查,維護周期油,油過濾器,空氣過濾器,分離器過濾器,總運行時間和負載運行時間,記錄上五個報警故障等。
  11. With observation on the resistance of zwm - type grid - shaped walking hydraulic support on no. 7177 working face of kongzhuang coal mine, the load - carrying properties are analysised, measures for raising usage rate of the support working resistance have been put forward

    通過觀測孔莊礦井7177面zwm網格式液壓邁步放頂煤支架的,分析了支架承載特性,提出了提高支架工作阻力利用率措施。
  12. Aiming at the working condition and object of the 9gscc - 1. 4 sunken - plantharvesting equipment, resistances of ship body and cutting fram were analyzedby means of theory of hydromechanics and traction force of the chain - type convegor were done also by means ofcalculation of tension. power equation of the equipment, which relates to the implement ' s forward speed vm, chain - type convegor ' s linear velocity vs and cutting frame ' s angle of dip, was attained. this paper established a mathematical model for power consumption as objective function, based on thefundamental, structural dimensionof the equipment

    本文根據9gscc - 1 . 4型水草收割機的原理及其主要結構尺寸,針對收割機的條件和對象的特性,應用流體學理論分析計算船體及切割撿拾架的工作阻力,並用逐點張法計算輸送鏈的牽引,得出整機消耗功率與機組速度vm 、輸送鏈線速度vs及切割架入水角之間的關系式。
  13. Finally, new high - tech enterprise ' s work stress source patterns are obtained, which includes management efficiency & work atmosphere, career stress, work obstruction, work content, exceeding self stress, balancing work & family and lacking understanding & communication

    該模式包括管理效率與氛圍,事業壓工作阻力內容,超越自我的壓,平衡與家庭的壓和缺乏理解與溝通等7個方面。
  14. Research of interaction between support working resistance and overlying strata movement

    支架工作阻力與覆巖用機理研究
  15. Determination of the setting load of hydraulic supports in the condition of high working resistance

    工作阻力液壓支架初撐的確定
  16. The analyses results provided basis for reasonably determining the load and the structural type of support and the top - coal caving parameters

    分析結果為合理確定支架的工作阻力和結構型式及合理確定放煤參數提供了依據。
  17. Present the experimental research carried out on strain and stress by applying the resistance strain surveying technique to the big hole sealed heads in the new fire - tube heating boilers with the laws of strain and stress distribution obtained and allowable working pressure given because there is no applicable standards or specification for calculating the strength of crude oil heating boiler heads perforated by densely distributed big - holes, which, to a certain extent, hampered the further development of crude oil heating boilers in china, and concludes from experimental results that strain and the stress of circumference are fairly large near the edge of big - hole, and the cross ribs enhance strength of sealed head to a certain degree

    油田火筒加熱爐密集大開孔封頭的設計計算,因沒有相應的強度計算標準在一定程度上限制了我國油田火筒加熱爐技術的發展.採用電應變測量技術,對新型火筒加熱爐大開孔封頭進行了應應變試驗研究,得到了封頭的應變和應分佈規律,給出了大開孔封頭允許的.試驗結果表明,大孔邊緣圓周處應應變較大,十字筋板對封頭有一定加強
  18. The paper summarizes the development of the control technology of paver ' s vehicle system ; discusses the feasibility of the plc application to vehicle system ; calculates and examines the working resistance and power of the control system as well some concerning parameters of the hydraulic system ; builds the driving system velocity characteristic ; accomplishes the hardware design and the software design according to the functional requirements of vehicle system and the features of plc ; adds the pid compensation to the closed circuit velocity control ; sums up the mathematic model of hydraulic pump - motor system and defines the controller parameters ; in the end, the simple dynamic simulation basing on the control system model and the simulative test are carried out to testify the reasonableness and the feasibility of the designed plc control system

    本文總結了攤鋪機行駛控制技術的發展,討論了plc應用於行駛系統的可行性;計算和校驗了控制系統工作阻力、功率及液壓系統有關參數;建立了行駛驅動系統的速度特性;結合行駛系統的功能要求及plc的特點,完成了控制系統的硬體設計和軟體設計;對其速度閉環控制,引入了pid校正環節;歸納了液壓泵?馬達系統的數學模型,確定了控制器的控制參數;最後對控制系統模型進行了簡單的動態模擬和plc模擬試驗,初步證實了控制系統設計的可行性和合理件。
  19. Specially, the staff performance evaluation maintains rigid, superficial and formalized, what is more, the system setup is backward and most of the quantification control still is in the task prospectus, which result in non - objective and partial performance evaluation. the performance lacks close connection with the interests of staff and divisions. to be worse, the functions of incentive and constraint in organizations cannot be well practiced and all the negative affects above - mentioned prohibit, in essence, the system reforms from deepgoing in maritime system

    特別是對人員業績的考核,表面化、形式化現象嚴重,制度建設落後,量化管理大多停留在任務計劃書中,難以體現業績考核的客觀性和公正性,業績與人員和部門利益脫鉤,不能很好地實踐組織激勵與約束的功能,礙了海事系統各項制度改革的深入開展。
  20. Effective resistance moment

    工作阻力
分享友人