庫沙因 的英文怎麼說

中文拼音 [shāyīn]
庫沙因 英文
cushine
  • : 沙動詞[方言] (搖動以清除雜物) shake
  • : Ⅰ動詞[書面語] (沿襲) follow; carry on Ⅱ介詞1 [書面語] (憑借; 根據) on the basis of; in accord...
  • 沙因 : sain
  1. Soil is the base of agriculture production, the key measure to prevent water and soil loss is to conserve soil, but most soil nutrient is lost with the sediment loss, and serious water and soil loss make the soil thickness degrease, the soil nutrient be deficient and lean, the land quality degrade and the yield of plant decrease, all this results is going to threaten the people ' s transplanting and the agriculture sustainable development, and restrict the economy development of three gorges regions

    同時,土壤是農業生產的根本,治理水土流失的關鍵是要保住土壤,而土壤養分絕大部分是隨著泥流失的,嚴重的水土流失造成土層淺簿、養分貧瘠,土地質量退化,產量下降,對三峽區移民工作和農業可持續發展造成嚴重威脅,制約三峽區經濟發展。此進行三峽區坡耕地土壤侵蝕機理研究,探索減輕坡耕地土壤流失的方法措施,具有全局性的重大意義。
  2. In the database establishment of the sandstorm and application, the information remote sensing of the sandstorm is solved and translated and monitored, sandstorm climate origin cause of formation and prewarning of sandstorm is it predict comprehensive research and development and application of technology respect in at home leading competence to predict, having improved the prescroption predicted in sandstorm prewarning greatly, obviously improving the pilosity area of sandstorm of our country will predict competence and public service ability to the prewarning of the sandstorm

    塵暴數據建設與應用、塵暴信息遙感解譯和監測、塵暴氣候成以及塵暴的預警預報預測綜合技術的研發和應用等方面處于國內領先水平,極大地提高了塵暴預警預報的時效性,明顯提高了我國塵暴多發區對塵暴的預警預報水平和公共服務能力。
  3. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,水產生泥異重流的機率較大,能否運動到壩前排出外,還要看異重流潛入點位置、入流量、洪峰歷時、入量、水閘門運用等素,需要做好異重流預報監測工作。
  4. In the years following operation desert storm, u. s. military strategists debated the best way to destroy such “ hardened ” and deeply buried targets, knowing full well that attacks on subterranean bunkers or weapons stockpiles would face uncertain chances of success

    漠風暴作戰后這幾年,美軍戰略專家爭論著哪種方法最適合用來破壞這種強硬又深埋地下的目標,為他們很清楚,攻擊地下掩體或武器的成功機率無法掌握。
  5. The paper starts with the reservoir sedimentation, operation mode and catchment runoff characteristics. the study comprises of distributing of runoff and sediment in the catchment, the influence and trend of sedimentation and water storage under different operation mode

    課題研究主要從水淤積狀況、運用方式和流域徑流特徵分析入手,闡述了流域徑流、泥時段分佈,研究了不同運用方式下水沖淤的主要影響素及變化趨勢,分析了不同運用方式時水淤積情況和攔蓄水量。
  6. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取水工程的布設要考慮工程所處河段的地質水文等諸多素。如該河段上下游水容,泄水流量、河道沖刷、淤積、河床形態、水流形態、冰塞、河段上游的支流匯入、洪峰、峰的大小、河道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。
  7. For the reasons of accumulated soils and sands and the amount of precipitation, the volume in the reservoir is dynamic. if the volume in the reservoir is not dispatched correctly, it will result in the overflowing of the dam bank of the reservoir, even in the collapsing of the darn

    容又是水調度不可忽視的問題,而容又與水的橫、縱斷面、水位、水深有關,由於泥淤積、降水量多少等原,水水量是動態的,不對水水量正確調度,會在大洪水時,造成水堤壩漫溢甚至垮壩。
  8. Tchitchagov was one of the generals most zealous in advocating attack and cutting off the enemys retreat ; he had at first suggested making a diversion in greece and then in warsaw, but was never willing to go where he was commanded to go. tchitchagov, who was notorious for the boldness of his remarks to the tsar, considered kutuzov was under an obligation to him, because when he had been sent in 1811 to conclude peace with turkey over kutuzovs head, and found on arriving that peace had already been concluded, he had frankly admitted to the tsar that the credit of having concluded peace belonged to kutuzov. this tchitchagov was the first to meet kutuzov at vilna, at the castles where the latter was to stay

    奇恰戈夫一個最熱衷於切斷和擊潰戰術的人,奇恰戈夫,他最先要到希臘然後要到華進行佯攻,然而無論如何都不去派他去的地方,奇恰戈夫,他以敢於向皇上進言而聞名的人,奇恰戈夫,他自以為圖佐夫受過他的好處,這是為在一八一一年他被派去與土耳其媾和,他背著圖佐夫,當他確信,和約已經締結,於是在皇上面前承認,締結和約的功勞屬于圖佐夫就是這一位奇恰戈夫第一個在維爾納圖佐夫將進駐的城堡門前迎接他。
  9. Through the all - sided tectonic analyses, it can be deduced that there are two aspects will be the hidden defects to the dam and the engineering stability of the reservoir area. one is the dislocation interfaces resulting from the the majiaheba faultage ' s thrusting overriding and other causes of formation. the second is the region of strong deformation, such as the above of the dam, middle and high positions of the lava layers and the regions of overprint of the structure of ne to the one of nw, which should be taken into account especially

    通過區域和壩區錯動帶的全面構造解析,認為由馬家河壩斷層逆沖推覆作用而在壩區形成的向金江下游緩傾的錯動帶以及其它成的錯動帶是壩區和區工程穩定的隱患,尤其是變形較強的壩址區上游區、中高層位以及北西向構造期的錯動帶疊加於北東向構造期錯動帶的部位,更應該引起足夠的重視。
  10. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽水淤積入手,分析水淤積特性和區圍墾堤開發利用淤積灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調蓄容、造成同級流量下水水位抬升水回水上延、對沿岸及過河建築構成影響、水位抬升致使區周邊灌區地下水排水不暢乃至倒灌而造成土地鹽堿化、對水區大量淤積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出區圍墾堤是水水位抬升的重要原
  11. On the one hand, the sediment density current often does a great harm to the reservoir, and causes a big loss of reservoir ' s storage capacity or makes reservoir severe deposition ; on the other hand, sediment outflow by density current is an effective measure to mitigate sedimentation

    異重流(本論文中主要指量的差異而形成的渾水異重流)一方面常常給水帶來嚴重的危害,加速水的淤積和容的損失;但另一方面它又為水提供了一種極為有效的途徑? ?水異重流排
  12. Among the 130 debris flow valleys, dazhai gully suspends high on the up range of baihetan hydropower station, with an altitude over 970 m and a drop more than 350 m. gravels, mud and flood in this valley brings the construction site in great danger. 3 kilometers upriver from the mouth of dazhai gully, lies the haizi gully, which is also frequented by debris flows, but will be taken as the dumping site for the construction

    區130條泥石流溝中大寨溝以溝口海拔970餘米的高程和350餘米的落差高懸于白鶴灘水電站的大壩上方,其溝內泥石流帶來的礫石、泥與洪水直接威脅著電站建設工地和樞紐的安全;緊鄰大寨溝溝口上游約3km的海子溝則為一條泥石流活動頻繁的溝谷,其出口將作為水電站建設的棄渣場地,流域內的泥石流活動關系著水電站建設中棄渣場的安危。
  13. Change of flow and sediment conditions, inflow of branches, the different river boundary conditions and the different respond methods caused by the different of river boundary conditions are the cause of complex response in replacement of the spatial and temporal process

    輸入水條件的變化、水下遊河道支流入匯、河床邊界條件的變化以及此導致的不同調整方式是引起時空演替復雜響應的主要原
  14. A genome library of serratia marcescens cw - w - 90 - 3 strain was established by " shot gun " method and screened for phospholipase activity on lb - egg yolk plate

    通過鳥槍法構建了粘質雷氏菌serratiamarcexcenscw - w - 90 - 3菌株的基組dna文
  15. Along with 21 centuries putting into effect step by step of strategy is developed greatly in our country the west, and this district will be the west possesses one of district of the development vigour, rapid development of society economy most, and ensures public security that the requirement put forward entirely is also more and more higher to preventing flood, therefore would rather quickening ningmeng course further, the river training is very necessary

    隨著21世紀我國西部大開發戰略的逐步實施,該地區將是西部最具發展活力的地區之一,社會經濟的迅速發展,對防洪保安全提出的要求也越來越高,此,進一步加快寧蒙河段的治理是十分必要的。本文通過分析黃河寧蒙河段的水文泥特點、河道特性、以及龍、劉水運用后對寧蒙河段的影響,闡述了寧蒙河段河道整治的重要性。
  16. Based on research on management modes of deposited mud and sand in cohorts of storerooms and dams in the loess plateau of shannxi province, the authors point out a way how to resolve mud and sand deposit in cohorts of storerooms and dams in terms of landform features and the causes of soil and water loss

    摘要在對陜北黃土高原壩群泥淤積治理模式研究的基礎上,從該區地貌特徵、水土流失成出發,提出了解決壩群泥淤積的途徑。
  17. Thanks to all these factors the treasury of the holy trinity monastery of st sergius and the state museum of history and art in sergiev posad possess unique collections of veritable treasures

    正是這些素,至聖三位一體修道院的寶和謝爾蓋耶夫頗德的國家博物館收藏有獨一無二的貨真價實的珍品。
  18. The sediment problems of this project in design is that the deposition of sediment causing the permanent loss of reservoir capacity. the measure of enlarging the discharging of water and sediment can reduce deposition, but the concentration of sediment is bigger and much sediment passes through the pump - turbines

    減少水容淤積損失,加大排量,會造成在發生洪水時期水內含量加大,抽水時會有更多的泥過機,機組而磨損。
  19. Therefore, nowadays major problem is how to reduce the slope cultivated land ' s soil erosion and sediment concentration transporting to three gorges reservoir in order to prolong the three gorges engineering ' s use time and protect the safety of the middle and lower reaches channel of yangtze river

    此當前的主要問題是如何臧輕坡耕地土壤侵蝕,減少進入三峽區的泥量,延長三峽工程的運轉時間,保障長江中下遊河道的安全。另外,按土壤平均厚度78 。
  20. The reasons of wreckage of the reservoir are as follows : the inadequate, inefficient and outdated information about the reservoir, the lower anti - flood standard and the supervisor ' s ignorance of the reduction of reservoir capacity owing the a accumulated soils over years. so setting up the 3d model of danjiangkou reservoir : and mastering relevant information on water resources matter significantly not only to the dispatch and regulation of danjiangkou reservoir, but also to the forthcoming project of " water in the south to the north "

    失事的原多為:水文資料不足和未及時掌握水有關的水文資料,信息滯后,選用的防洪標準偏低;運行多年,內泥淤積使有效容大幅度減少而管理者對此又未及時掌握等。可見建立丹江口水三維模型,及時掌握有關水文資料,不僅對丹江口水的調度和管理,而且對即將實施的南水北調都有著深遠的意義。
分享友人