廠用機組 的英文怎麼說

中文拼音 [chǎngyòng]
廠用機組 英文
house machine
  • : 廠同「庵」 (多用於人名)
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : machineengine
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • 機組 : 1 [工業] (一組機器) set; assembling unit; machine set; plant unit; team; unit assembly 2 (飛機...
  1. It only took 38 months from construction preparation at the end of october, 2001 to the first unit operating on december 20, 2004, which antedated the construction time limit by 7 months

    樂灘電站從2001年10月底開始施工準備到2004年12月20日首臺投產發電,僅38個月的時間,比合理工期提前了7個月,並在此期間,搶回因壩部份地基巖溶地質問題延誤的5個月工期。
  2. Boeing said the main body of each 787 will arrive at its main assembly plant in six pieces from around the world

    波音公司說:裝客主體的6個件將從世界各地運抵西雅圖的主
  3. This paper simply introduces the device of on - line monitoring for the thrust of the rotating maching, then discu ed the finite dement analyses on the on - line monitoring elastic dement for measuring thrust in detail, in order to develop the performance of the se or and the device, we calculated the distribution of the stre 、 strain 、 axial di lacement in the elastic element using the finite element method when the axial forces f = 3 104n, the result is very satisfied

    簡單介紹大型旋轉軸向力在線監控裝置,然後詳細介紹軸向力測力彈性元件的有限元分析,為了提高所研製的測力傳感器的性能,採有限元方法計算了彈性元件在軸向力f = 3 104n時的應變、應力、靈敏度及軸位移等的分佈情況,分析結果表明:所設計的測力傳感器完全符合方的要求及儀表性能指標。
  4. In accordance with some wolfram - tin effuse come from cleaner in aconcentrating mill, this study adopt vibrate dslimes shaking table combining with centrifugal separator to put up a roughers. tousegravity - flotation and magnetic con - centration as combined proces s of technology, succeed in solving a problem of multipurpose returning in wolfram - tinslimes

    針對某選廢棄的鎢錫精選溢流進行了選礦試驗研究,採振動礦泥搖床與離心合粗選,運重選浮選磁選(水冶)聯合工藝流程,有效地解決了鎢錫細泥綜合回收問題。
  5. During recently 3 years, i mainly engaged in mechanical vocation ' s plant planning. i attended 25 projects, which including feasible reports, preliminary designing and working drawing designing, ranged over establishment or technology reforming of machine tool factory, gear factory, tractor factory, automobile manufactory, electric pump factory, electromechanics factory, electric cable factory, the highest investment of them is 160 million yuan, total design work expand over 850 million ( no repeat calculate ). for i have professional ability and well up in developmental situation of mechanical vocation and it ' s situation inside jiangsu province, these projects what i designed were all authorized by leading department and expert, introduced into national plan and bring into operation. these projects bring both economic profit and society profit for the factory ' s technical advancement, product ' s update. as the director of these projects in these designing and consultation work, i generally organize and operate these and earn the higher valuation of leading department and consumer

    近三年來主要從事械行業工工程設計,先後參與二十五個項目的可行性研究報告編制,初步設計和施工圖設計.涉及,齒輪,拖拉,汽車製造,電泵,電,電纜的新建或技術改造,其中單項投資額最高的為1 . 6億元,總計完成投資額為8 . 5億元(未重復計算)的設計工作量.由於對械行業發展狀況和省內狀況較為熟悉,具有一定的專業水平,這些設計項目均經有關領導部門,專家審定列入國家計劃,得以實施,為工的技術進步,產品更新換代,生產發展創造較好的經濟效益和社會效益.在這些設計,咨詢中,本人均任項目負責人,全面織,實施設計工作,得到主管部門和戶較高評價
  6. It has a certain meanings of the practical instructions and applications for the checking and repairing, installing, maintaining of the generator batteries of the kin ds of big or medium hydraulic power plants

    這對各大中型水力發電的檢修、安裝、維護具有一定的實踐指導意義和應價值。
  7. This paper analyse the feasibility and necessity of examine and repair about the qiangui co. ltd of generate electricity base on the frmework of guizhou wire network and the run state and exerience of the factory. at the same time, in the base of the lucubrate and analyse of stats examine in domestic and abroad, this paper has analyse the abrupt librate of steamer generator by online data check in pancountry power plant. it acquire obvious effect and prove the applicability and feasibility about the examine in power plant by take correspond measures to ensure the normal operate of the set

    本文根據貴州電網的結構形式以及黔桂發電有限責任公司的運行狀況和經驗,進行了黔桂發電有限責任公司實行狀態檢修的可行性和必要性分析,同時在深入研究分析國內外狀態檢修技術基礎上,對盤縣發電汽輪發電突發振動事例在線檢測數據進行分析、採取相應措施處理,使正常運行,取得了明顯的成效,同時也證明點檢與狀態檢修在火電的適性和可行性。
  8. In accordance with the characteristics of multi - units and high - lift pump station and the application to the actual project, the main pumping house and the auxiliary pumping house are arranged in combination with the intake pond, and then the understructure is integrated with the main pump house ; with which the working space is fully used with convenient management and investment saving

    摘要結合工程應,針對多、高揚程離心泵站的特點,將主副房及進水池結合布置,下部結構與主房形成整體結構,既便於維護管理,又節省投資、充分利空間。
  9. After technical innovation of no. 12 generator of qingshan power plant, the combustion adjustment test was performed and it was demonstrated that operation condition of the generators was improved by using of horizontal concentrated powdered coal burner technique

    摘要湖北青山電12號爐進行技術改造后進行了相應的燃燒調整試驗,試驗證明水平濃縮煤粉燃燒器技術的應改善了的運行狀況。
  10. Application of libr water cooling unit in linyi branch company

    溴化鋰冷水在我的應
  11. The # 9 and # 10 142mw heat supply units in gansu xigu power plant, the steam extraction main pipe system adopt westation control system of westing house company and deb coordination control policy in design. the coordination control policy successfully expand the whole the running range, from the normal running condition to abnormity running condition and start or stop condition, which simplicity base on burthen and main steam pressure coordination control

    甘肅西固熱電# 9 、 # 10142mw抽汽母管制供熱,選美國西屋公司westation控制系統,設計、應了deb協調控制策略,從單純作為負荷和主蒸汽壓力控制協調的基本功能,成功擴展到整個運行范圍,即從正常運行工況到異常運行工況及啟、停工況。
  12. The guizhou xishui power station ' s 135mw set are regareded as a example, the paper sets up a electric system ' s dynamic maths model, exploits a control configuration software basely on dcs power station simulator, and designs a software of simulator ' s logic protect ( include electric logic ) and control

    以貴州習水電135mw模擬的開發為實例,本文建立了以電氣系統為對象的動態數學模型,開發了一個基於dcs電站模擬的控制態軟體,並應態軟體設計了對象的邏輯保護(包括電氣邏輯)及控制部分的模擬軟體。
  13. In order to monitor on - line expansion difference during operation for lai cheng power plant in shandong province, this paper not only describes the realization of data acquisition, but also gives curve of rotor thermal stress according to stress caculation. furthermore improve traditional warming process. it can be observed that by means of the on - line system the start - up duration has been decreased for no. 1 unit of lai cheng power plant start up

    並依據萊城電的實際情況,經過理論計算給出了不同溫升率下的熱應力曲線,對傳統暖過程進行了一定的改進,可縮短啟時間,經萊城電1大修后冷態啟動檢驗完全符合實測值,證明本系統在實際運中具有廣泛的推廣價值。
  14. The author builds the units reliability increasing model based on the eigenvalue with equivalent practicable degree and usableness coefficient of the 200mw units of jingyuan power plant. the actual data indicated that the model can analyze the rising rule of units reliability may be analyzed by this model, and the data are transmited to all the management departments it provides basis for right management decision

    本文根據靖遠電200mw運行等效可度和可系數為特徵量建立了的可靠性增長模型,並經過了實際數據的驗證,表明採該模型可對的可靠性增長規律進行分析,並可將這些數據及時傳送到里各級生產管理部門,為正確的管理決策提供確切的依據。
  15. And these papers analyze and study the method ' s application in the i / a series dcs control system in panxian power plants. devised coupling precepts and communicate precepts about graded fuzzy controller in the i / a series dcs. it can gain favorable control effect by annalyzing control function and improve the economy and security of the pulverizing system

    本文對分級模糊控制在盤縣電200mwi / aseriesdcs集散控制系統中的應進行了分析和研究,設計了分級模糊控制器在i / aseriesdcs上的掛接方案和通訊方案,並通過對控制功能的分析能夠得到良好的控制效果,能夠提高制粉系統運行的經濟性和安全性,有著良好的工程應前景和價值。
  16. Meanwhi1e, improved method that is about existing prob1ems in fsss is taked out. the theory of fsss and pract ice are combined via working in practice

    設計及調試過程中以此為基礎並靈活運,摸索出一套火電fsss的技術改造的方式。
  17. Introducing and analysing the rebuilding project of the low pressure lube oil system, electronic and hydraulic system, and high pressure system, showing their advantages and disadvantages, after comparing their technical index, we finally determine the rebuilding project of the governing system of unit3 in feng zhen power plant - high pressure oil syetem. the

    針對目前個別電的低壓透平油系統、電液並存系統及高壓抗燃油的純電調系統改造方案分別進行了介紹和分析,對它們的優缺點進行了闡述,通過對各種指標的比較確定了豐鎮電3 #電調系統改造的最終方案一高壓抗燃油系統純電調方案。
  18. Three kinds of steel sphere and the backing sheet matching schemes have been put forward in this article according to the different circumstances. the matching schemes are studied in detail by inner mongolia hai bowan power plant ( 100mw unit ) and feng zhen power plant ( 200mw unit ). and the suitable matching schemes are selected for two plants

    並且分別以內蒙古海勃灣發電( 100mw)和內蒙古豐鎮發電( 200mw)為例,對上述三種方案和近年來我國火力發電普遍採的幾種方案進行了較為詳細的探討,經過技術經濟分析和比較,為以上兩個發電確定了經濟合理的鋼球和襯板匹配方案。
  19. The paper detailed analyses the present strengthening methods according to the characteristics of power plant structures, and provides strengthening methods adapting to power plant structures according to the testing results of strengthening joints packed steel outside, and that of long column and short column, similarity, the difficulties calculating the column of boiler are analysed, and the solutions are provided

    本文以河南平頂山姚孟電1 #的檢測鑒定和加固為例,全面介紹電結構的檢測鑒定情況。針對電結構的特點,對現有加固方法做詳細分析,根據外包鋼加固節點和長、短柱的試驗結果,提出適於電結構的加固方法。
  20. This software was used in some power plant in ningxia. it is shown that it is feasible to adopt the configuration, identifying and requesting way in the calculation of thermal performance test of steam turbine. it has a quickly computing speed and high precision

    這一軟體在寧夏某電330mw額定負荷下進行驗證計算,結果表明,所採態、識別和求解演算法是可行的,且計算速度快,精度高。
分享友人