戧堤 的英文怎麼說
中文拼音 [dī]
戧堤
英文
banquette-
On the formation mechanism, the rills were mainly formed by the concentrated action of the runoff on dyke slope, while the formation of socket mainly depended on surface runoff, subsurface flow and the existing defects within the dykes such as crack, mouse hole, fox and brocks dens
在成因上,前者主要是降雨形成超滲地面徑流的集中對戧坡的侵蝕作用而形成;後者主要與坡面徑流、壤中流,以及土堤的薄弱點(如裂縫、鼠洞、狐1一灌洞等)有關。Based on the analysis of the data and information from the field observations and lab experiments, the results were as follows : ( 1 ) the results of the simulated rainfall and runoff erosion experiments in lab. under the design experiment conditions including the constant rainfall intensities of 1. 0, 2. 0, 3. 0mm / min and the rainfall durations of 30, 70 minutes and with soil moisture content 9. 5 % or 10. 0 % for dry situation, as well as with the soil moisture content 19. 0 % or 20. 0 % for wet situation, the soil erosion increased nonlinearly with the rainfall intensity, and the rainfall duration. the results of the experiments indicated that the amount of soil erosion caused by the simulated rainfall and runoff on the dry - soil slope was more than that on the wet - soil slope
通過實地觀測及室內試驗資料分析,得到如下研究成果: 1 、室內模擬降雨徑流對戧坡的侵蝕試驗研究結果在定雨強為1 . 0 、 2 . 0 、 3 . 0mm min ,降雨歷時30 、 70分鐘,干土含水量為9 . 5 10 . 0 ,濕土含水量為19 . 0 20 . 0的條件下,侵蝕量與雨強成非線性正比關系;雨強大,侵蝕量大;降雨歷時長,侵蝕量也大;堤坡含水量大時,侵蝕量小,堤坡含水量小時侵蝕量大。Preliminary analysis on seepage discharge of closure dike
截流戧堤堰體滲流量初步研究The solidity dykes is the basic guarantee. with the heightening of the dykes of the yellow river every year, it became higher and steeper. there are many rills and puddles on the dyke slopes
由於黃河大堤逐年加高,大堤形成了高且陡的土坡,每逢暴雨後,在黃河大堤堤坡和戧坡區常有條條水溝以及戧臺區的、水穴(浪窩) 。分享友人