拆除成本 的英文怎麼說

中文拼音 [chàichúchéngběn]
拆除成本 英文
demolition costs
  • : 拆動詞[方言] (排泄大小便) excrete
  • : Ⅰ動詞1 (去掉) get rid of; eliminate; remove 2 [數學] (用一個數把另一個數分成若干等份) divide:...
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : i 名詞1 (草木的莖或根)stem or root of plants 2 (事物的根源)foundation; origin; basis 3 (本錢...
  • 拆除 : demolish; dismantle; remove; pull down
  1. Marginal analysis can be used in comparing factors other than costs and revenues.

    邊際分用於和收入外,還可以用於比較其它因素。
  2. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土型質量和工程進度;在二期混凝土施工區域,為免人工鑿毛勞動強度,採用永久性免金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程為名符其實的「世界一流工程」為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  3. In this paper, the state of the art of the engineering controlled explosion and the finite element method ( fem ) are reviewed. in order to analyze and simulate the demolishment of frame - structured buildings due to controlled blasting, the method of killing or activating elements, a high level technique in fem, and the special element - solid65 are introduced to the blasting field first in china by the author

    文回顧和總結了工程式控制制爆破和有限單元法的發展歷史及其研究現狀,在國內首次把單元生死法這一有限元高級處理技術和ansys軟體中特有的solid65單元引入到爆破工程領域,用其進行框架結構樓房爆破的計算機模擬,探討了構件在完全破壞前的應力、應變、裂縫生和塑性鉸形位置。
  4. With the foundation of china unicom in 1994, the prelude of the reform of china telecommunication began. china telecommunication market has broken the monopoly control by post - telecommunication ministry as far

    1994年聯通公司的立,拉開了中國電信業分、重組的序幕,目前中國電信市場已經基了原來由郵電部統一經營管理的局面。
  5. The system is one module of the demolition blasting expert system developed by the professor fangzefa and doctor yehaiwang of wuhan university of technology. the demolition blasting expert system is made up of the following four modules : the plate demolition blasting, the building and frame building demolition blasting, the soaring structure demolition blasting, the thin - wall vessel demolition blasting. the building and frame building demolition blasting module is composed of the brick building and the brick - concrete building and the frame building demolition blasting

    文研究的對象是框架結構樓房爆破專家系統,該系統是武漢理工大學房澤法教授、葉海旺博士開發的爆破專家系統四大模塊:板(塊)體爆破、樓房框架爆破、高聳建築物爆破(已開發) 、薄壁容器類構築物爆破所組爆破設計專家系統中樓房框架爆破模塊其中的一個子模塊,樓房框架爆破專家系統包含磚結構類樓房、磚混結構類樓房和框架結構類樓房三大類。
  6. In addintion to the traditional storage service, we can offer modern warehousing services including consolidation, unstuffing, stuffing, processing, package and distribution services. we have warehouses in shekou, yantian, guangzhou and other main ports of china, can help our customers competitive warehouse rent redustion then get the lowest logistics cost at all

    我司在深圳鹽田,蛇口,廣州,上海等主要港口均設有自己的倉庫,了滿足傳統意義上的儲存功能外,還可提供生產加工,拼箱,箱,配送以及包裝與流通加工等增值功能,能最大限度地滿足客戶的需求,實現為客戶有效降低在廠庫存,減少物流的顯著效果。
  7. In the paper, the following main factors are studied, such as developing the expert knowledge - base based on the special knowledge of the explosive demolition of frame building, designing the object - oriented expert system of the explosive demolition of frame building, developing the neural network training example base based on projects, developing the forecasting mode of blast effects with matlab 6. 1, developing the expert system of explosive demolition of frame building with visual b 6. 0, carrying out the connection of the expert system and forecast mode. the system consisted of eleven functional modules, such as the input of initial parameters module, the choice of the blasting method module, the choice of blast mode module, the design of blasting parameters module, the design of charge module, the verifying blasting safety module, the calculating safety of tumble module, the design of detonating net module, the blast effects forecasting module and the calculating volume module

    文的研究內容有:以框架結構樓房爆破領域的專業知識為基礎製作專家系統知識庫;設計一般面向對象的框架結構樓房爆破設計的專家系統;搜集相關爆破工程實例製作用於爆堆效果預測神經網路訓練的樣數據庫;選取適當的輸入輸出因素,用matlav6 . 1構建爆破效果預測神經網路模型;用vb6 . 0編程開發出框架結構樓房爆破專家系統,並實現爆破效果預測神經網路模型和專家系統的鏈接。該系統由初始參數輸入、倒塌方法選取、倒塌方案確定、孔網參數設計、缺口形狀及參數、爆破安全校核、傾倒安全校核、爆破網路、爆破效果預測、工程量計算、計算設計說明書等十一大功能模塊組
  8. Since the abolition of the interest rate rules of the hong kong association of banks, deposit rates, in particular those for large time deposits, have, after adjusting for bank overheads for accepting retail deposits, followed more closely the wholesale interest rates in the interbank market

    市場競爭使存戶及借款人同樣受惠:香港銀行公會撤銷利率規則以來,存款利率尤其大額定期存款在扣接受零售存款的后已較為跟貼銀行同業大額借息率。
  9. Method : the loss of physiologic bend of spine after implants were taken out along with different methods of hone implantation of 59 followed - up patients with thoracic - lumbar fractures treated by posterior instrumentation during jan. 1990 to may. 2004 were analysed by standard of image examination

    方法:以影像學結果作為觀察指標,統計院1990年1月~ 2004年5月因創傷造的胸腰椎骨折病例早期行後路內固定術治療情況,並分析隨訪的59例患者術中不同的植骨方法,對內固定后脊柱生理曲度丟失的影響。
  10. If the building is repairable but the insured wishes it to be demolished, the amount equivalent to the building ' s repair costs is paid in full as soon as the building has been demolished

    如果建築物是可修復的,但被保險人希望該建築物,建築物被時立即支付相當于該建築物修復的金額。
  11. The primary conclusions are drawn in this paper on these points : ( 1 ) after the blasting data of delayed time and height are gained based on the theory of gradually disintegration, the elements need to kill are executed similar with destroying the part of the building. then the pre - condition cg solver is pitched on to execute the nonlinear analysis

    文的主要果如下: ( 1 )根據逐段解體法爆破設計的原理,計算秒延差時間和爆破高度,在已劃分網格的有限元模型中殺死擬爆的部分單元,使整體結構處于失穩狀態下,然後利用前置條件共軛梯度法求解器對結構進行材料和幾何非線性求解。
  12. In all, it is viable to simulate the blasting process of frame - structured building by means of fem and the results from this paper can help to optimize design of controlled blasting

    文的研究果可見,用有限元對框架結構樓房爆破進行模擬是可行的,計算結果可靠性較好,能為爆破工程設計提供科學的證據,也能比較準確的預測爆破效果。
分享友人