拖帶指令 的英文怎麼說

中文拼音 [tuōdàizhǐlìng]
拖帶指令 英文
towage order
  • : 動詞1 (拉著物體使移動) pull; drag; draw; haul 2 (用拖把擦洗) mop 3 (在身後耷拉著) trail 4 ...
  • : 指構詞成分。
  • 拖帶 : traction; pulling; towing
  • 指令 : 1 (指示; 命令) instruct; order; direct2 (上級機關對下級機關的指示) instructions; order; direc...
  1. Hitler took goering, his second in command, to the german command in the west in a haste and issued the order that retreat was not allowed and the german soldiers must hold off allied offensive to the last man

    希特勒著空軍元帥戈林(他的第二把手)匆忙趕到德軍西線揮部,命部隊不準後撤一步,必須死死地住盟軍,戰至最後一槍一彈一兵一卒!
  2. What is more, based on the computing model of the finishing time per piece of flow shop scheduling in the parallel movement, the paper analyzes the subordinate function of its finishing time per piece in respective conditions of definite due date and fuzzy due date, and mutual relationship of two objective functions between minimization of delayed term and maximization of general satisfaction, pointing that the former is the subset of the latter. and representing the satisfaction level of the manager toward finishing time of the piece with the subordinate function of fuzzy due date, making general satisfaction level as objective function, the paper accordingly sets up a mathematical model in the condition of fuzzy due date, and designs a computer simulating system in light of genetic algorithm to carry on an emulation experiment

    在平行順序移動方式下flowshop調度問題的工件完工時間的計算模型基礎上,分析了固定交貨期和模糊交貨期時該問題的工件完工時間的隸屬函數,及總期最小化和總滿意度最大化這兩個目標函數的相互關系,出前者西南交通大學博士研究生學位論文第頁問題是後者問題的一個子集,用每個工件模糊交貨期的隸屬函數表示決策者對該工件完工時間的滿意度,以總滿意度為目標函數,相應地建立了該問題下模糊交貨期的數學模型,設計了一個基於遺傳演算法的計算機模擬系統進行模擬試驗,結果是人滿意的。
分享友人