挖泥設施 的英文怎麼說

中文拼音 [shèshī]
挖泥設施 英文
dredging facility
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • 設施 : installation; facilities
  1. In this paper, the method combined the “ s ” shape sediment control dam with the dredged channel has been put forward

    為此,在比較各種疏浚方案效果的情況下,提出了槽與增折線型防淤堤相結合的清淤疏浚措
  2. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏浚槽的回淤量,必須依靠控制上游來沙量、調整入水口門位置、加防淤堤及提高庫水位等手段,而不能通過調整槽寬度、位置及數量等措來達到目的。
  3. This paper summarize the estuary sediment management methods also, analyze and the following aspects and give evaluations : estuary dredging and lead the flow, lead water to scour the river channel, build the xihekou reservoir, estuary gate deposition management, dike reinforced etc

    本文還對河口沙的處理途徑和措進行了概括總結,對河口疏浚與導流、引海水沖刷河道、建西河口水利樞紐、攔門沙治理、人工有計劃改道和出漢、加高堤防和加固防護工程和河固堤工程等進行了分析評價。
  4. By analyzing the developing situation of the trenchless technology at home and abroad, and combining the characteristics of the modern computer multimedia technology, the article brings forward that it is necessary to design the multimedia training system on horizontal directional drilling. then base on introducing the content of horizontal directional, the article puts forward the scheme of overall, engineering reconnaissance, slurry knowledge, construction principles, construction process, construction equipment, construction design model, the function, the designing technology, the applying forefound and the mending plan of the the multimedia training system on horizontal directional drilling

    本論文從國內外非開技術的發展情況分析,以及結合現代計算機多媒體技術的特性,提出開發「水平定向鋪管技術多媒體培訓系統」的必要性;並在簡略介紹水平定向鉆機鋪管技術的基礎上,給出開發「水平定向鋪管技術多媒體培訓系統」的「總論」 、 「工前工程勘測」 、 「漿處理」 、 「工原理」 、 「工工藝」 、 「工機具」和「計」七大模塊的具體計方案、實現的主要功能和系統開發的關鍵技術,最後分析了該系統的應用前景和改進方向。
  5. On the assumption that swc piling works will be carried out by drilling rigs mounted on barges with suitable mitigation such as silt curtains, the construction of the bridge will not cause any non - compliance with water quality objectives for deep bay ; and

    深港西部通道的打樁工程將以裝于躉船的鉆機進行,並輔以適當的緩解措,如置淤網,興建大橋將不會導致水質不符合后海灣水質指標的情況;及
  6. During construction, special building methods were used to limit environmental damage, such as the piles being bored into the seabed rather than pile driven, to avoid mud sediment settling on the corals and killing them. most of the superstructure was prefabricated off - site, brought in by barge and then placed in position by crane to minimise the pollution, rubbish and noise

    例如裝支撐中心的樁柱時採用鉆形式,取代普通的打樁方式,務求減少翻起海床的沙,避免珊瑚窒息及死亡大部份上層建築組件是在建築地點以外的地方預先製作,並由駁船運到海下,再以吊車裝嵌,從而把工帶來的污染垃圾及噪音減至最少。
  7. A thorough evaluation of both the south brothers and east of sha chau facilities was undertaken to determine the acceptability of predicted impacts to water quality from dredging, backfilling and capping of the pits and other concurrent activities

    進行了深入評估,以確定這些回填和封蓋以及同期進行其他相關活動時,對水質
  8. The purpose of the assessment was to thoroughly evaluate both the south brothers and east of sha chau facilities in terms of the acceptability of predicted impacts to water quality, marine ecology, fisheries, hazard to health, noise and cultural heritage from dredging, backfilling and capping of the pits, as well as the residual impacts and those from concurrent activities

    這評估的目的是深入評估磨刀洲南部及沙洲東部,就掘回填及封蓋坑對水質海洋生態漁業健康危害噪音及文化遺產可能造成的影響,並對剩餘影響及同期進行其他相關活動時的影響,作出全面評估。
  9. Endless past, present and future works on dredging, dumping, facilities installation, and pollution also pose threats to our marine ecology

    過去現在和將來不斷進行的傾倒垃圾和興建工程,加上污染問題,嚴重威脅海洋生態。
  10. Under the condition of applied technology based on internet combined with intellective computational ways and traditional marine condition monitoring, we can construct a new failure diagnosis system ( to develop a distance condition monitoring and failure diagnosis system for main mechanic equipments ) in dredger. it can offer timely credible technical guidance and steps to dredging technician. it is satisfied with the need of dredging security, equipments " condition monitoring and failure diagnosis, maintenance decision of the shipping and its base

    將基於internet的應用技術、智能計算方法與傳統的船舶狀態監測與故障診斷技術相結合,在具有首沖功能的300方自航耙吸船上構造一種全新的故障診斷系統,即開發一套基於網路的船主要機械備遠程狀態監測和故障診斷系統,為疏浚作業的技術人員提供及時可靠的技術指導和處理措,滿足疏浚作業安全、備狀態監測和故障診斷、實船和基地管理和維修決策的需求,提高備利用率和管理水平。
分享友人