挖隧道 的英文怎麼說

中文拼音 [suìdào]
挖隧道 英文
tunnell
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. The government spokesman said, " in fact, the cut - and - cover method would be more costly, lengthy and difficult for the kcrc contractor, as compared with bored tunnelling

    政府發言人說:事實上,對九鐵公司的承建商來說,明回填方式比鉆挖隧道方式更為昂貴,所需時間更長,而且難度更高。
  2. What is that thing ? - some kind of tunneling machine

    那玩意兒是什麼? -像是個挖隧道的機器
  3. - what is that thing ? - some kind of tunneling machine

    -那玩意兒是什麼? -像是個挖隧道的機器
  4. Analysis of ground deformation for shallow tunnel in shenzhen city

    深圳地鐵淺埋暗挖隧道地層變形分析
  5. Shallow depth excavation method and ground settlement control

    地鐵淺埋暗挖隧道地層沉降因素及控制對策
  6. Another collecting a debt, another trying to dig a tunnel

    想著有人欠著我的債,想著有人試圖挖隧道逃跑。
  7. Analysis of large deformation regularity in stratum above metro tunnel

    地鐵暗挖隧道上覆地層大變形規律分析
  8. Analysis on ground surface deformation induced by undercutting under shallow overburden in tianjin metro

    天津地鐵淺埋暗挖隧道地表變形分析
  9. Construction technique for the shallowly buried and darkly excavated tunnel on the cobble water - rich stratum

    砂卵石富水地層淺埋暗挖隧道施工技術
  10. Analysis and control of stratum settlement of shallow - buried concealed tunnel excavation works of urban subways

    城市地鐵淺埋暗挖隧道地層沉降分析與控制
  11. For the " bored tunnel option ", a deep tunnel has to be built below existing seabed level

    至於採用鉆挖隧道方法,則需要在現時的海床深處興建一條
  12. In order to facilitate selection of tbms in a project based on engineering geology and hydrogeology conditions, project characteristics and environmental constraints, it is necessary to understand the operation mechanisms of different tbms and classify them accordingly

    本文介紹了各種類型的全斷面掘進機的運行機理,並根據最終開挖隧道斷面,掌子面的支護類型及巖土體的破碎機理對全斷面掘進機進行分類。
  13. Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation

    摘要針對深圳地鐵淺埋暗挖隧道施工中影響地表下降及地層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放地下水、根據地層條件選擇施工方法、增大左右線面的距離、合理確定開進尺、提高施工效率、加強初期支護、及時施作二次襯砌等對策。
  14. 3. 3 in particular, the potential hydrological problems caused by tunnel boring operation and portals construction may impose significant impacts on the underground hydrology of long valley

    3 . 3鉆挖隧道及興建口仍可能對?原地下水水文造成損害。
  15. By face failure and ground subsidence investigation and in - suit monitoring analysis in some lots of shenzhen metro phase line, especially of lot 3a in which two large ground landlides have occurred in construction, the reasons of ground subsidence are expatiated respectively from three aspects, including the characters of the physical mechanical parameters of stratum above tunnel, the monitoring analysis of stratum deformation and contruction technics causation

    通過對深圳地鐵期工程土建施工中全線部分暗標段出現的工作面失穩、地表塌陷工程實踐和現場監測結果分析,特別著重對連續2次出現地表塌陷的3a標暗挖隧道研究,從上覆地層物理力學性質參數、地層變形監測分析及施工工藝原因3方面闡述了地表塌陷的原因。
  16. Slope instability problems ; piles ; excavations ; tunnels

    斜坡的不穩定性;樁;深開
  17. No young person shall be employed to work underground in any mine or quarry or in any industrial undertaking involving a tunnelling operation

    任何人不得僱用青年在礦場或石礦場進行地底工作,亦不得在工業經營內擔任涉及開挖隧道的工作。
  18. Andy was right. i finally got the joke. it would take a man about six hundred years to tunnel under the wall with one of these

    「安迪是對的,我終于明白他為什麼發笑了。如果用這種石錘在墻下挖隧道,會讓一個人上六百年! 」
  19. The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood

    在廣東沿路和前水警總部地底的鐵路,會以鉆挖隧道方式建造,除了在廣東政府合署現址附近的工地內開地面以便興建新車站及引進機外,需要在廣東路面進行的工程規模會很少,以便盡量減少對毗鄰環境的影響。
  20. In addition, wwf hong kong is greatly concerned about the potential impacts of the proposed bored tunnel option on the ecology of long valley

    世界自然基金會十分關注建議的鉆挖隧道方案對?原生態構成的潛在影響。
分享友人